Notice ID: 13325831b8d44d58be1a1234177dd99dSolicitation
FY20 SOF 22 STS Operations Facility at JBLM WA
Archived on February 15, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−08:00
- Posted
- January 28, 2020
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W071 ENDIST SEATTLE
- Place of performance
- Joint Base Lewis McChord, Tacoma
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912DW20R0001
- Notice ID
- 13325831b8d44d58be1a1234177dd99d
Description
The USACE Seattle District has a requirement for the construction of a combined 85,000 Square Footage (SF), squadron operations building and eight-story parachute drying tower, 12,000 SF covered storage area, and 60,300 SF of demolition for five buildings/structures at JBLM near Lakewood, WA. The squadron operations facility is located within the McChord Field Area Development Plan. The project will consist of construction of a new multibuilding, Special Tactics Squadron (STS) operations compound. Facilities shall have foundations and floor slabs, structural framing, insulated walls and roofs, environmental control (heating, ventilation, and air conditioning), fire detection and suppression, etc. Squadron operations functional areas include: operations with secure planning, logistics, medical, team rooms, simulator room, classroom, associated staff offices, vehicle maintenance shop, storage and staging areas, pre-engineered metal building, antenna farm, radio maintenance, armory, elevator, bathrooms, Aircrew Flight Equipment (AFE) shop, etc. Parachute drying tower is integrated with operations AFE shop and climbing wall. All buildings’ supporting facilities include utilities and connections, parking (approximately 150 spaces), information systems, communications with information transfer node (ITN) site development, cyber security measures lighting, paving, walks, curbs, and gutters, landscaping and signage are all inclusive to the project. Special site conditions include potential for asbestos removal during demolition. Special site conditions also includes requirement for multiple retaining walls and storm water runoff control to accommodate significant grade changes on the site IAW JBLM’s MS4 permit requirements and project site is adjacent to a flight line. Coordination with public and private utility contractors required. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with Department of Defense (DoD) Minimum Anti-Terrorism Standards for Buildings. See attached Request for Proposal (RFP) and attachments
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
JOHN SCOLA
CONTRACT SPECIALIST
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912DW20R0001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationOct 15, 2019
FY20 SOF 22 STS Operations Facility at JBLM WA
- 11×SolicitationCurrentDec 13, 2019
FY20 SOF 22 STS Operations Facility at JBLM WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912DW20R0001
Archive Date
Feb 15, 2020
Office Address
SEATTLE, WA, 98134-2329