Construct Flightline Fueling Facility

Archived on October 28, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−06:00
Posted
October 28, 2024
Notice type
Presolicitation
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of War

Notice details

Last updated
Nov 13, 2025

Identifiers

Solicitation number
W912DQ25R4000
Notice ID
ae790b14d4b4467fbf817fbaaaca9365

Description

The RFP for this requirement has been delayed but will still be advertised. If you are interested in this project, please submit your contact information to the POCs below so that we can keep you informed about the project and its status. The point-of-contact for contractual questions is Jeri L. Halterman, at phone: (816) 389-2198, or email: jeri.l.halterman@usace.army.mil or Michael G. France at phone (816) 389-3320 or email michael.g.france@usace.army.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DQ25R4000
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 2×
    Pre-SolicitationCurrentOct 4, 2024

    Construct Flightline Fueling Facility

    Notice ae790b14d4b4467fbf817fbaaaca9365 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area.
69%
Solicitation12/04/2026
This project involves modifying a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside.
69%
Pre-Solicitation10/14/2026
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
68%
Solicitation01/25/2027
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection.
68%
Solicitation10/20/2026
*24 September 2026: This amendment publishes a change in the Scope of Work and updated CLIN Schedule due to funding. Updated proposals are due on 30 September 2026, no later than 02:00 PM CDT._______________________*...... *8 September 2026: This amendment publishes a change in the Scope of Work, provides an additional drawing for the temporary tanks, and extends the due date for the proposal to 22 September 2026. ______________________*.....*21 August 2026: This amendment is to extend the due date for the proposal to 4 September 2026 and post the sign in sheet for the Site Visit._________________* This project includes performing repairs and maintenance to one vertical aboveground storage tank at Los Alamitos AFB, in California. The contractor shall phase their work to minimize disruption to existing fuels operations. The repairs and maintenance items shall be performed to comply with API 653 and all applicable design criteria and standards.
68%
Solicitation09/30/2026

Additional Details

Solicitation Number

W912DQ25R4000

Archive Date

Oct 28, 2025