GovChime
Notice ID: 8dba3644a49b4abea9f12370a899045bSolicitation

Maintenance Dredging of Red Hook Flats Anchorage, New York Harbor, Federal Navigation Project

Archived on August 23, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
August 9, 2023
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW YORK
Place of performance
Brooklyn, NY, 11231
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912DS23B0010
Notice ID
8dba3644a49b4abea9f12370a899045b

Description

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Red Hook Flats Anchorage, New York Harbor, Federal Navigation Project to depths of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth, -40 feet MLLW plus 2 feet of allowable overdepth and -45 feet MLLW plus 2 feet of allowable overdepth. The proposed maintenance dredging would remove approximately 500,000 cubic yards (CY) of material from the critical shoal area, located within the Red Hook Flats Anchorage. The dredged material would be dredged and subsequently placed at the Historic Area Remediation Site (HARS), approximately 4 miles east of Sandy Hook, New Jersey. The dredged material is expected to consist primarily of silt and clay. Based on the past dredging projects within the New York Harbor, and restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, multiple ocean-going, bottom-dumping barges, tugboats and survey vessels will be needed to perform the work during the dredging and placement activities. The dredging and placement at the HARS would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed, and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. This is an unrestricted procurement.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912DS23B0010
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationApr 5, 2023

    Maintenance Dredging of Red Hook Flats Anchorage, New York Harbor, Federal Navigation Project

    Notice dfa160807af44fd59fe5a3e3f99a64b3 on SAM.gov

  2. 5×
    SolicitationCurrentJul 6, 2023

    Maintenance Dredging of Red Hook Flats Anchorage, New York Harbor, Federal Navigation Project

    Notice 8dba3644a49b4abea9f12370a899045b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DS23B0010

Archive Date

Aug 23, 2023

Office Address

NEW YORK, NY, 10278-0004