Tuttle Creek Project Roof Replacement

Archived on October 3, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
September 4, 2024
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238160: Roofing Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST KANSAS CITY
Place of performance
Manhattan, KS, 66502
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W912DQ24Q1064
Notice ID
6e22b37bb3194a6697adca2ee095035c

Description

Amendment #2 had been attached. The amendment extends the quote submission deadline to 6 September 2024, at 12:00 PM CDT and updates the wage determination. A new Question and Answer has been attached. There is now a Q and A #1, #2, and #3. Amendment #1 has been attached. The amendment adds clarifying text to the scope in sections 1.9.9 - Demolition/Deconstruction Plan and 3.2 - Demolition of Existing Roof. Clarification of issues identified during the site visit:-All vacated equipment (flanges, pipes, etc.) mounted on the roof and/or the parapet walls observed during the site visit will be removed by the government prior to notice to proceed.-Existing utilities and conduits crossing the finished roof shall be supported in accordance with industry standards. The steel propane line crossing the roof may be temporarily removed during the roof replacement process, existing pipe unions are installed in the line to facilitate its temporary removal. Other Clarifications to Tuttle Creek Administration Building Roof Replacement. The US Army Corps of Engineers (USACE), Tuttle Creek Lake Project, has a need for roof replacement construction. The existing roof is a 20 plus year old EPDM roof. The Contractor must perform the removal of the roof system, along with the original chimney. Roof must be replaced with a complete EPDM (ethylene propylene diene terpolymer) sloped roofing system. In addition, new guttering and downspouts will replace the existing. The Contractor shall provide all required equipment, labor, supervision, and material. Project is broken into a Base CLIN and a single Optional CLIN. Optional CLIN may or may not be exercised as part of the Contract. This requirement is 100% Small Business set-aside. In accordance with FAR Part 36.204 the estimated magnitude of this project is between $100,000 and $250,000. The estimated period of performance for completion of the awarded contract is 180 days from the Notice to Proceed (NTP). There will be a site visit planned for this solicitation. The details to attend the site visit will be included in the solicitation. **Offerors will need to bring any of their own PPE/other equipment to the site visit to get onto the roof** If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local APEX Accelerator, formerly known as Procurement Technical Assistance Centers, may be able to help. The APEX Accelerator was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate an APEX Accelerator near you, go to http://www.aptac-us.org. This is a free service by a nonprofit paid for by the U.S. Government. Interested contractors must have an active registration in the System for Award Management (SAM) database prior to submitting quotes. To view or download the solicitation and all other associated documents also requires an active registration at SAM.gov. Firms can register through the https://www.sam.gov/SAM/ website to create or update their SAM.gov accounts. Quotes from contractors without an active SAM registration will NOT be considered for award. If the quoter is a Joint Venture (JV), the JV entity must have a valid SAM registration in the SAM database representing the JV as one business/firm/entity. SAM.gov registration is free of charge. Utilizing SAM.gov and Procurement Integrated Enterprise Environment (PIEE) System Solicitation Portal will normally be the only methods of distributing amendments, updates, and questions and answers prior to closing; therefore, it is the quoter?s responsibility to check the website (SAM or PIEE) periodically for any amendments to the solicitation. These websites are occasionally inaccessible due to maintenance. The Government is not responsible for any loss of internet connectivity or for a quoter?s inability to access the document at the reference website. This requirement will be synopsized and solicited, and quotes will be received, through the Procurement Integrated Enterprise Environment (PIEE) System Solicitation Portal. To submit a quote for this requirement through the PIEE Solicitation Portal, Contractors will first need to register for the PIEE ?Proposal Manager? role. How to Register:1. Navigate to https://wawf.eb.mil/2. Select Register [top right]3. Select Vendor4. Create a User ID and Password and follow the prompts [next]5. Create Security Questions [next]6. Complete your User Profile Information [next]7. Complete your Supervisor or Approving Official Information [next]8. Complete Roles - Step 1. Select SOL-Solicitation, Step 2. Select Proposal Manager, Step2. Click Add Roles, Step 4. Fill in your Location Code (CAGE Code) [next] ensures9. Provide a justification for your registration [next]10. Follow the remaining prompts to submit your registration. To learn more about the PIEE Solicitation Portal and for training/instructions on submitting your bid, please visit the Web Base Training Page below: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912DQ24Q1064
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMay 21, 2024

    Synopsis: Tuttle Creek Project Roof Replacement

    Notice 2001ce9d34f743e5ad598191ff403125 on SAM.gov

  2. 11×
    SolicitationCurrentAug 15, 2024

    Tuttle Creek Project Roof Replacement

    Notice 6e22b37bb3194a6697adca2ee095035c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Princeton Plasmas Physics Laboratory is seeking a qualified contractor to replace roofing on two existing roofs. The (C40 RF Building & C41 CS Building) which are past their useful life requiring costly maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures, and flashing. Portions of existing metal coping have pulled away during storm events causing large sections of membrane to separate from the substrate. A catastrophic failure to one of these roofs would negatively impact the ability to conduct the top priority experimental operations in the Laboratory. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise required to replace the noted roofs and specified components per the associated contractdesign documents. Construction scope includes the following: Remove and replace existing built-up roofs at PPPL. Buildings include: a. C40 – RF Building b. C41 – CS Building All work shall be perfomed IAW SOW titled: C40 & C41 RF ROOF REPLACEMENT CONSTRUCTION dated 28 Aug 2026 The project drawing have not been posted. The drawings will be released to offerors (on an as requested basis) when we receive the following information and documents (1) An e-mail confirmation of your intent to participate in the site visit/pre-bid meeting scheduled for 11/17/26 (2) A signed solicitation acknowledgement form (3) Identification of your lead proposal manager for this solictation via e-mail (4) A written request for project drawings (see attached form) The link to complete your Princeton supplier registration is referenced below:: https://finance.princeton.edu/buying-paying/suppliers/becoming-princeton-supplier **To be eligible to participate in this solicitation your firm must submit the acknowlegment form to us NLT 4:00 PM on 9 Nov 2026
67%
Combined Synopsis12/10/2026
This contract is for the removal of the existing Duro-Last roofing system. The Contractor shall supply and install a new, complete membrane roofing system, providing all necessary components and materials to ensure a watertight, warranted system. The new roofing system to be warranted (20-year minimum), installed with quality craftsmanship, and free of leaks at the time of acceptance by the Government.
67%
Solicitation08/03/2026
66%
AwardedOpen
Please see solicitation document W911WN26QA068 and all relate attachments. There will be no formal site visit. If you have any questions, please email the Contract Specialist, Isaiah Johnson, isaiah.m.johnson@usace.army.mil.Please see the titled document Attachment 4 - Questions and Answers Document to see answers to questions from vendors. UPDATE 2 - Please see the two attached Questions and Answers documents to see questions asked by the vendors.
66%
Solicitation10/02/2026
Berlin Lake is looking for a contractor to repair two (2) roofs. This project is being solicited as 100% Small Business Set-Aside. Basis of Award is to the lowest quoter who is found responsible. Quotes received by email will not be considered. All responses to this announcement shall be submitted electronically via Procurement Integrated Enterprise Environment (PIEE). All quotes must include contractor signatures on page two (2) of document W911WN26QA042, as well as the contractors quoted pricing on page five (5). For in-depth instructions on roof replacements, please see Attachment 1 - Specifications Roof Replacement.Update 1: Please see Question and Answers sheet uploaded for more info. UPDATE 2: Please see Questions and Answers sheets 2 and 3 for new information.
66%
Solicitation04/24/2026

Additional Details

Solicitation Number

W912DQ24Q1064

Archive Date

Oct 3, 2024

Office Address