Notice ID: aee20e87a7cc4bdd9f3f8489a0711485Solicitation
2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri - Phase 1
Archived on November 25, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- October 25, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST KANSAS CITY
- Place of performance
- Saint Louis, MO, 63103
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912DQ21R7003
- Notice ID
- aee20e87a7cc4bdd9f3f8489a0711485
Description
The U.S. Army Corps of Engineers (USACE) Kansas City District is issuing Phase 1 of a 100% Small Business Set-Aside 2-Phase Design-Build solicitation for a single Firm Fixed-Price, construction contract for Electrical Substation located at Arnold, MO. Key aspects of this project include but are not necessarily limited to repair by replacement of the 12.47KV electrical power to the Arnold site, providing a reliable and sufficient primary distribution feed (Ameren MO) and a government-companion project for primary distribution after the utility providers transformer/substation. This project will include civil design and construction of underground bus duct, foundation and equipment pad and other supporting structures; electrical design and construction to provide and install the primary electrical distribution switchgear and associated protection devices, conduit and wiring, functional testing and commissioning. Existing utility conduit and customer substation will be retired after the new customer substation is constructed. The work is located at the NGA Facility, in Arnold, MO. In Phase one the Government will evaluate the performance capability of offerors in accordance with the criteria described in the solicitation and will down select to a target of 3 and a maximum of 5 most highly qualified contractors to compete in Phase 2. During Phase 2 the down selected contractors will provide a technical solution and a price proposal. The contract will be awarded based upon a Best Value Trade-Off process. The solicitation will include a detailed list of Evaluation Factors and will provide instructions for Proposal Requirements and the Basis for Award. The North American Industry Classification System (NAICS) Code is 236220, (Commercial and Institutional Building Construction). The estimated magnitude of this project is between $5,000,000 - $10,000,000. The estimated performance period for completion of construction is 540 calendar days from Notice to Proceed (NTP). All communications must be made in writing. Prospective Offerors shall submit contracting and technical inquiries and questions concerning the solicitation via Bidder Inquiry in ProjNet at www.projnet.org/projnet. A Bidder Inquiry Key has been provided in the solicitation.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DQ21R7003- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationApr 15, 2021
2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri
- 5×SolicitationCurrentMay 12, 2021
2-Phase Design-Build Construction Contract for Electrical Substations located at Arnold, Missouri - Phase 1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912DQ21R7003
Archive Date
Nov 25, 2021
Office Address
KANSAS CITY, MO, 64106-2896