Emergency Buy: Type 1 River Rock, Missouri River Mile 52.8, Kansas City District USACE
Archived on April 25, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 AM CDT
- Posted
- April 8, 2026
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 212319: Other Crushed and Broken Stone Mining and Quarrying
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST KANSAS CITY.W071 ENDIST KANSAS CITY
- Place of performance
- Washington, Missouri, 63090
- PSC
- 5610: MINERAL CONSTRUCTION MATERIALS, BULK
- Last updated
- Nov 1, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912DQ26QA053
- Notice ID
- 941f898a153a4e788da0314a2ccc054c
Description
Please See Attached for Solicitation Details
Amendment updates SOW to clarify Missouri River river mile 52.8.
Q&A:
Q1. Is a gradation test required prior to shipping material?
A1. No
Q2. No geological requirements are associated with the stone, what are the requirements in order to be considered durable stone. For instance, freeze thaw requirements, specific gravity?
A2. Bulk specific gravity saturated surface-dry basis, method ASTM C 127 - not less than 2.40. Soundness in freezing and thawing method for ledge stone, Method CRD-C 144-92 loss at 20 cycles - not more than 25 percent for at least 50 percent of the face height to be quarried.
Q3. Please specify what are acceptable methods for loading material on the Government Owned barges. Will the government provide a ramp barge so trucks can dump directly onto the barge, does the contractor need to transload with a material handler or equivalent.
A3. A government furnished loading dock will be available for loading. The trucks or loading equipment will enter on to the dock barge and dump the rock onto the material barges. If the vendor does not already have an established and suitable loading facility on the Missouri River then they will need to provide the land. The location of the land must allow for the necessary draft, room for ingress and egress of tow boats and material barges, and bank height suitable to lower the loading ramp onto.
Q4. Does contractor supplying material need to have a CQM credentialed staff submitted for this project.
A4. No
Q5. Is the contractor responsible for identifying the load out near 52.8? If so, what is the acceptable range for being considered nearest?
A5. If the vendor does not already have an established and suitable loading facility on the Missouri River then they will need to provide the land. The location of the land must allow for the necessary draft, room for ingress and egress of tow boats and material barges, and bank height suitable to lower the loading ramp onto. The range is determined by the loading facility's location which is determined by the vendor.
Q6. Is this a 100% Total Small Business Set-Aside under NAICS 212319?
A6. Yes.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
Lifecycle
- 1Version 1SolicitationArchived
Emergency Buy: Type 1 River Rock, River Mile 52.8, Kansas City District USACE
- 2Version 2SolicitationArchived
Emergency Buy: Type 1 River Rock, Missouri River Mile 52.8, Kansas City District USACE
- 5Version 5SolicitationArchivedCurrent
Emergency Buy: Type 1 River Rock, Missouri River Mile 52.8, Kansas City District USACE
- 7Version 7Award NoticeArchived
Type changed from Solicitation to Award Notice
Emergency Buy: Type 1 River Rock, Missouri River Mile 52.8, Kansas City District USACE
Similar Opportunities
Additional Details
Solicitation Number
W912DQ26QA053
Archive Date
Apr 25, 2026
Office Address
KANSAS CITY, MO, 64106-2896