GovChime
Notice ID: 13325831b8d44d58be1a1234177dd99dSolicitation

FY20 SOF 22 STS Operations Facility at JBLM WA

Archived on February 15, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−08:00
Posted
January 28, 2020
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST SEATTLE
Place of performance
Joint Base Lewis McChord, Tacoma
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912DW20R0001
Notice ID
13325831b8d44d58be1a1234177dd99d

Description

The USACE Seattle District has a requirement for the construction of a combined 85,000 Square Footage (SF), squadron operations building and eight-story parachute drying tower, 12,000 SF covered storage area, and 60,300 SF of demolition for five buildings/structures at JBLM near Lakewood, WA. The squadron operations facility is located within the McChord Field Area Development Plan. The project will consist of construction of a new multibuilding, Special Tactics Squadron (STS) operations compound. Facilities shall have foundations and floor slabs, structural framing, insulated walls and roofs, environmental control (heating, ventilation, and air conditioning), fire detection and suppression, etc. Squadron operations functional areas include: operations with secure planning, logistics, medical, team rooms, simulator room, classroom, associated staff offices, vehicle maintenance shop, storage and staging areas, pre-engineered metal building, antenna farm, radio maintenance, armory, elevator, bathrooms, Aircrew Flight Equipment (AFE) shop, etc. Parachute drying tower is integrated with operations AFE shop and climbing wall. All buildings’ supporting facilities include utilities and connections, parking (approximately 150 spaces), information systems, communications with information transfer node (ITN) site development, cyber security measures lighting, paving, walks, curbs, and gutters, landscaping and signage are all inclusive to the project. Special site conditions include potential for asbestos removal during demolition. Special site conditions also includes requirement for multiple retaining walls and storm water runoff control to accommodate significant grade changes on the site IAW JBLM’s MS4 permit requirements and project site is adjacent to a flight line. Coordination with public and private utility contractors required. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with Department of Defense (DoD) Minimum Anti-Terrorism Standards for Buildings. See attached Request for Proposal (RFP) and attachments

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

JOHN SCOLA
CONTRACT SPECIALIST

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DW20R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationOct 15, 2019

    FY20 SOF 22 STS Operations Facility at JBLM WA

    Notice 958490d8a036411389e70fc96dbca6f9 on SAM.gov

  2. 11×
    SolicitationCurrentDec 13, 2019

    FY20 SOF 22 STS Operations Facility at JBLM WA

    Notice 13325831b8d44d58be1a1234177dd99d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DW20R0001

Archive Date

Feb 15, 2020

Office Address

SEATTLE, WA, 98134-2329