GovChime
Notice ID: aee20e87a7cc4bdd9f3f8489a0711485Solicitation

2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri - Phase 1

Archived on November 25, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−05:00
Posted
October 25, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST KANSAS CITY
Place of performance
Saint Louis, MO, 63103
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912DQ21R7003
Notice ID
aee20e87a7cc4bdd9f3f8489a0711485

Description

The U.S. Army Corps of Engineers (USACE) Kansas City District is issuing Phase 1 of a 100% Small Business Set-Aside 2-Phase Design-Build solicitation for a single Firm Fixed-Price, construction contract for Electrical Substation located at Arnold, MO. Key aspects of this project include but are not necessarily limited to repair by replacement of the 12.47KV electrical power to the Arnold site, providing a reliable and sufficient primary distribution feed (Ameren MO) and a government-companion project for primary distribution after the utility providers transformer/substation. This project will include civil design and construction of underground bus duct, foundation and equipment pad and other supporting structures; electrical design and construction to provide and install the primary electrical distribution switchgear and associated protection devices, conduit and wiring, functional testing and commissioning. Existing utility conduit and customer substation will be retired after the new customer substation is constructed. The work is located at the NGA Facility, in Arnold, MO. In Phase one the Government will evaluate the performance capability of offerors in accordance with the criteria described in the solicitation and will down select to a target of 3 and a maximum of 5 most highly qualified contractors to compete in Phase 2. During Phase 2 the down selected contractors will provide a technical solution and a price proposal. The contract will be awarded based upon a Best Value Trade-Off process. The solicitation will include a detailed list of Evaluation Factors and will provide instructions for Proposal Requirements and the Basis for Award. The North American Industry Classification System (NAICS) Code is 236220, (Commercial and Institutional Building Construction). The estimated magnitude of this project is between $5,000,000 - $10,000,000. The estimated performance period for completion of construction is 540 calendar days from Notice to Proceed (NTP). All communications must be made in writing. Prospective Offerors shall submit contracting and technical inquiries and questions concerning the solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet. A Bidder Inquiry Key has been provided in the solicitation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912DQ21R7003
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationApr 15, 2021

    2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri

    Notice 841fdbef93ac416e9c85e8674634295e on SAM.gov

  2. 5×
    SolicitationCurrentMay 12, 2021

    2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri - Phase 1

    Notice aee20e87a7cc4bdd9f3f8489a0711485 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DQ21R7003

Archive Date

Nov 25, 2021

Office Address

KANSAS CITY, MO, 64106-2896