Notice ID: 730da9c7a88a478e9e514f8db00199acAward NoticeAwarded
Construct Retail Fuel Facility (Lewis Main) at Joint Base Lewis-McChord, WA
Awarded on September 30, 2021. Full description on SAM.gov.
Awarded tounder W912DW21C0022 (source: SAM.gov award notice)• $10.4M
Overview
- Posted
- October 1, 2021
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of War
Notice details
- Place of performance
- Dupont, WA, 98327
- Last updated
- Dec 4, 2025
- Award date
- Sep 30, 2021
- Award amount (SAM.gov award notice)
- $10.4M
Identifiers
- Solicitation number
- W912DW21R0023
- Notice ID
- 730da9c7a88a478e9e514f8db00199ac
- Award number (PIID)
- W912DW21C0022
Description
Construct Retail Fuel Facility (Lewis Main) at Joint Base Lewis-McChord, WA
Award Overview
Award Number
W912DW21C0022
Award Amount (SAM.gov award notice)
$10.4M
Award Date
Sep 30, 2021
Awardee
Awardee UEI
MMBHJL3CJ9S5
Original Solicitation
Notice ID: 730da9c7a88a478e9e514f8db00199ac
Posted Date: Oct 1, 2021
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $10.0MSigned Dec 10, 2024
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DW21R0023- Awarded
This opportunity has been awarded.
- AwardedCurrentOct 1, 2021
Construct Retail Fuel Facility (Lewis Main) at Joint Base Lewis-McChord, WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection. | 76% | Solicitation | 10/20/2026 |
This is a pre-solicitation notice to all certified, interested 8(a) Small Business Development Program Participants for the proposed Firm-Fixed-Price (FFP) competitive acquisition under solicitation W9128F27RA012 - API 653 Fuel Tank Repairs and Maintenance ? Eielson AFB, Alaska, as outlined herein. The U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Proposal (RFP) on/or about October ? November 2026. The Primary North American Industry Classification System (NAICS) code for the solicitation is 237120 ? Oil and Gas Pipeline and Related Structures Construction, with a size standard of $45.0 Million. This acquisition includes the repair and maintenance of five vertical aboveground fuel storage tanks located at Eielson AFB in Fairbanks, Alaska. The attached DRAFT Scope of Work (SOW) details the scope of the requirement to be executed in accordance with the terms of the proposed contract. Please see the Pre-Solicitation Notice document for more information. | 69% | Pre-Solicitation | Open |
This is a Sources Sought Notice for informational/market research purposes. This notice is to gather information on the interest, capabilities, and qualifications of businesses in the industry. The intent is to procure construction services to provide repair and maintenance of five vertical aboveground storage tanks at Eielson AFB, AK. Due to the nature and location, the construction season is generally limited to the timeframe of May through September. The work will be phased over two construction seasons. | 69% | Market Research | 07/10/2026 |
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks. | 68% | Solicitation | 01/25/2027 |
*24 September 2026: This amendment publishes a change in the Scope of Work and updated CLIN Schedule due to funding. Updated proposals are due on 30 September 2026, no later than 02:00 PM CDT._______________________*...... *8 September 2026: This amendment publishes a change in the Scope of Work, provides an additional drawing for the temporary tanks, and extends the due date for the proposal to 22 September 2026. ______________________*.....*21 August 2026: This amendment is to extend the due date for the proposal to 4 September 2026 and post the sign in sheet for the Site Visit._________________* This project includes performing repairs and maintenance to one vertical aboveground storage tank at Los Alamitos AFB, in California. The contractor shall phase their work to minimize disruption to existing fuels operations. The repairs and maintenance items shall be performed to comply with API 653 and all applicable design criteria and standards. | 67% | Solicitation | 09/30/2026 |
Additional Details
Solicitation Number
W912DW21R0023
Archive Date
Oct 15, 2021
Office Address