Notice ID: 309ad9e38fc2491caef2e58b67b8d2b3Solicitation
Tulsa ANG Fuel Facility
Archived on October 24, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- September 24, 2020
- Notice type
- Solicitation
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST TULSA
- Place of performance
- Tulsa, OK, 74115
- Last updated
- Apr 29, 2026
Identifiers
- Solicitation number
- W912BV20R0031
- Notice ID
- 309ad9e38fc2491caef2e58b67b8d2b3
Description
The U.S. Army Corps of Engineers Tulsa District has been tasked to solicit for and award a contract for a Fuel Facility for the OKANG in Tulsa County, Oklahoma. The proposed project will be a competitive, firm-fixed price, design/bid/build contract procured in accordance with FAR 15, Negotiated Procurement using the Lowest Price Technically Acceptable selection process. The Government is seeking qualified, experienced sources capable of performing the following: The scope includes constructing three (3) 50,000 gal (each) welded horizontal steel above-ground fuel storage tanks complete with railings and associated necessary appurtenances, two commercial truck unloading stands with equipment canopies, two re-fueler loading stands with optional equipment canopies, enclosed Electrical Control House and Open Shelter Filter house, Fuel Operations Facility(building) with fuel testing laboratory, Re-fueler Vehicle Parking with cement concrete parking, secondary containment, and R-11 maintenance building. Additionally, the project includes constructing a Military Service Station (MSS) consisting of 8,000 gallons of diesel storage with two dispensing nozzles, 8,000 gallons of Motor Gas (MOGAS) storage with two dispensing nozzles, equipment, optional MSS dispensing area canopy, MSS Control Building, and secondary containment for tanks, offloading and dispensing. Site preparation will include extension of utility systems to site, preparation of site for above listed improvements, local streets and roads to support the above listed improvements, construction of site drainage retention and storm drainage systems; and construction of site security fencing and gates. In accordance with DFAR 236.204, the estimated magnitude of construction for this project is: Between $10,000,000 and $25,000,000. Estimated duration of the project is 545 calendar days. The North American Industry Classification System code for this procurement is 237120 - Oil and Gas Pipeline and Related Structures Construction, which has a small business size standard of $36.5M. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement. TYPE OF SET-ASIDE: This is an Unrestricted procurement.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912BV20R0031- Market Research
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Market ResearchMar 25, 2020
Tulsa ANG Fuel Facility
- 13×SolicitationCurrentAug 10, 2020
Tulsa ANG Fuel Facility
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2. | 48% | Pre-Solicitation | 10/06/2026 |
Login at https://piee.eb.mil and search for 'W91QVN26RA089' to obtain more details.* | 48% | Solicitation | 08/20/2026 |
This is a pre-solicitation notice to all certified, interested 8(a) Small Business Development Program Participants for the proposed Firm-Fixed-Price (FFP) competitive acquisition under solicitation W9128F27RA012 - API 653 Fuel Tank Repairs and Maintenance ? Eielson AFB, Alaska, as outlined herein. The U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Proposal (RFP) on/or about October ? November 2026. The Primary North American Industry Classification System (NAICS) code for the solicitation is 237120 ? Oil and Gas Pipeline and Related Structures Construction, with a size standard of $45.0 Million. This acquisition includes the repair and maintenance of five vertical aboveground fuel storage tanks located at Eielson AFB in Fairbanks, Alaska. The attached DRAFT Scope of Work (SOW) details the scope of the requirement to be executed in accordance with the terms of the proposed contract. Please see the Pre-Solicitation Notice document for more information. | 47% | Pre-Solicitation | Open |
This is a Sources Sought Notice for informational/market research purposes. This notice is to gather information on the interest, capabilities, and qualifications of businesses in the industry. The intent is to procure construction services to provide repair and maintenance of five vertical aboveground storage tanks at Eielson AFB, AK. Due to the nature and location, the construction season is generally limited to the timeframe of May through September. The work will be phased over two construction seasons. | 47% | Market Research | 07/10/2026 |
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks. | 46% | Solicitation | 01/25/2027 |
Additional Details
Solicitation Number
W912BV20R0031
Archive Date
Oct 24, 2020
Office Address
TULSA, OK, 74137-4290