Notice ID: 223411a105fe4e2082578f6f2b00701eSources SoughtArchived
Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
Archived on February 26, 2026. Original response deadline: . Full description on SAM.gov.
Superseded — see the current version
Overview
- Response deadline
- 12:00 PM EST
- Posted
- December 22, 2025
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW YORK
- Place of performance
- 10306
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- w912ds26s0009
- Notice ID
- 223411a105fe4e2082578f6f2b00701e
Description
FY26 Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project Market Research Survey Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York and New Jersey Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Channel to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The proposed maintenance dredging would remove approximately 330,000 cubic yards (CY) of material from the critical shoal area with subsequent placement at the Historic Area Remediation Site (HARS), approximately 5 miles east of Sandy Hook, New Jersey. Based on the past dredging projects within the New York Harbor / New York and New Jersey Channels, and restrictions found in the New York State Department of Environmental Conservation / New Jersey Department of Environmental Protection Water Quality Certificates, the proposed work would be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, multiple ocean- going, bottom-dumping barges, tugboats and survey vessels will be needed to perform the work during the dredging and placement activities. The dredging and placement at the HARS would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed, and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place in the summer/fall of 2026 The work is estimated to cost between $10,000,000 and $25,000,000. SURVEY OF THE DREDGING INDUSTRY The following confidential survey questionnaire is designed to apprise the Corps of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regards to the New York and New Jersey Channels, Seguine/Ward/Outerbridge Reaches, maintenance dredging project. General 1) Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience. 2) you previously performed dredging within the waters of New York and New Jersey? 3) Do you have experience with the placement of dredged material at the HARS? Please list your experience. 4) What percentage of work (volume of material dredged, transported, and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor? 5) Would you be willing to bid on the project described? If the answer is No, please explain why not. 6) Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s), or as a joint venture? 7) Is there a dollar limit on the size of contract that you would bid? If so, what is that limit? 8) What is the largest dredging contract, in dollars, on which you were the prime contractor? 9) What is your bonding capacity per contract? What is your total bonding capacity? 10) Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates? 11) Do you have experience applying USACE EM 385-1-1 (March 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes. Equipment 12) What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, and final ocean placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics. 13) Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth. 14) Do you own ocean-going material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean going, bottom dump, etc.) and the capacity. 15) Will you be able to meet a production rate of 8,000 cubic yards per calendar day and complete all work? 16) Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box/Silent Inspector) employing a Dredged Material Inspector (DMI)? 17) Are you aware that the Contractor is responsible for coordinating with the Federal Aviation Administration (FAA) for an FAA Obstruction Evaluation / Airport Airspace Analysis? Have you had any experience requesting for FAA Obstruction Evaluation / Airport Airspace Analysis? If so, please list the 3 most recent projects along with the project's NTP, the review submission date, the number of studies conducted, and duration of the review. 18) What are the minimum and maximum boom heights to operate your dredge(s) safely and efficiently?
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Adrian Stafford-Browne
Secondary Contact
Nicholas P. Emanuel
Documents
No documents available.
Lifecycle
- 1Version 1Sources SoughtArchivedCurrent
Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
- 2Version 2Sources SoughtArchived
Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
- 4Version 4Sources SoughtArchived
Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 00001: Amendment 00001 includes information on a site visit to be conducted on November 13, 2026 at 12:00 pm EST. The address for this site visit is: 1201 E 185th St, Cleveland, OH 44119. Additionally, this amendment includes changes to the plans and specs to no longer include tree felling as part of the project requirements. The contractor will still be required to remove the felled trees from the work site. Please acknowledge this amendment in the submission of your bids. This posting is an Invitation for Bid (IFB) issued by the U.S. Army Corps of Engineers, Buffalo District, for the construction of the Euclid Creek Fishway at the existing Euclid Creek Spillway in Cleveland, Cuyahoga County, Ohio. The project includes construction of a fishway within the existing spillway and modification of the spillway as necessary to accommodate the fishway. Additional work includes construction of an access road, retaining wall, railing, and road gate; tieback design and tieback fabrication/installation for the retaining wall; and site restoration in accordance with the plans and specifications. Associated work includes concrete removal, excavation, dewatering, clearing and grubbing, and other incidental work necessary to provide a complete and usable project. The North American Industry Classification System (NAICS) code for this procurement is 237990, Other Heavy and Civil Engineering Construction. This acquisition will be competed as a 100% Small Business Set-Aside. The magnitude of construction is estimated to be between $5,000,000 and $10,000,000.Please be advised that this requirement is subject to change and may be revised or canceled at any time prior to award. | - | Solicitation | 12/03/2026 |
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | - | Solicitation | 10/21/2026 |
THIS IS A PROJECT LABOR AGREEMENT (PLA) NOTICE TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SYNOPSIS OR ANY FOLLOW UP INFORMATION REQUESTS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME; HOWEVER, RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. NO RESPONSES TO THIS PLA NOTICE WILL BE POSTED TO SAM.GOV. The purpose of this announcement is to gain knowledge of the use and benefits of Project Labor Agreements (PLAs), Liberty State Park Ecosystem Restoration Project located in Jersey City, NJ. The NAICS Code is 237990 (Other Heavy and Civil Engineering Construction). Any potential solicitation(s) that may proceed from this notice will be posted to sam.gov. All interested offerors will have the opportunity to respond to a solicitation announcement later if a solicitation is issued. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for construction of the Liberty State Park Ecosystem Restoration Project located in Jersey City, NJ. The goal of the project is to create a resilient coastal ecosystem within a highly urbanized setting that provides both ecological and social benefits. Primary project components include: Restoration of the Liberty State Park interior including approximately 46.2 acres of tidal wetland habitat, 25.0 acres of non-tidal wetland habitat, and 72.6 acres of native upland habitat. Enhancement of approximately 7.1 acres of existing non-tidal wetland (4.5 acres) and upland (2.6 acres) habitats by removing invasive flora and planting native species. Creation of park amenities to accommodate and provide public interaction with this habitat restoration project, such as trail networks, overlooks, bird blinds, viewing hills, and a restroom. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for this project. The magnitude of the Liberty State Park Ecosystem Restoration project is between $100,000,000 and $250,000,000. The duration of construction is anticipated to be approximately 1,686 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in October 2027. Responses to this source sought will be used by the Government to help determine whether the use of a PLA will achieve economy and efficiency in the completion of the subject project. All firms and labor unions should respond to this announcement if they are interested in performing the work for this project. PLA DEFINITION A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project (see 22.502), agencies shall require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.504(d) applies. An agency may require the use of a project labor agreement on projects where the total cost to the Federal Government is less than that for a large-scale construction project, if appropriate. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and Be consistent with law. Agencies may consider the following factors in deciding whether the use of a project labor agreement is appropriate for a construction project where the total cost to the Federal Government is less than that for a large-scale construction project: The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. There is a shortage of skilled labor in the region in which the construction project will be sited. Completion of the project will require an extended period of time. Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs. Any other factors that the agency decides are appropriate. For indefinite-delivery indefinite-quantity (IDIQ) contracts the use of a project labor agreement may be required on an order-by-order basis rather than for the entire contract. For an order at or above $35 million an agency shall require the use of a project labor agreement unless an exception applies. See 22.504(d)(3) and 22.505(b)(3). PLA COMMENT SOLICITATION In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: Have comparable projects been undertaken by Federal, State, municipal, or private entities in the geographic area of this project? Do you have knowledge that a PLA has been used in the local area on similar projects? If so, please provide supporting documentation. For each project, please indicate if a PLA was used, the initial and final cost if available, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? Are there concerns by prime contractors on the availability of skilled construction labor? Are there large-scale construction projects in the area (over $25M, within 50 miles of Jersey City, NJ) which could impact availability of skilled labor for this project? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Are existing apprentice programs providing enough skilled workers for future requirements? If so, please elaborate and provide supporting documentation where possible. Are you aware of time sensitive issues/scheduling requirements that would impact the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. Is the proposed schedule/completion time one which would benefit from a PLA – if so, how? Will a PLA impact the completion time? How would a PLA benefit a project which contains a unique and compelling mission-critical schedule? Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in federal procurement. Are there any other economies or efficiencies derived by the Federal Government, if using a PLA? Identify specific reasons why you don’t believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. Are there any concerns regarding labor-management stability related to this project? Will the use of a PLA produce labor-management stability on this project? Have labor disputes or other labor issues contributed to project delays in the local area? Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve? What market share does union labor in construction trades have in the geographic area? Which existing Collective Bargaining Agreements will expire during construction of this project? Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? What is the estimated relative cost impact of using a PLA? Will a PLA impact the cost of submitting an offer? Will the use of PLAs impact the ability of potential offerors and subcontractors to meet small-business utilization goals? Should a PLA be executed on the above referenced project? What benefits do you believe a PLA could achieve? What other factors should the Corps consider? Please identify any additional information you believe should be considered on the use of a PLA on the referenced project. Please identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. Please note that this notice is not a commitment on the part of the Government to award a contract because of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. Responders should not construe this PLA Notice as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Please submit written comments by email to Mr. Nicholas Emanuel, Contracting Officer at Nicholas.P.Emanuel@usace.army.mil and Mrs. Jordan Moran, Contract Specialist, at Jordan.K.Moran@usace.army.mil. Survey Questionnaires will not be accepted after 4:00 pm on the response date shown in the advertisement on sam.gov. If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will be moved to the next business day. | - | Special Notice | 10/30/2026 |
THIS IS A SOURCES SOUGHT ANNOUNCEMENT TO BE USED FOR MARKET ANALYSIS ONLY. NO AWARDS WILL BE MADE FROM THE RESPONSES TO THIS SYNOPSIS. NO SOLICITATION WILL BE AVAILABLE AT THIS TIME. HOWEVER, RESPONSES WILL BE USED TO DETERMINE THE APPROPRIATE ACQUISITION STRATEGY FOR A FUTURE ACQUISITION. The purpose of this announcement is to gain knowledge of potential business sources; with specific interest in small business, certified 8(a) serviced by SBA districts, certified HUB Zone, and Service-Disabled Veteran-Owned Small Business (SDVOSB), for work on a wetland restoration and park amenities construction contract. The NAICS Code is 237990 (size standard $45,000,000 average annual receipts for preceding five fiscal years). No awards will be made from the responses to this synopsis. No solicitation will be available at this time. Responses will be used to determine appropriate acquisition decisions for a future procurement. A. BACKGROUND AND INFORMATION FOR CONSTRUCTION CONTRACT The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for primarily ecosystem restoration at Liberty State Park, Jersey City, New Jersey. 1. The goal of the project is to create a resilient coastal ecosystem within a highly urbanized setting that provides both ecological and social benefits. Primary project components include: Restoration of the Liberty State Park interior including approximately 46.2 acres of tidal wetland habitat, 25.0 acres of non-tidal wetland habitat, and 72.6 acres of native upland habitat. Enhancement of approximately 7.1 acres of existing non-tidal wetland (4.5 acres) and upland (2.6 acres) habitats by removing invasive flora and planting native species. Creation of park amenities to accommodate and provide public interaction with this habitat restoration project, such as trail networks, overlooks, bird blinds, viewing hills, and a restroom. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for this project. 2. The magnitude of the Liberty State Park Ecosystem Restoration project is between $100,000,000 and $250,000,000. The duration of construction is anticipated to be approximately 1,686 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur approximately in October 2027. B. OPERATIONAL CONSTRAINTS The Contractor will conform to all local, state, and federal laws while carrying out the construction process for this project. This includes paying all fees and obtaining all permits required for the work. The Contractor shall prepare and submit a site-specific safety and health plan to the Government for approval prior to mobilization. C. SURVEY OF THE CONSTRUCTION CONTRACTOR INDUSTRY The following is a confidential survey questionnaire designed to apprise the US Army Corps of Engineers, NY District, of any prospective construction contractors’ project execution capabilities. Please provide your response to the following questions. At the end of this survey, you will be asked to provide any comments. General The proposed project is for the Liberty State Park Ecosystem Restoration project: Description of project: ecosystem restoration and park amenities. The proposed project is for construction. The North American Industry Classification System (NAICS) code is 237990. The Small Business Size standard is $45,000,000. The following information is required from interested sources: Name of firm with address, phone, and fax number, point of contact and email address. Identification and verification of the company as a Small Business Administration (SBA) certified HUBZone Small business firm, or a Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or an SBA certified 8(a) firm with an SBA approved office for performing a competitive acquisition in the State of New York, or a Small Business firm under the size standard assigned to the procurement. A CAGE Code and UEI (Unique Entity ID) Number for the firm. Statement of Interest: Would you be willing to bid on the project described above? Please provide a brief description. If the answer is no, please explain why not. If you were to bid, would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s), or as a joint venture? Is there a dollar limit on the size contract that you would bid? What are the largest construction contracts (in dollar amounts) on which you were the prime contractor? The scope of this construction contract involves Munitions and Explosives of Concern (MEC). What is your experience with this type of work, either performing as the prime or overseeing a qualified subcontractor? The scope of this construction contract involves removal of Resource Conservation and Recovery Act (RCRA) hazardous waste. What is your experience with this type of work, either performing as the prime or overseeing a qualified subcontractor? Qualification Criteria: Responses to this Source Sought shall provide information that indicates the contractor has the experience to perform the work as specified above. Firms should respond to this notice by providing at least three relevant projects that the firm performed as a Prime Contractor. No more than five relevant projects can be submitted as Past Experience. Firms shall provide the dollar value of past relevant projects that the firm performed. What is your bonding capacity per contract? What is your total bonding capacity. The interested contractor should list the percentage and type of work that they will self-perform. Interested responders should refer to the following FAR Clauses to see the Limitations on Subcontracting that pertains to specific Set-asides. FAR 52.219-14 pertains to Small Business and 8(a) Set-asides. If the acquisition is set-aside for all Small Businesses or the 8(a) Program, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. FAR 52.219-3 pertains to HUBZone Set-asides. If the acquisition is set-aside for HUBZone Small Businesses, at least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the HUBZone prime contractor’s employees; and at least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the HUBZone Prime Contractor’s employees or on a combination of the HUBZone Prime Contractor’s employees and employees of HUBZone Small Business concern Subcontractors; and no more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone Small business concerns. FAR 52.219-27 pertains to Service-Disabled Veteran Owned Small Business (SDVOSB) set-asides. If the acquisition is set-aside for SDVOSB, at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern’s employees or the employees of other Service-Disabled Veteran Owned Small Business concerns. A joint venture may be considered a Service-Disabled Veteran Owned Small Business concern if at least one member of the joint venture is a Service-Disabled Veteran-Owned Small Business concern, and makes the following representations: That it is a Service-Disabled Veteran Owned Small Business concern, and that it is a Small Business concern under the North American Industry Classification Systems (NAICS) code assigned to the procurement; and each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement; and the joint venture meets the requirements of paragraph 7 of the explanation of Affiliates in 19.101 of the Federal Acquisition Regulation. The joint venture meets the requirements of 13 CFR 125.15(b) D. Contractor’s Comments or Recommendations Please provide comments or recommendations, if any. Please note that this notice is not a commitment on the part of the Government to award a contract as a result of this notice or to pay for any information received. This synopsis neither constitutes a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. The Government should not construe this Sources Sought Synopsis as a commitment for any purpose. The Government does not intend to rank submittals or provide any reply to interested firms. Submit Survey Questionnaires to: Attn: Nicholas Emanuel and Jordan Moran, CENAN‑CT, US Army Corps of Engineers, NY District, 26 Federal Plaza, New York, NY, 10278 Email: Nicholas.P.Emanuel@usace.army.mil and Jordan.K.Moran@usace.army.mil Survey Questionnaires will not be accepted after 4:00 pm on the original response date shown in the advertisement in the System for Award Management (SAM.gov). If the original response date falls on a Saturday, Sunday, or a Federal Holiday, the response date will be moved to the next business day. Firms responding to this source sought announcement, who fail to provide ALL the required information requested, will not be used to assist the Government in the acquisition decision, which is the intent of this sources sought announcement. | - | Market Research | 10/30/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
w912ds26s0009
Archive Date
Feb 26, 2026
Office Address
NEW YORK, NY, 10278-0004