Notice ID: c89b058b75d44ec4b9d0059946c040faSpecial Notice
Mid Chesapeake Bay Ecosystem Restoration Barren Island Phase 2 Abstract of Bids
Archived on July 12, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM UTC−04:00
- Posted
- June 27, 2024
- Notice type
- Special Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST BALTIMORE
- Place of performance
- Fishing Creek, MD, 21634
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912DR24B0002
- Notice ID
- c89b058b75d44ec4b9d0059946c040fa
Description
Please see attached abstract of bids for the Mid Chesapeake Bay Ecosystem Phase 2 project solicitation W912DR24B0002.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DR24B0002- Pre-Solicitation
- Solicitation
- Pre-SolicitationApr 10, 2024
Mid Chesapeake Bay Island Ecosystem Restoration Phase 2 Stone Structures and Features
- 7×SolicitationMay 3, 2024
Mid Chesapeake Bay Ecosystem Restoration Barren Island Restoration Phase 2
- Special NoticeCurrentJun 27, 2024
Mid Chesapeake Bay Ecosystem Restoration Barren Island Phase 2 Abstract of Bids
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations. | - | Pre-Solicitation | 10/21/2026 |
*****Solicitation Notice Update to Post the Bid Abstract on 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | - | Awarded | Open |
*****Solicitation Notice Update to Post the Bid Abstract dated 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | - | Special Notice | Open |
*****Solicitation Notice Update to Post the Bid Abstract on 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | - | Solicitation | 08/28/2026 |
The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. | - | Pre-Solicitation | 06/30/2026 |
Additional Details
Solicitation Number
W912DR24B0002
Archive Date
Jul 12, 2024
Office Address
BALTIMORE, MD, 21201-2526