GovChime
Notice ID: 5c6a0562746c44ae84d46cce92ef12f7Solicitation

Heyburn Lake Baffle Blocks Replacement

Archived on May 8, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
May 16, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST TULSA
Place of performance
Kellyville, 74039
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912BV24B0002
Notice ID
5c6a0562746c44ae84d46cce92ef12f7

Description

The scope of the project aims to address the deteriorated condition of baffle blocks within the Heyburn Lake spillway structure at Heyburn Lake, Oklahoma. Baffle blocks play a crucial role in regulating water flow and preventing erosion, ensuring the stability and longevity of the spillway. Based on inspections conducted, it has been observed that several baffle blocks require immediate replacement due to significant damage and degradation. The main tasks include:? Constructing and maintaining upland temporary access/haul roads for work access. No fill within the channel or stilling basins will be permitted.? Removing riprap, coarse aggregate, silt, debris, and other foreign material within the stilling basin around the baffle blocks.? Replacing displaced baffle blocks as per the Plans and Specifications provided.? Restoring any constructed or damaged access/haul roads used during the performance of the project.Heyburn Lake is a reservoir on Polecat Creek in Creek County, Oklahoma. It is about 15 miles (24 km) southwest of Sapulpa, Oklahoma. Tiger and Brown Creeks also drain into the lake. The nearest town is Kellyville, Oklahoma.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912BV24B0002
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentApr 5, 2024

    Heyburn Lake Baffle Blocks Replacement

    Notice 5c6a0562746c44ae84d46cce92ef12f7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912BV24B0002

Archive Date

May 8, 2025

Office Address

TULSA, OK, 74137-4290