GovChime
Notice ID: b434b79cd95745ff94c55ffb3b7b0b0fSolicitation

Poplar Island Cell 6 and Cell 11 Dike Raisings

Archived on September 27, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
July 16, 2024
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST BALTIMORE
Place of performance
Wittman, MD, 21676
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W912DR24B0006
Notice ID
b434b79cd95745ff94c55ffb3b7b0b0f

Description

FY24 Poplar Island Cell 6 and Cell 11 Dike Raisings. The USACE Baltimore District has been tasked to solicit for and award a construction contract for the Poplar Island Cell 6 and Cell 11 Dike Raisings project. The proposed project will be a competitive, firm-fixed-price contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). Poplar Island is an ecosystem restoration project located in the upper-middle Chesapeake Bay in Talbot County, Maryland, approximately 39 miles south-southeast of the Port of Baltimore and two miles northwest of Tilghman Island. The overall scope of this project is to use approximately 300,000 cubic yards of stockpiled sand to raise two existing containment cell dikes on the island. The primary purpose of this contract is to raise the entire Cell 6 sand dike (approximately 14,000 linear feet) from an elevation of +25 feet to +30 feet. The work will be completed by manually hauling sand from an on-site sand stockpile located in an adjacent Cell 4. The secondary purpose of this contract is to use remaining sand in the Cell 4 stockpile to raise a portion of the Cell 11 sand bench (approximately 15,000 linear feet) by approximately three to five feet. All newly placed sand dike and bench sections will be shaped, compacted, and seeded with native grasses. Any remaining sand from the Cell 4 stockpile that is not used in the raisings will be hauled to another stockpile on the island, located approximately 1.8 miles north in Cell 1D. All work will be performed within Cells 4, 6, 1D, and 11 of Poplar Island, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The anticipated period of performance is approximately 430 calendar days.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912DR24B0006
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMay 7, 2024

    POPLAR ISLAND CELL 6 AND CELL 11 DIKE RAISINGS, TALBOT COUNTY, MD

    Notice 82db26eee8984fc88eaeeb5f56c8e9dc on SAM.gov

  2. SolicitationJun 14, 2024

    Poplar Island Cell 6 and Cell 11 Dike Raisings

    Notice a135612f685e4540bf592da608f5e277 on SAM.gov

  3. Pre-SolicitationJun 14, 2024

    POPLAR ISLAND CELL 6 AND CELL 11 DIKE RAISINGS, TALBOT COUNTY, MD

    Notice 90ee42b232b349b49cde4002409dbc84 on SAM.gov

  4. 2×
    SolicitationCurrentJul 3, 2024

    Poplar Island Cell 6 and Cell 11 Dike Raisings

    Notice b434b79cd95745ff94c55ffb3b7b0b0f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DR24B0006

Archive Date

Sep 27, 2024

Office Address