GovChime
Notice ID: 08f21908c3ff454082b9a5faa76542e6Presolicitation

Hybrid vessel Charging System Project at Caven Point Marine Terminal

Archived on September 6, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
August 7, 2024
Notice type
Presolicitation
NAICS
713930: Marinas
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW YORK
Place of performance
Jersey City, 07305
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912DS24S0055
Notice ID
08f21908c3ff454082b9a5faa76542e6

Description

The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system. Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment. This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DS24S0055
  1. Market Research
  2. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 2×
    Market ResearchJul 1, 2024

    Hybrid vessel Charging System Project at Caven Point Marine Terminal

    Notice 9d453904a6454efa87c98d880ead5723 on SAM.gov

  2. Pre-SolicitationCurrentAug 7, 2024

    Hybrid vessel Charging System Project at Caven Point Marine Terminal

    Notice 08f21908c3ff454082b9a5faa76542e6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DS24S0055

Archive Date

Sep 6, 2024

Office Address

NEW YORK, NY, 10278-0004