GovChime
Notice ID: d3cd0e108b2a4789bee667cb463cac19Solicitation

FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Archived on December 31, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
October 21, 2025
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.W2SD ENDIST BALTIMORE
Place of performance
Baltimore MD, 21201
PSC
Z1KF: MAINTENANCE OF DREDGING FACILITIES
Last updated
Aug 21, 2026

Identifiers

Solicitation number
W912DR25BA006
Notice ID
d3cd0e108b2a4789bee667cb463cac19

Description

********************

ABSTRACT OF BIDS

********************

The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The dredging depth for all channels is between 35 and 50 feet mean lower low water (MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 950,000 cy will be dredged from the Maryland approach channels (Brewerton Eastern Extension and Craighill Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 550,000 cy will be dredged from Baltimore Harbor Channels (Brewerton and Seagirt West Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of one to two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationDEPT OF THE ARMYOct 21, 2025197.86 KB

Lifecycle

Solicitation:W912DR25BA006
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentSep 19, 2025

    FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

    Notice d3cd0e108b2a4789bee667cb463cac19 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912DR25BA006

Archive Date

Dec 31, 2025

Office Address

BALTIMORE, MD, 21201-2526