Notice ID: 5c6a0562746c44ae84d46cce92ef12f7Solicitation
Heyburn Lake Baffle Blocks Replacement
Archived on May 8, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- May 16, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W076 ENDIST TULSA
- Place of performance
- Kellyville, 74039
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912BV24B0002
- Notice ID
- 5c6a0562746c44ae84d46cce92ef12f7
Description
The scope of the project aims to address the deteriorated condition of baffle blocks within the Heyburn Lake spillway structure at Heyburn Lake, Oklahoma. Baffle blocks play a crucial role in regulating water flow and preventing erosion, ensuring the stability and longevity of the spillway. Based on inspections conducted, it has been observed that several baffle blocks require immediate replacement due to significant damage and degradation. The main tasks include:? Constructing and maintaining upland temporary access/haul roads for work access. No fill within the channel or stilling basins will be permitted.? Removing riprap, coarse aggregate, silt, debris, and other foreign material within the stilling basin around the baffle blocks.? Replacing displaced baffle blocks as per the Plans and Specifications provided.? Restoring any constructed or damaged access/haul roads used during the performance of the project.Heyburn Lake is a reservoir on Polecat Creek in Creek County, Oklahoma. It is about 15 miles (24 km) southwest of Sapulpa, Oklahoma. Tiger and Brown Creeks also drain into the lake. The nearest town is Kellyville, Oklahoma.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912BV24B0002- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 5×SolicitationCurrentApr 5, 2024
Heyburn Lake Baffle Blocks Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912BV24B0002
Archive Date
May 8, 2025
Office Address
TULSA, OK, 74137-4290