GovChime
Notice ID: 3b6ac1724a4d4537ae548b73741c2fadSolicitation

Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY

Archived on August 4, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
July 16, 2020
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW YORK
Place of performance
West Point, NY, 10996
Last updated
Apr 29, 2026

Identifiers

Solicitation number
W912DS19R0019
Notice ID
3b6ac1724a4d4537ae548b73741c2fad

Description

The U.S. Army Corps of Engineers, New York District intends to award a firm fixed-price construction contract through the Request For Proposal (RFP) process for the following scope of work: The existing facilities at West Point for engineering students no longer meet the needs of the competitive world class program. Built over 50 years ago, the current accommodations are outdated, compartmentalized and inefficient due to the limitations of fitting in necessary programs into existing spaces. The United States Army Garrison (USAG) at West Point (WP), New York, has proposed the development of a modern computer and engineering sciences academic building on the campus of the United States Military Academy (USMA) at West Point. The new academic building, known as the Cyber Engineering and Academic Center (CEAC) fulfills the need for a state-of-the-art collaborative science and engineering learning space enabling USMA Cadets to experiment and develop new and emerging technologies that will enable the United States Military to remain at the technological forefront of new battlefields, both physical and digital. This facility will attract and train future generations of engineering officers for the United States Military. There are three (3) academic engineering departments which CEAC is programmed for. These departments are: Civil and Mechanical Engineering (CME), Electrical Engineering and Computer Science (EECS), and Systems Engineering (SE). At four floors and a total of 136,000 SF, the CEAC facility will provide innovative spaces for the noted academic departments. Drone flyover and rendering of the future site: https://vimeo.com/365384524/44629928e6 The building will be located west of Mahan Hall and south of Building 606 along Thayer Walk, the main pedestrian access way of the Central Area. It is an ideal location on campus, adjacent to other cadet facilities, such as academic buildings and barracks. This project also includes a Parking Structure for a maximum of 450 parking stalls as identified on the DD1391. The Parking Structure is an underground facility, beneath CEAC, and will be restricted to authorized personnel only. New hardscape and landscaping is proposed to integrate CEAC with the existing academic buildings and barracks located within the Central Zone at USMA. The project also includes a pedestrian bridge connecting CEAC to Mahan and will span over Thayer Road/Walk. The primary purpose is to facilitate flow of cadets, faculty, staff and equipment and encourage collaboration and sharing between these buildings. It will be a fully enclosed bridge with an exterior rooftop walkway to allow for the connection on multiple levels. The bridge is in a location of exceptional visual impact on the Central Post Area of the historic campus and will significantly emphasize the gateway to Central Area. This project also includes a Signature Meeting Space and Colloquium / Collaboration Space to be located on the fourth level of CEAC and will include high tech audio/visual capabilities. The spaces are intended to allow for a multitude of functions including: presentations, meetings with dignitaries, colloquia and conferences, group capstone integration meetings, in-briefs and out-briefs with external organizations, and Cadet project presentations. These spaces will also improve recruiting of prospective Cadets and will highlight West Points position as a first-tier academic and leader development institution. The project include a substantial amount of rock removal (300,000 Cubic Yards of Granite) to level the site. The rock removal is considered a significant aspect of the project requiring careful blasting and vibration limitations on neighboring structures. The period of performance for this project is approximately 1461 calendar days from the Notice to Proceed date. The applicable North American Industry Classification System (NAICS) code is 236220 for Commercial & Institutional Facilities. In accordance with DFARS 236.204, the estimated magnitude of construction is between $100,000,000 and $250,000,000. Any and all amendments shall be posted on beta.SAM.gov. Hard copies will not be available. It is the contractor's responsibility to monitor the beta.SAM.gov web-site for any amendments. Offerors are required to be registered with System for Award Management (SAM), located at https://www.sam.gov/portal/public/SAM/. The procurement method for this solicitation will be a RFP, Best Value Trade-Off (BVTO). Proposal are due electronically, please refer to the solicitation for complete instructions. The media selected for issuance of Synopsis/Solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project shall be the internet. Paper copies of this solicitation and amendments, if any, will not be available or issued. In accordance with DFARS 252.204-7007, all vendors who want access to the solicitation must be registered with System for Award Management (SAM), located at https://www.sam.gov/portal/public/SAM/ and beta.SAM.gov, in order to safeguard acquisition-related information for all Federal Agencies. Interested parties may download and print the solicitation at no charge from the beta.SAM.gov. Check beta.SAM.gov frequently for information and updates. Project specification files and drawings are portable document files (PDF). The Office of the Under Secretary of Defense (Acquisition Technology & Logistics (OUSD{AT&L}) A Guide to Collection & Use of Past Performance Information dated 2003 and FAR Part 36 requires the collection and use of past performance information (PPI) in acquiring best-value goods and services. FAR Subpart 36.3 and DFARS Subpart 236.2 mandate the use of Contract Performance Assessment Reporting System (CPARS) by all DoD agencies for construction contracts greater than or equal to $650,000 or more than $10,000 if the contract was terminated for default. CPARS is located at: https://www.cpars.csd.disa.mil. More definitive guidance and instructions will be incorporated in the solicitation and resultant contract. For further information, contact the POC for this project: Monica Chahary, Contract Specialist, New York District, 26 Federal Plaza, Room 16-300, New York, NY 10278-0090. Telephone: (917) 790-8182. E-mail: monica.c.chahary@usace.army.mil. Secondary POC, Francis Cashman, Contracting Officer, E-mail: francis.cashman@usace.army.mil. NOTE: Site Visit is scheduled for 18 June 2020, please refer to Amendment 0001 & 0003 for details.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912DS19R0019
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMay 7, 2020

    Cyber and Engineering Academic Center, United States Military Academy, West Point, NY

    Notice 0ede7492943b4bf994916c78c3ea46a5 on SAM.gov

  2. SolicitationJun 3, 2020

    Cyber Engineering and Academic Center, United States Military Academy, West Point, NY

    Notice 73612fa030934441bcc03653da4cd762 on SAM.gov

  3. 2×
    Pre-SolicitationJun 4, 2020

    Cyber and Engineering Academic Center, United States Military Academy, West Point, NY

    Notice e245aa35bedb40218e9c6b0b9f61a7ac on SAM.gov

  4. 2×
    SolicitationJun 5, 2020

    Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY

    Notice 736137938dd3435cad0ffae3b3f7c9ec on SAM.gov

  5. Pre-SolicitationJun 11, 2020

    Cyber Engineering and Academic Center, United States Military Academy, West Point, NY

    Notice 070033093c9846f69fb7e84b6f7969b5 on SAM.gov

  6. 7×
    SolicitationCurrentJun 16, 2020

    Cyber Engineering and Academic Center (CEAC), United States Military Academy, West Point, NY

    Notice 3b6ac1724a4d4537ae548b73741c2fad on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS IS A PROJECT LABOR AGREEMENT (PLA) NOTICE TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW UP INFORMATION REQUESTS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME; HOWEVER RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. NO RESPONSES TO THIS PLA NOTICE WILL BE POSTED TO SAM.GOV. The purpose of this announcement is to gain knowledge of the use and benefits of Project Labor Agreements (PLAs) for the Construction Services of Crowninshield/Cressy Pier and Waterfront Building at Kings Point, NY.. The NAICS Code is 236220 (Commercial and Institutional Building Construction) and 237990 (Other Heavy and Civil Engineering Construction. Any potential competitive solicitation(s) that may proceed from this notice will be posted to SAM.gov. All interested offerors will have the opportunity to respond to a solicitation announcement at a later time if and when a solicitation is issued. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing to issue a solicitation for the Construction Services of Crowninshield/Cressy Pier and Waterfront Building at Kings Point, NY. The NAICS codes for this procurement are 236220 and 237990. The project is planned to be solicited in the Fall of 2027 with construction to begin early in 2028. The estimated magnitude of construction cost is between $100,000,000 and $120,000,00.00. The project will be constructed within the access-controlled installation of the United States Merchant Marine Academy, Kings Point, NY. The building will be new construction in the Waterfront Section of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below: 1. Project Purpose and Program Context USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Crowninshield/Cressy Pier will serve as the premier facility showcasing the Academy as the Nation’s top Maritime training institution. ________________________________________ 2. Existing Conditions and Demolition Scope The existing site has the remains of the previous Cressy Pier which consisted of a stone jetty, timber pier and timber framed building. The Hague Basin was recently dredged in 2026 to between 15’-17’ deep. There are floating wave attenuators currently installed to attempt to provide some level of protection to the basin, the removal of which will be required prior to the construction of the new pier and building. ________________________________________ 3. Reconstruction Scope and Facility Capabilities This project will create a new pier in the footprint of the former Cressy Pier to protect the basin, reduce seawall degradation and provide academic space to the Academy. The building must be constructed to support the department’s operational requirements. This includes restoring lost dock space and ensuring existing docks can support daily operations and visiting vessels. Infrastructure improvements must also account for large-scale events, such as Fleet Week and alumni gatherings, which demand expanded facilities and robust support systems. The addition of fire training classes, a Safety of Life at Sea (SOLAS) Lab, and a seamen ship facility are also needed to ensure comprehensive training capabilities. Additionally, it will enable USMMA to launch and recover lifeboats. The new pier will also offer midshipmen new recreational opportunities, such as sailing, paddleboarding, and kayaking. ________________________________________ 4. Design Standards and Performance Requirements The facility will be fully designed for accessibility and usability by individuals with disabilities. All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC). ________________________________________ 5. Acquisition Strategy and Contracting Approach The acquisition approach incorporates early contractor involvement utilizing the federal government’s Integrated Design and Construction (IDaC) framework to support design completion and ensure constructability. The solicitation will be issued at approximately 15% design. The anticipated Magnitude of Construction is between $100 million and $120 million. Duration of construction will be approximately 730 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in February 2028. DEFINITIONS A Project Labor Agreement (PLA) is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). A large-scale construction project means a Federal construction project within the United States for which the total estimated cost of the construction contract to the Federal Government is $35 million or more. Revolutionary FAR Overhaul (RFO) SUBPART 22.502-1 – POLICY Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project agencies must require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.502(d) applies. An agency may require the use of a project labor agreement on projects where the total cost to the Federal Government is less than that for a large-scale construction project, if appropriate. (1) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will— (i) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (ii) Be consistent with law. (2) Agencies may consider the following factors in deciding whether the use of a project labor agreement is appropriate for a construction project where the total cost to the Federal Government is less than that for a large-scale construction project: (i) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. (ii) There is a shortage of skilled labor in the region in which the construction project will be sited. (iii) Completion of the project will require an extended period of time. (iv) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. (v) A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs. (vi) Any other factors that the agency decides are appropriate. PLA COMMENT SOLICITATION In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: Have comparable projects been undertaken by Federal, State, municipal, or private entities in the geographic area of this project? Do you have knowledge that a PLA has been used in the local area on similar projects? If so, please provide supporting documentation? For each project, please indicate if a PLA was used, if available, the initial and final cost, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? Are there concerns by prime contractors on the availability of skilled construction labor? Are there large-scale construction projects in the area (over $35M, within 50 miles of Kings Point, New York) which could impact availability of skilled labor for this project? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Are existing apprentice programs providing sufficient numbers of skilled workers for future requirements? If so, please elaborate and provide supporting documentation where possible. Are you aware of time sensitive issues/scheduling requirements that would impact the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. Is the proposed schedule/completion time one which would benefit from a PLA – if so, how? Will a PLA impact the completion time? How would a PLA benefit a project which contains a unique and compelling mission-critical schedule? Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in federal procurement. Are there any other economies or efficiencies derived by the Federal Government, if using a PLA? Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. Are there any concerns regarding labor-management stability related to this project? Will the use of a PLA produce labor-management stability on this project? Have labor disputes or other labor issues contributed to project delays in the local area? Are you aware of examples of labor- management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve? What market share does union labor in construction trades have in the geographic area? Which existing Collective Bargaining Agreements will expire during construction of this project? Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? What are the estimated relative cost impacts, if any, to a proposal if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact. Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals? Should a PLA be executed on the above referenced project? What benefits do you believe a PLA could achieve? What other factors should the Corps consider before deciding to include PLA provisions for the Crowninshield/Cressy Pier and Waterfront Building USMMA, NY project? Please identify any additional information you believe should be considered on the use of a PLA on the referenced project. Please identify any additional information you believe should be considered on the non-use of a PLA on the referenced project Does your company intend to bid/propose on this project if a PLA requirement is included in the solicitation? Does your company intend to bid/propose on this project if a PLA requirement is not included in the solicitation? Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. The Government should not construe this PLA Notice as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Information gathered from this research will be used to determine whether a waiver is warranted. Please submit written comments by email to: Mohenda Surage and Richard Gussenhoven Email: mohenda.r.surage@usace.army.mil and Richard.Gussenhoven@usace.army.mil Survey Questionnaires will not be accepted after 4:00 pm on the response date shown in the advertisement on SAM.gov. If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will moved to the next business day.
-Market Research11/11/2026
The U.S. Army Corps of Engineers, New York District is issuing an invitation for bid to award a Firm Fixed Price construction contract for the demolition of existing building, site Improvements and provide a turnkey modular office facility. The scope includes the demolition of an existing 10,000 SF building (with basement, in-ground pool, and pool shed), Hazardous Materials Abatement and Disposal, Site Improvements (SWPPP Controls, Sidewalks, Parking, Landscaping, Temp Fencing, Utilities Infrastructure including Water, Sewer, Electrical, Telecom tie-ins), and construction of a new office space of approximately 5,700 square feet, composed of custom modular units. The facility will be a single-story complex with a u-shaped space opening onto a small deck. It will house open offices with cubicles, six private offices, two conference rooms, four single-user bathrooms, a kitchenette/pantry room, lactation room, storage closets, and a mechanical room. The project scope encompasses incidental demolition, site prep work, foundations, underground utility hook ups, and site lighting. The contractor will also be responsible for providing furniture, fixtures, and equipment based upon the drawings and specifications. The building and site infrastructure are required to have a minimum life expectancy of 10 to 15 years. The contract duration will be 136 calendar days for the entire project with phasing work involved. NAICS: 236220 Size standard: $45 million. Project magnitude is between $1,000,000 - $5,000,000.
-Solicitation12/07/2026
This contract shall be an indefinite delivery, indefinite quantity (ID/IQ) contract encompassing a wide variety of individual construction and repair task and trades. Such work is to include but not limited to carpentry, road repair, roofing, excavation, interior and exterior electrical, heating, ventilating and air conditioning (HVAC), plumbing, sheet metal work, painting, demolition, concrete masonry, welding, emergency repairs, water lines and gas line construction and repair. The Contractors work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide all repair or construction and related services as specified. The Contractor shall perform the work in strict accordance with the contract and all applicable federal, state and local laws, regulations, codes, directives, and Installation policies. The Contracting Officer has classified this requirement as Commercial and Institutional Building Construction, North American Industry Classification System (NAICS) code 236220. The small business size standard is $45.0 million. The magnitude of this requirement is estimated to be $225,000,000 (five year ordering period).In accordance with FAR Part 36.211 Distribution of Advance Notices and Solicitations, contractors are required to submit requests for equitable adjustment as a result of change orders to the issuing Contracting Officer. Contractors are required to acknowledge the change order within 30 days and are to submit their request for adjustment which includes all supporting documents as soon as possible, but not later than the required completion date of the contract. Place of Contract Performance: Fort Drum, New York 1360218. Set-aside Status: This acquisition is a 100% competitive 8(a) set-aside, pursuant to the requirements of FAR section 19.805, Competitive 8(a).
-AwardedOpen
This contract shall be an indefinite delivery, indefinite quantity (ID/IQ) contract encompassing a wide variety of individual construction and repair task and trades. Such work is to include but not limited to carpentry, road repair, roofing, excavation, interior and exterior electrical, heating, ventilating and air conditioning (HVAC), plumbing, sheet metal work, painting, demolition, concrete masonry, welding, emergency repairs, water lines and gas line construction and repair. The Contractors work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide all repair or construction and related services as specified. The Contractor shall perform the work in strict accordance with the contract and all applicable federal, state and local laws, regulations, codes, directives, and Installation policies. The Contracting Officer has classified this requirement as Commercial and Institutional Building Construction, North American Industry Classification System (NAICS) code 236220. The small business size standard is $45.0 million. The magnitude of this requirement is estimated to be $225,000,000 (five year ordering period).In accordance with FAR Part 36.211 Distribution of Advance Notices and Solicitations, contractors are required to submit requests for equitable adjustment as a result of change orders to the issuing Contracting Officer. Contractors are required to acknowledge the change order within 30 days and are to submit their request for adjustment which includes all supporting documents as soon as possible, but not later than the required completion date of the contract. Place of Contract Performance: Fort Drum, New York 1360218. Set-aside Status: This acquisition is a 100% competitive 8(a) set-aside, pursuant to the requirements of FAR section 19.805, Competitive 8(a).
-AwardedOpen
This contract shall be an indefinite delivery, indefinite quantity (ID/IQ) contract encompassing a wide variety of individual construction and repair task and trades. Such work is to include but not limited to carpentry, road repair, roofing, excavation, interior and exterior electrical, heating, ventilating and air conditioning (HVAC), plumbing, sheet metal work, painting, demolition, concrete masonry, welding, emergency repairs, water lines and gas line construction and repair. The Contractors work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide all repair or construction and related services as specified. The Contractor shall perform the work in strict accordance with the contract and all applicable federal, state and local laws, regulations, codes, directives, and Installation policies. The Contracting Officer has classified this requirement as Commercial and Institutional Building Construction, North American Industry Classification System (NAICS) code 236220. The small business size standard is $45.0 million. The magnitude of this requirement is estimated to be $225,000,000 (five year ordering period).In accordance with FAR Part 36.211 Distribution of Advance Notices and Solicitations, contractors are required to submit requests for equitable adjustment as a result of change orders to the issuing Contracting Officer. Contractors are required to acknowledge the change order within 30 days and are to submit their request for adjustment which includes all supporting documents as soon as possible, but not later than the required completion date of the contract. Place of Contract Performance: Fort Drum, New York 1360218. Set-aside Status: This acquisition is a 100% competitive 8(a) set-aside, pursuant to the requirements of FAR section 19.805, Competitive 8(a).
-AwardedOpen

Additional Details

Solicitation Number

W912DS19R0019

Archive Date

Aug 4, 2020

Office Address

NEW YORK, NY, 10278-0004