GovChime
Notice ID: ef5412fc0d154e4082ea2f01a6e286f2Award NoticeAwarded

FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

Awarded on September 28, 2026. Full description on SAM.gov.

Awarded tounder W912DS26CA026 (source: SAM.gov award notice)• $7.8M

Overview

Posted
September 30, 2026
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW YORK.W2SD ENDIST NEW YORK
Place of performance
Bridgewater, New Jersey
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 28, 2026
Award amount (SAM.gov award notice)
$7.8M

Identifiers

Solicitation number
W912DS26BA025
Notice ID
ef5412fc0d154e4082ea2f01a6e286f2
Award number (PIID)
W912DS26CA026

Description

Award Overview

Award Number

W912DS26CA026

Award Amount (SAM.gov award notice)

$7.8M

Award Date

Sep 28, 2026

Awardee

Awardee UEI

KLQNR9EK43F2

Awardee CAGE Code

9YTK5

Awardee Address

171 ROUTE 94, Lafayette, NJ 07848, UNITED STATES

Original Solicitation

Notice ID: ef5412fc0d154e4082ea2f01a6e286f2

Posted Date: Sep 30, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Lifecycle

  1. 1
    Version 1Solicitation

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice f4d2f1f8273747e79fc62017e8c98fe9 on SAM.gov

  2. 2
    Version 2Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice ef5412fc0d154e4082ea2f01a6e286f2 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJul 2, 2026

    Finderne Farms Wetland Mitigation Site, Bridgewater, NJ

    Notice bcad36e3cf8f4d84aa8c650073fe2b55 on SAM.gov

  2. SolicitationRelated noticeAug 17, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice efb8c3c598604760b15f71cd90522aef on SAM.gov

  3. SolicitationRelated noticeAug 24, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice 0d0bb80e032b4ca4a665de143d488329 on SAM.gov

  4. SolicitationRelated noticeAug 26, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice 7e008667c73e425fa80883f6ae2c302a on SAM.gov

  5. SolicitationRelated noticeSep 1, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice 207e7a98d1ff434f8ed26b0fcf18f8ba on SAM.gov

  6. SolicitationRelated noticeSep 2, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice a38e55bf632c43ec84275639f18ecd72 on SAM.gov

  7. SolicitationRelated noticeSep 3, 2026

    FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

    Notice d4e6e2106fd04cb9a2d4af8c6460cf0d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
100%
Solicitation09/09/2026
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
52%
Solicitation10/21/2026
**************ASSOCIATED SOLICITION W9128F27RA063 HAS BEEN POSTED************ The solicitation number was updated. This is a pre-solicitation notice. This is not a solicitation and any offers received as a result of this pre-solicitation notice will not be accepted or evaluated. USACE Omaha District intends to issue Request for Proposal (RFP) solicitation W9128F27RA056 for the following action in November 2026 with the planned proposal due date in January 2027. ***PLEASE REFERENCE THE SITE VISIT INSTRUCTIONS IN THE ATTACHED DOCUMENT AND RESPOND NO LATER THAN THE DATE SHOWN. Project Title: Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site Project Location: One mile north of the town of Creede in Mineral County, Colorado NAICS Code: 237990 - Other Heavy and Civil Engineering Construction PSC Code: Y1LC - Construction of Tunnels and Subsurface Structures Set-Asides: This solicitation will be issued unrestricted; both small and large businesses are encouraged to participate. Synopsis of Project: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel. The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel. The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components. 1. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool. 2. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned. 3. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel.4. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level. Additional Information can be found at the following EPA website provided in the attachment.
47%
Pre-Solicitation11/20/2026
NOTE: SOLICITATION W9128F27RA063 is associated with Pre-Solicitation Notice W9128F27RA056.The project is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead at the Nelson Tunnel superfund site in the San Juan Mountains near Creede, CO. PROJECT DESCRIPTION: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel. The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel.The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level. The solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The acquisition approach for this project will be Best Value Tradeoff following the Federal Acquisition Regulation (FAR) Part 15 procedures. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237990 is included in their profile prior to submission of offers.
47%
Solicitation01/06/2027
Market Survey Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the critical shoal area. The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt, clay, and some sand. Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, contractor provided, state permitted upland placement site(s) would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. All necessary permits required for the dredged material placement will be provided by the contractor to the government. The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 3,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place in the summer / fall of 2027. SURVEY OF THE DREDGING INDUSTRY The following confidential survey questionnaire is designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Arthur Kill 50 foot Reach maintenance dredging project. General 1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience. 2. Have you performed dredging within the waters of the Port of New York and New Jersey? 3. Do you have experience with the placement of dredged material at a suitable, contractor provided, state permitted upland placement site? Please list your experience. 4. What percentage of work (volume of material dredged, transported, processed and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor? 5. Would you be willing to bid on the project previously described? If the answer is No, please explain why not. 6. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture? 7. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit? 8. What is the largest dredging contract, in dollars, on which you were the prime contractor? 9. What is your bonding capacity per contract? What is your total bonding capacity? 10. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates? 11. In the event that the USACE transitions from Resident Management System (RMS) to an alternative construction management system during the contract, will the contractor be ready to adapt to the new management system? 12. Do you have experience applying USACE EM 385-1-1 (Mar 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes. Equipment 13. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics. 14. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth. 15. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity. 16. Do you have the capability to process the dredged material on your own? If so please explain. If not, what commercial provider of dredge material processing will you engage for this project? What is the daily processing capacity in either case? 17. Will you be able to meet a production rate of 3,000 cubic yards per calendar day and complete all work? 18. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box / Silent Inspector) employing a Dredged Material Inspector (DMI)?
46%
Market Research12/02/2026

Additional Details

Solicitation Number

W912DS26BA025

Archive Date

Sep 30, 2027

Office Address

NEW YORK, NY, 10278-0004