GovChime
Notice ID: e1a431e336ca4094987d1244ee76b781Solicitation

Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

Responses closed . Full description on SAM.gov.

Description

As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18.

As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. 

As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. 

As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents.

As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation.

As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW YORK.W2SD ENDIST NEW YORK
Posted:October 20, 2026
NAICS:237990: Other Heavy and Civil Engineering Construction
Last Updated:Oct 20, 2026
First published:
Last updated on SAM.gov:
PSC:Y1PZ: CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set-Aside:Not specified
Type:Solicitation
Place of Performance:Port Monmouth, New Jersey

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (20)

  • Solicitation Amendment W912DS26RA0320004 SF 30.pdf

    3.8 MBAdded in Solicitation version 10Posted
    Download
  • Solicitation Amendment W912DS26RA0320003 SF 30.pdf

    3.8 MBAdded in Solicitation version 8Posted
    Download
  • Solicitation Amendment W912DS26RA0320002 SF 30.pdf

    3.8 MBAdded in Solicitation version 8Posted
    Download
  • Solicitation Amendment W912DS26RA0320001 SF 30.pdf

    645 KBAdded in Solicitation version 6Posted
    Download
  • Phase One of a Two Phase Design-Build Selection Procedure_Amendment 0001.pdf

    968 KBAdded in Solicitation version 6Posted
    Download
  • Phase Two of a Two Phase Design-Build Selection Procedure-Amendment 0001.pdf

    203 KBAdded in Solicitation version 6Posted
    Download
  • RTA_30_As-Built_Contract_2_Part-1.pdf

    21 MBAdded in Solicitation version 5Posted
    Download
  • RTA_30_As-Built_Contract_2_Part-2.pdf

    20 MBAdded in Solicitation version 5Posted
    Download
  • RTA 30 Package - Design Build RFP.pdf

    1.3 MBAdded in Solicitation version 4Posted
    Download
  • RTA_30_As-Built_Contract_3.pdf

    24 MBAdded in Solicitation version 5Posted
    Download
  • RTA 30 Package - Design Drawings.pdf

    11 MBAdded in Solicitation version 4Posted
    Download
  • RTA_30_As-Built_Contract_4A.pdf

    14 MBAdded in Solicitation version 5Posted
    Download
  • RTA_30_As-built_Contract_5_Part 1.pdf

    37 MBAdded in Solicitation version 5Posted
    Download
  • RTA 30 Package - Technical Specifications.pdf

    3.8 MBAdded in Solicitation version 4Posted
    Download
  • RTA_30_As-built_Contract_5_Part 2.pdf

    36 MBAdded in Solicitation version 5Posted
    Download
  • RTA 30 Package - Design Documentation Report.pdf

    11 MBAdded in Solicitation version 4Posted
    Download
  • RTA_30_Permits_Review Comments.pdf

    3.2 MBAdded in Solicitation version 5Posted
    Download
  • Solicitation - W912DS26RA032.pdf

    6.3 MBAdded in Solicitation version 3Posted
    Download
  • Phase One of a Two Phase Design-Build Selection Procedure.pdf

    511 KBAdded in Solicitation version 3Posted
    Download
  • Phase Two of a Two Phase Design-Build Selection Procedure.pdf

    354 KBAdded in Solicitation version 3Posted
    Download

Lifecycle

  1. 2
    Version 2Special NoticeArchived

    Advance Notice - Design and construction of the Port Monmouth Phase II, Contract 1 Mitigation project in Middletown Township, Monmouth County, New Jersey.

    Notice f926fc276e2e407495e51121db61abd9 on SAM.gov

  2. 3
    Version 3Solicitation

    Type changed from Special Notice to Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice e194e26d977a46388cf7f215ffc8f94d on SAM.gov

  3. 4
    Version 4Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice ac6cf6b5c4b941ed9e116ed68b99649a on SAM.gov

  4. 5
    Version 5Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice 8cf51b8681cf4e48b323420c908c94ba on SAM.gov

  5. 6
    Version 6Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice c507dc25c1244feb821d4336603b529f on SAM.gov

  6. 7
    Version 7Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice 0d16e47ae3a24ac8b601be92626e96e1 on SAM.gov

  7. 8
    Version 8Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice 6555bb65bd024a1f92f97302508265d9 on SAM.gov

  8. 9
    Version 9Solicitation

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice 61c261d2f54a4c1db4fdac5ab24a8922 on SAM.gov

  9. 10
    Version 10SolicitationCurrent

    Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

    Notice e1a431e336ca4094987d1244ee76b781 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

W912DS26RA032

Archive Date

Oct 19, 2027

Office Address

NEW YORK, NY, 10278-0004