GovChime
Notice ID: 60be703b836842b0b1d8a23775b2ac8bSolicitation

W912DR20B0020 Dalecarlia Clearwells Maintenance

Archived on November 7, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:30 AM UTC−04:00
Posted
October 23, 2020
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST BALTIMORE
Place of performance
Washington, DC, 20016
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912DR20B0020
Notice ID
60be703b836842b0b1d8a23775b2ac8b

Description

The Washington Aqueduct provides potable water to approximately one million people in the District of Columbia and Northern Virginia. As part of the water treatment and supply system, the Washington Aqueduct maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTPs). At the Dalecarlia WTP, two Clearwells are used for final chemical treatment, disinfection, and storage of water before it is pumped to the distribution system. The 15 million gallon (MG) Clearwell is approximately 25 feet deep. It was constructed in the 1920s and rehabilitated in 2000. The 30 MG Clearwell was constructed in the 1950s and rehabilitated in the 2000s; its approximate depth ranges between 20’ and 50’. Both Clearwells are covered by about 2’ feet of soil and topped with grass cover. The project consists of implementing upgrades and improvements to these Clearwells and their connecting conduits to include: upgrades to their drain lines to eliminate potential cross connections, rehabilitation and replacement of large sluice gates, installation of new flow meters and induction mixers, improvements to the Clearwell overflow structure, chemical analyzer drain pipe re-routing and soil drainage improvements Both Clearwells are critical in maintaining adequate supply and quantity of water, so outage periods are restricted. The timing of outages must be coordinated with lower seasonal demands and sequenced so that only one Clearwell is out of service at a time. Finally, mold remediation and HVAC upgrades will be required in a building adjacent to the 15 MG Clearwell.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DR20B0020
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Market ResearchJun 30, 2020

    Tred Avon River Oyster Bar Creation

    Notice fcbd00a7d79d4c298a4e8c3b0582b2a9 on SAM.gov

  2. Pre-SolicitationJul 9, 2020

    Tred Avon River Oyster Bar Creation

    Notice c497e2f26273428697be77f693715251 on SAM.gov

  3. 6×
    SolicitationCurrentSep 23, 2020

    W912DR20B0020 Dalecarlia Clearwells Maintenance

    Notice 60be703b836842b0b1d8a23775b2ac8b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DR20B0020

Archive Date

Nov 7, 2020

Office Address

BALTIMORE, MD, 21201-2526