Notice ID: 332b65a951f2416a8dd27644e36c8c2eSolicitation
Interior Least Tern (ILT) Dredging and Maintenance
Archived on August 27, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- August 4, 2021
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST TULSA
- Place of performance
- Muskogee, 74403
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912BV21Q0075
- Notice ID
- 332b65a951f2416a8dd27644e36c8c2e
Description
Amendment 1 THE PURPOSE OF THIS AMENDMENT IS TO: 1. Extedn the Request for Quote due date from 05 Aug 2021 to 12 Aug 2021 2. Update FAR Clause 52.222-8, Payroll and Basic Records and 52.244-6, Subcontracts for Commercial Items 3. The POC for this action is Caroline Wallace, Contractor Support, Caroline.a.wallace@usace.army.mil SEE SUMMARY OF CHANGES IN W912BV21Q00750001 The Contractor shall furnish all equipment, labor and supplies for dredging at river mile (RM) 376.5 (Figure 1, Spaniard Creek Island) followed by grading and contouring in the McClellan-Kerr Arkansas River Navigation system (MKARNS). Estimated quantities of material to be dredged are a minimum of 7500 cubic yards at RM 376.5, Spaniard Creek Island. Depending on price per cubic yard and funding available, as much as 10,000 cubic yards of additional dredge material disposal could be authorized. The Contractor shall furnish all equipment, labor and supplies for grading and contouring at river mile (RM) 354.5 (Figure 2, Stoney Point Island) in the McClellan-Kerr Arkansas River Navigation system. No dredging will take place at river mile (RM) 354.5 Stoney Point Island, previously placed dredge material will be graded and contoured. Typical materials to be dredged will consist of sand and silt. No rock removal will be required under this contract. Dredge material will be disposed of in areas identified by the Contracting Officer or the Technical Manager. Deposited dredge material will be contoured to an approximate grade no greater than a 3-foot rise per 100 feet above the navigation system base pool elevation of 490 mean sea level (MSL). This price shall include dredging, mobilization and demobilization, movement and laying of discharge pipe, movement between dredge sites, and grading and contouring of dredged material within disposal area described within this specification. This project will be a total turn-key contract with all work being performed by the Contractor.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912BV21Q0075- Market Research
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchJun 29, 2021
Interior Least Tern (ILT) Dredging and Maintenance
- 2×SolicitationCurrentJul 16, 2021
Interior Least Tern (ILT) Dredging and Maintenance
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912BV21Q0075
Archive Date
Aug 27, 2021
Office Address
TULSA, OK, 74137-4290