Notice ID: c7fed132b5a343379c7509450106fd1eSolicitation
Maintenance Dredging of Shrewsbury River, New Jersey Federal Navigation Project - Beach
Archived on August 2, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- July 18, 2023
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW YORK
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912DS23B0018
- Notice ID
- c7fed132b5a343379c7509450106fd1e
Description
Abstract
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912DS23B0018- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationMay 16, 2023
Maintenance Dredging of Shrewsbury River, New Jersey Federal Navigation Project - Beach
- 7×SolicitationCurrentJun 16, 2023
Maintenance Dredging of Shrewsbury River, New Jersey Federal Navigation Project - Beach
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
96% | Awarded | Open | |
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. | 84% | Solicitation | 11/20/2026 |
80% | Awarded | Open | |
As of 15 May 2026: Posting of Bid Abstract. As of 12 May 2026: Amendment 0004 posted to provide responses to contractor inquiries. As of 06 May 2026: Amendment 0003 posted to provide responses to contractor inquiries. As of 05 May 2026: Amendment 0002 posted to include WQC, revied specs, revised ATOPSEC, and responses to RFIs. As of 24 April 2026: Amendment 0001 posted to correct Section 00 21 00 and provide additional bidder instructions. The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging New York and New Jersey Channels, Seguine/Ward/Outerbridge Federal Navigation Project to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 foot allowable overdepth. The proposed maintenance dredging would remove approximately 330,000 cubic yards (CY) of selected critical shoals from the Seguine/Ward/Outerbridge reaches with subsequent placement at the Historic Area Remediation Site (HARS). Dredging in this channel would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2-foot allowable overdepth. The dredged material is expected to consist primarily of silt and sand. Due to expected restrictions in the State Water Quality Certificates, the proposed work will likely require using a mechanical dredge with an environmental clamshell bucket. Additionally, multiple ocean-going, bottom-dumping barges, tugboats and survey vessels will be needed to perform the work during the dredging and placement activities. The dredging and placement at the HARS would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of material. The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. Plans and specifications for the subject project are expected to be available in April of 2026, with bid opening in May 2026. It is the intention of the government to award in late June 2026 and the proposed work is anticipated to take place between September and December 2026. The work is estimated to cost between $5,000,000 and $15,000,000. Liquidated damages of $2,987 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. | 80% | Solicitation | 05/15/2026 |
Award from Solicitation No. W911XK26BA009 for the Alpena Harbor Maintenance Dredging | 77% | Awarded | Open |
Additional Details
Solicitation Number
W912DS23B0018
Archive Date
Aug 2, 2023
Office Address
NEW YORK, NY, 10278-0004