GovChime
Notice ID: 9f0b5e53c0004fb58b1b5d22a70352ffSources Sought

Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
November 17, 2026
Notice type
Sources Sought
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW YORK.W2SD ENDIST NEW YORK
Last updated
Nov 17, 2026

Identifiers

Solicitation number
W912DS27S0009
Notice ID
9f0b5e53c0004fb58b1b5d22a70352ff

Description

Market Survey

Background Information

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the critical shoal area. The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt, clay, and some sand.

Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, contractor provided, state permitted upland placement site(s) would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. All necessary permits required for the dredged material placement will be provided by the contractor to the government.

The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government.

Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 3,000 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.

The proposed work is anticipated to take place in the summer / fall of 2027.

SURVEY OF THE DREDGING INDUSTRY

The following confidential survey questionnaire is designed to apprise USACE of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the Arthur Kill 50 foot Reach maintenance dredging project.

General

1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.

2. Have you performed dredging within the waters of the Port of New York and New Jersey?

3. Do you have experience with the placement of dredged material at a suitable, contractor provided, state permitted upland placement site? Please list your experience.

4. What percentage of work (volume of material dredged, transported, processed and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor?

5. Would you be willing to bid on the project previously described? If the answer is No, please explain why not.

6. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?

7. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?

8. What is the largest dredging contract, in dollars, on which you were the prime contractor?

9. What is your bonding capacity per contract? What is your total bonding capacity?

10. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates?

11. In the event that the USACE transitions from Resident Management System (RMS) to an alternative construction management system during the contract, will the contractor be ready to adapt to the new management system?

12. Do you have experience applying USACE EM 385-1-1 (Mar 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes.

Equipment

13. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics.

14. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth.

15. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity.

16. Do you have the capability to process the dredged material on your own? If so please explain. If not, what commercial provider of dredge material processing will you engage for this project? What is the daily processing capacity in either case?

17. Will you be able to meet a production rate of 3,000 cubic yards per calendar day and complete all work?

18. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box / Silent Inspector) employing a Dredged Material Inspector (DMI)?

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DS27S0009
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentNov 17, 2026

    Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project

    Notice 9f0b5e53c0004fb58b1b5d22a70352ff on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DS27S0009

Archive Date

Dec 17, 2026

Office Address

NEW YORK, NY, 10278-0004