Notice ID: 60be703b836842b0b1d8a23775b2ac8bSolicitation
W912DR20B0020 Dalecarlia Clearwells Maintenance
Archived on November 7, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:30 AM UTC−04:00
- Posted
- October 23, 2020
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST BALTIMORE
- Place of performance
- Washington, DC, 20016
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912DR20B0020
- Notice ID
- 60be703b836842b0b1d8a23775b2ac8b
Description
The Washington Aqueduct provides potable water to approximately one million people in the District of Columbia and Northern Virginia. As part of the water treatment and supply system, the Washington Aqueduct maintains and operates the Dalecarlia and McMillan Water Treatment Plants (WTPs). At the Dalecarlia WTP, two Clearwells are used for final chemical treatment, disinfection, and storage of water before it is pumped to the distribution system. The 15 million gallon (MG) Clearwell is approximately 25 feet deep. It was constructed in the 1920s and rehabilitated in 2000. The 30 MG Clearwell was constructed in the 1950s and rehabilitated in the 2000s; its approximate depth ranges between 20’ and 50’. Both Clearwells are covered by about 2’ feet of soil and topped with grass cover. The project consists of implementing upgrades and improvements to these Clearwells and their connecting conduits to include: upgrades to their drain lines to eliminate potential cross connections, rehabilitation and replacement of large sluice gates, installation of new flow meters and induction mixers, improvements to the Clearwell overflow structure, chemical analyzer drain pipe re-routing and soil drainage improvements Both Clearwells are critical in maintaining adequate supply and quantity of water, so outage periods are restricted. The timing of outages must be coordinated with lower seasonal demands and sequenced so that only one Clearwell is out of service at a time. Finally, mold remediation and HVAC upgrades will be required in a building adjacent to the 15 MG Clearwell.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912DR20B0020- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Market ResearchJun 30, 2020
Tred Avon River Oyster Bar Creation
- Pre-SolicitationJul 9, 2020
Tred Avon River Oyster Bar Creation
- 6×SolicitationCurrentSep 23, 2020
W912DR20B0020 Dalecarlia Clearwells Maintenance
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912DR20B0020
Archive Date
Nov 7, 2020
Office Address
BALTIMORE, MD, 21201-2526