Notice ID: a470863d1ff645d3a56c8accfcb19010Solicitation
Maintenance Dredging of Great Kills Harbor, Federal Navigation Project
Archived on July 12, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 AM UTC−04:00
- Posted
- July 17, 2024
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW YORK
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912DS24B0012
- Notice ID
- a470863d1ff645d3a56c8accfcb19010
Description
As of 17 July 2024, a revised bid abstract has been posted to a) revise the IGE mobilization and demobilization estimated amount, b) correct the unit price of CLIN 0002 from $11.00 to $21.37 based on the revised IGE and, c) include the name of Offeror No.1. As of 27 June 2024 the bid abstract has been posted. As of 20 June 2024 Amendment 0002 has been posted all with all revised documents. As of 31 May 2024 Amendment 0001 has been posted. The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Great Kills Harbor Federal Channel. The dredged material would be dredged and subsequently placed at the Historic Area Remediation Site (HARS). The project scope consists of removing approximately 200,000 cubic yards of dredged material from Great Kills Harbor. Dredging would be required to a depth of -10 feet and - 8 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth, respectively. The dredged material consists primarily of sand and gravel.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DS24B0012- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 5×SolicitationCurrentMay 28, 2024
Maintenance Dredging of Great Kills Harbor, Federal Navigation Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
96% | Awarded | Open | |
Market Survey Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the critical shoal area. The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt, clay, and some sand. Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, contractor provided, state permitted upland placement site(s) would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. All necessary permits required for the dredged material placement will be provided by the contractor to the government. The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 3,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place in the summer / fall of 2027. SURVEY OF THE DREDGING INDUSTRY The following confidential survey questionnaire is designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Arthur Kill 50 foot Reach maintenance dredging project. General 1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience. 2. Have you performed dredging within the waters of the Port of New York and New Jersey? 3. Do you have experience with the placement of dredged material at a suitable, contractor provided, state permitted upland placement site? Please list your experience. 4. What percentage of work (volume of material dredged, transported, processed and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor? 5. Would you be willing to bid on the project previously described? If the answer is No, please explain why not. 6. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture? 7. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit? 8. What is the largest dredging contract, in dollars, on which you were the prime contractor? 9. What is your bonding capacity per contract? What is your total bonding capacity? 10. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates? 11. In the event that the USACE transitions from Resident Management System (RMS) to an alternative construction management system during the contract, will the contractor be ready to adapt to the new management system? 12. Do you have experience applying USACE EM 385-1-1 (Mar 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes. Equipment 13. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics. 14. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth. 15. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity. 16. Do you have the capability to process the dredged material on your own? If so please explain. If not, what commercial provider of dredge material processing will you engage for this project? What is the daily processing capacity in either case? 17. Will you be able to meet a production rate of 3,000 cubic yards per calendar day and complete all work? 18. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box / Silent Inspector) employing a Dredged Material Inspector (DMI)? | 91% | Market Research | 12/02/2026 |
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. | 88% | Solicitation | 11/20/2026 |
FY25 Lexington Harbor Maintenance Dredging. Mobilize to Lexington, Michigan and dredge the federal navigation channel as indicated in the contract drawings and specifications. Place dredged material as indicated in the contract drawings and specifications. Demobilize when dredging work is completed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?. | 88% | Awarded | Open |
Mobile Harbor Maintenance Dredging | 88% | Solicitation | 05/04/2026 |
Additional Details
Solicitation Number
W912DS24B0012
Archive Date
Jul 12, 2024
Office Address
NEW YORK, NY, 10278-0004