Notice ID: cfa8e0d5ab0346ea8d15bffd2f71ab5bAward NoticeAwarded
Camp Funston Railhead Improvement
Awarded on October 7, 2019. Full description on SAM.gov.
Awarded tounder W912DQ20C4000 (source: SAM.gov award notice)• $4.5M
Overview
- Posted
- October 7, 2019
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Camp Funston, Fort Riely, KS
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
- Award date
- Oct 7, 2019
- Award amount (SAM.gov award notice)
- $4.5M
Identifiers
- Solicitation number
- W912DQ19R4024
- Notice ID
- cfa8e0d5ab0346ea8d15bffd2f71ab5b
- Award number (PIID)
- W912DQ20C4000
Description
Draft RFP and Bidder Inquiries. Amendment 0003 is being uploaded correctng the CLIN structure.
Award Overview
Award Number
W912DQ20C4000
Award Amount (SAM.gov award notice)
$4.5M
Award Date
Oct 7, 2019
Awardee
Awardee UEI
L4NFXK15G6X9
Original Solicitation
Notice ID: cfa8e0d5ab0346ea8d15bffd2f71ab5b
Posted Date: Oct 7, 2019
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DQ19R4024- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 5×Pre-SolicitationJul 17, 2019
Camp Funston Railhead Improvement
- 2×SolicitationAug 14, 2019
Camp Funston Railhead Improvement
- Pre-SolicitationAug 14, 2019
Camp Funston Railhead Improvement
- 2×AwardedCurrentOct 7, 2019
Camp Funston Railhead Improvement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 18 November 2026 at 9:00AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, and to also provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2028 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $37 million Magnitude of Construction: $100 - $500 million Project Title: Tampa Harbor Improvements Industry Day. Purpose: The purpose of this scheduled Industry Day is to provide the latest information regarding the future advertisement and award of Contract 1 for the Tampa Harbor Deepening Project. The scheduled event will include a detailed presentation by the Jacksonville District US Army Corps of Engineers, Tampa Harbor Project Delivery Team (PDT) followed by open Q&A and 1-1 meeting opportunities with contracts to ask more in-depth questions and get feedback as the design and permitting moves forward. Project Description: The project includes construction dredging to deepen and widen specified areas within the federal navigation channel of Tampa Harbor. The project is planned for six (6) contracts over an estimated 8–10-year period. The Scope of Work for this Industry Day will be focused on Contract 1. Contract 1 work includes deepening of Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel and Cut-D (HB) to a depth of 49 feet MLLW, deepening the Port Sutton Terminal Channel to a depth of 44 feet MLLW, and deepening the East Bay Channel Extensions 1 and 2 to a depth of 41 feet MLLW. The Contract 1 work also includes widening of Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All dredged material from the project will be disposed of in the East Bay Placement Area, DMMA 2-D and DMMA 3-D. Estimated quantities to be dredged are roughly 4.4 million cubic yards. Link to the Tampa Harbor Improvements USACE website: https://www.saj.usace.army.mil/Tampa-Harbor/-30-/ Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: 1. Company/Contractor name, address, point of contact, phone number and e-mail address. 2. Does the Contractor plan to submit a proposal for this contract? 3. Describe the proposed construction methods and sequencing and equipment needed to complete the project. At a minimum, address pre-dredging, side-casting of pre-dredging material, and placement into the East Bay Placement Area including constructing the containment perimeter and filling within the area. The contract will include geologic data of the dredge and placement areas as well as the geotechnical requirements for materials considered suitable for constructing the containment perimeter. The contractor will propose the dredging sequence to accomplish constructing the containment perimeter that meets required geotechnical specifications. Describe the factors considered in determining the dredging sequence, such as the material type, proposed equipment, proximity to the placement area, etc.? 4. Describe any constructability, stability, safety concerns with East Bay Placement Area. Describe additional equipment or methods required to place infill above water and/or above the proposed crest of the containment perimeter. Describe any concerns for drainage of the placement area. 5. Describe how filling the East Bay Placement Area will not result in material migrating out of the placement area and into the federal channel. At a minimum, address how existing soft material at the placement area will be contained when disturbed. 6. Will the proposed East Bay Placement Area construction methods require equipment to be located within the federal channel for extended periods of time acting as obstructions for vessel traffic, or obstruct Port Tampa Bay Berth 150? 7. For East Bay Placement Area, describe any temporal facilities, staging and laydown areas, and utilities that would be required or preferred in adjacent upland areas. 8. Dredging and placement of material will be conducted in a manner to minimize turbidity. Describe the turbidity control measures, such as turbidity curtains, that would be incorporated into the proposed construction methodology. If hydraulic placement of infill is proposed for the East Bay Placement Area, describe how affluent will be managed. 9. Based on prior dredging construction experience either in Tampa Bay or other locations in Florida, what are some of the challenges USACE could streamline to improve contract execution? 10. Describe any concerns with execution of the environmental species monitoring and reporting. Event Date: Wednesday, 18 November 2026 at 9:00 AM EST. Event Location: Port of Tampa – Cruise Terminal 6 1331 McKay Street Tampa, Florida 33602 *Parking available onsite For more information, please see the Industry Day Agenda copy under the Attachments. Contact Info: Manny Vianzon, Project Manager (904) 232-3292 Emmanuel.A.Vianzon@usace.army.mil If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 212 869 457 Passcode: tG6Ff3Gt Join by phone: 604-262-2433 Phone conference ID: 972 118 411# NOTES: NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE VIRTUAL INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance. | 69% | Special Notice | 11/18/2026 |
FY27 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS | 69% | Solicitation | 11/30/2026 |
The U.S. Army Corps of Engineers (USACE), Walla Walla District, is seeking information from interested business concerns capable of performing a construction project entitled Mill Creek Section 205 Flood Risk Management Improvements. The work is located in and near the Cities of Walla Walla and College Place, Walla Walla County, Washington. The Mill Creek Flood Control Project begins approximately two miles east of downtown Walla Walla and extends approximately seven miles downstream near College Place at the Gose Street Bridge. One hundred percent performance and payment bonds will be required. In accordance with RFO FAR Clause 52.228-1, a bid guarantee will also be required. The estimated magnitude of construction is between $10,000,000 and $25,000,000. The anticipated North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, with a corresponding small-business size standard of $45,000,000 in average annual receipts. This sources-sought notice is issued for market-research purposes only to identify business concerns with the capability to perform work of this nature, magnitude, and complexity. THIS IS NOT A SOLICITATION FOR BIDS OR PROPOSALS. This notice does not constitute a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse respondents for costs associated with preparation or submission of responses. Responses will be used to assist the Government in determining the appropriate acquisition strategy, including whether a small-business set-aside is appropriate. Interested business concerns should submit the following information: 1. Capability Statement. Provide a statement expressing interest in this requirement and describing the firm's capability to perform work of the anticipated magnitude and complexity. Identify special qualifications, certifications, key personnel, self-performance capabilities, equipment, and any proposed teaming arrangements relevant to the summary scope of work. 2. Relevant Experience. Provide at least three projects completed within the past seven years that are similar in scope, complexity, and magnitude. For each project, provide: -- Project title and location; -- Customer/owner; -- Contract value; -- Period of performance; -- Brief description of the work performed; -- The firm's role, including prime contractor, joint-venture member, or subcontractor; -- Major work self-performed by the firm; and -- Point of contact, including name, title, telephone number, and email address. 3. Bonding Capacity. Provide the firm's single-project bonding capacity and aggregate bonding capacity. 4. Business Size and Socioeconomic Status. Identify the firm's business size under NAICS 237990 and any applicable socioeconomic designations, including small business, Small Disadvantaged Business, 8(a), Historically Underutilized Business Zone (HUBZone) small business, Woman-Owned Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. 5. SAM Registration. Provide the firm's Unique Entity Identifier (UEI) and confirm whether its System for Award Management registration is active. Submit responses by email to: Chandra Crow, Contract Specialist U.S. Army Corps of Engineers, Walla Walla District Email: Chandra.D.Crow@usace.army.mil Responses are due no later than 3:00 p.m. Pacific Time, December 4, 2026. Summary of Scope of Work: The Mill Creek Flood Control Project provides flood-risk management for the City of Walla Walla and adjacent areas in Walla Walla County, Washington. The project includes upstream channel, concrete channel, and downstream channel sections. The anticipated construction work includes flood-risk-management improvements and repairs at multiple locations along and within the upstream and downstream Mill Creek channel sections. Work may include: -- Raising existing levees by up to approximately three feet at five locations; -- Landward enlargement of levees while maintaining 2H:1V side slopes; -- Placement of additional gabion revetment at one location; -- Placement of additional riprap at transition areas, including ramp-to-levee and levee-to-bridge-abutment transitions; -- Construction of new concrete walls and/or raising of existing concrete walls at levee and bridge-transition locations; -- Construction of a concrete access ramp; -- Removal of trees and vegetation along the landside levee toe; -- Removal and in-kind replacement of existing fencing, as necessary to perform the work; -- Removal of a ceiling section in a covered portion of the existing concrete channel; -- Reinforcement of an existing timber-plank-covered support wall within the channel below an existing building; and -- Stabilization of two existing concrete-channel-wall sections using soil anchors and shotcrete facing. Work will occur on Federal and non-Federal/private property. The anticipated project may require work-site access planning, coordination with affected property owners and utilities, traffic control, in-kind replacement of fencing and utilities as required, and work within or adjacent to the active channel. The project is intended to improve Mill Creek system capacity by raising levees in low-assurance areas and to improve system reliability by repairing and reinforcing the concrete channel through downtown Walla Walla. Desired Contractor Capabilities: Interested firms should demonstrate experience with comparable civil-works construction, including: -- Levee raising, embankment construction, earthwork, compaction, and slope construction; -- Cast-in-place concrete work for new walls, wall raises, and access ramps; -- Concrete repair, concrete-channel rehabilitation, and structural concrete demolition; -- Gabion revetment and riprap placement; -- Soil-anchor installation, testing, and shotcrete application; -- In-channel or near-channel construction, including water-control/diversion measures and work-window planning; -- Temporary works, shoring, and protection of existing structures during construction; -- Utility protection, relocation, and restoration; -- Traffic control and maintenance of public, property-owners, and emergency access; -- Concurrent management of multiple construction sites; and -- Planning and providing safe access to constrained work areas through cranes, temporary access systems, or other appropriate means. | 66% | Market Research | 12/07/2026 |
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou located in Harris County, Texas | 61% | Solicitation | 12/01/2026 |
***** Amendment 0001 Issued 11/18/2026 ***** Duluth Vessel Yard Phase III Repairs | 54% | Solicitation | 12/08/2026 |
Additional Details
Solicitation Number
W912DQ19R4024
Archive Date
Mar 16, 2020
Office Address
KANSAS CITY, MO, 64106-2896