GovChime
Notice ID: d38eec94df6344ae904b43fe4bbeb90ePresolicitation

Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA.

Archived on December 8, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−08:00
Posted
May 14, 2021
Notice type
Presolicitation
NAICS
238290: Other Building Equipment Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST SEATTLE
Place of performance
Bridgeport, 98813
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912DW21R0033
Notice ID
d38eec94df6344ae904b43fe4bbeb90e

Description

FOR INFORMATION ONLY: This Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Pre-Solicitation notice should be submitted in writing via email to Point of Contact(s) indicated below. Construction Project: Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA. Work includes delivery and installation of a new 50-ton Intake Gantry Crane, modification of the overhead power conductors to include adding a ground conductor, removal of the existing 50-ton intake gantry crane located on the intake deck of the Chief Joseph Powerhouse, delivery and installation of the new 18-ton Tailrace Gantry Crane, installation of a new overhead conductor system for the Tailrace Gantry Crane, and removal of the existing 18-ton tailrace gantry crane located on the tailrace deck of the Chief Joseph Powerhouse. The work to be performed under this project consists of providing the labor, supervision, equipment, materials and expertise to: a. Design, fabricate, deliver, erect, test, and certify a complete new 50-ton Intake Gantry Crane for the Chief Joseph Powerhouse. The crane is comprised of a 50-ton main hoist trolley, 20/10-ton auxiliary hoist trolley, and a 20-ton hammerhead hoist. b. Design, fabricate, deliver, and certify new intake bulkhead and intake gate and hoist lifting beams. c. Perform structural analysis of the existing dead-end supports for the power supply overhead conductor to determine if a fourth grounding conductor can be added to the existing poles. d. Perform structural analysis of the existing gantry crane bumper stops. e. Deconstruct and remove from site the existing intake gantry crane. f. Design, fabricate, deliver, erect, test, and certify a complete new 18-ton Tailrace Gantry Crane for the Chief Joseph Powerhouse. g. Design, fabricate, and install a new wall mounted conductor system on the downstream exterior wall of the powerhouse. h. Design, fabricate, deliver, and certify new draft tube bulkhead lifting beams. i. Deconstruct and remove from site the existing tailrace gantry crane. Work for each crane is expected to be performed in a substantially parallel schedule in order to minimize the duration until the Project is able to place both new cranes into operation. Expected magnitude of construction is between $10 million and $25 million. Solicitation number W912DW21R0033 will be posted to the Beta.Sam.Gov site, on or about 23 Nov 2020. The solicitation will be a Request for Proposals (RFP). Proposals will be due no sooner than 30 calendar days after actual solicitation issuance date. See the solicitation for details about proposal due date. The NAICS code for this procurement is 238290, and the associated small business size standard is $16.5 Million. The solicitation documents for this requirement will be issued in electronic format only and will be made available online via the Beta.Sam.Gov website under the subject solicitation number. NO CD's OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking for any update(s) to the Notice/Solicitation. The Government is not responsible for any loss of Internet connectivity or for a offeror's inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this notice, log in to Beta.Sam.Gov and add the solicitation to your Watchlist. The Response Date listed elsewhere in this pre-solicitation notice is for Beta.Sam.Gov archive purposes only. It may have no relationship to the actual solicitation due date. The solicitation due date and time will be contained in the solicitation and any solicitation amendments that are issued. IMPORTANT NOTICE: All contractors proposing on Department of Defense (DoD) solicitations must be registered in the System for Award Management (SAM) database prior to award of a contract. The purpose of this database is to provide basic business information and capabilities to the Government. The SAM website can be accessed at www.sam.gov. Contractors are encouraged to register as soon as possible. All new contracts can be made ONLY to contractors who are registered in SAM. This requirement applies to all DoD contract awards. Contracting Office Address: Attn: CENWS-CTC PO Box 3755 Seattle, Washington 98124-3755 United States Place of Performance: CHIEF JOSEPH DAM HIGHWAY17 AND PEARL HILL ROAD BRIDGEPORT WA 98813-1120

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DW21R0033
  1. Pre-Solicitation
  2. Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationOct 27, 2020

    Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA.

    Notice 23b934a641424e299b65f7992cadd4d9 on SAM.gov

  2. 6×
    SolicitationDec 10, 2020

    Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA.

    Notice 0bbad1a8cadb40d3a3cef653558719cb on SAM.gov

  3. 2×
    Pre-SolicitationCurrentMay 14, 2021

    Chief Joseph Dam Intake and Tailrace Cranes Replacement, Bridgeport, WA.

    Notice d38eec94df6344ae904b43fe4bbeb90e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0003: See attached amendment and related document for complete details. Amendment 0002: See attached amendment and related document for complete details. Amendment 0001: See attached amendment and related document for complete details. Chief Joseph Dam Station Service Exciters. Project Location: Bridgeport, WA. The solicitation is an unrestricted full and open competitive acquisition. NAICS 237990 Other Heavy and Civil Engineering Construction. Small Business Size Standard $45,000,000. Disclosure of the magnitude of construction project: Between $1,000,000 and $5,000,000. This solicitation is utilizing the Trade-off process procurement method as described in Federal Acquisition Regulation (FAR) Part 15 to award a firm fixed-price (FFP) contract. Please refer to the attached solicitation document, specifications, drawings, and attachments for details.
64%
Solicitation05/07/2026
The response date has been extended to 20 July 2026 at 12:00 p.m. CDT. The Phase I attachment documents have been amended to remove the CUI header and Source Selection Information Footer on the Phase I Attachments. See line-outs. The Site Visit Location address has been amended to:29564 POWERHOUSE RD, WARSAW, MO 65355A Site Visit has been added for Phase I. THE SITE VISIT IS SCHEDULED FOR 30 JUNE 2026 AT 10:00 A.M. CDTLOCATION: 29564 POWERHOUSE RD, WARSAW, MO 6535538.261350, -93.405858POC: HOWARD R. JOHNSON IIIEMAIL: HOWARD.R.JOHNSON@USACE.ARMY.MILTELEPHONE: (816) 938-856Prospective offerors shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnetThe Bidder inquiry date has changed to 7 July 2026, 12:00 PM, local Kansas City time; the system will be unavailable for new inquiries after this date and time.The Proposal date has been extended to 14 July 2026 at 12:00 PM CDT.HARRY S. TRUMAN DAM POWERHOUSE ELEVATOR REPLACEMENT WARSAW, MISSOURIHST Elevator Replacement - Design Build The purpose of this project is to demolish the existing electric traction service elevator at Truman Powerhouse in Warsaw, Missouri and provide and install a new electric traction service elevator, new circuits, and new controls. All equipment/materials provided by the contractor shall be new. The elevator shall be Class C1 with a load rating of 4,500 lbs. or higher. The site visit will be scheduled during Phase 2 of this solicitation. The Government requires performance of the work described in the Statement of Work (SOW), specifications, and drawings. The contract award amount (inclusive of all contract line items (CLINs)) shall not exceed $2,400,000.00 for this project. Offerors are under no obligation to approach this amount.
63%
Solicitation07/20/2026
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT. THE WORK CONSISTS OF: The Contractor shall furnish all necessary materials, equipment, and labor required to construct and commission a new power system for the Dike B Operator unit. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing. The Contractor is responsible for the procurement and installation of a standalone, propane-powered generator and a corresponding propane fuel storage tanks. Following the physical installation, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit and control panel. All work shall comply with all applicable federal laws and codes, and shall be completed in accordance with the Statement of Work. This procurement is set-aside for small business vendors. The applicable NAICS code is 238290 with a Small Business Size Standard of $22 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
57%
Solicitation11/18/2026
Repair Medium Voltage Electrical Loop - Project WKVB179041 Provide all plant, labor, equipment, tools, materials, supervision, and non-personal services necessary to verify active parts of the 13.8 kV medium voltage electrical loop feeder and connect the existing line to the second feed at the transformer supporting Building 395 at Francis S. Gabreski ANGB, NY in strict accordance with the Statement of Work-SOW. An organized site visit has been scheduled for Wednesday, 04 NOV 2026, 10:30 AM (EST) and all parties will meet at the Wing Conference Room, Bldg 345, 150 Old Riverhead Rd., Westhampton Beach, NY 11978. Attendance at the site visit is not mandatory. Attendance at the site visit will be limited to no more than two (2) representatives per company. Please submit the names of your attendees and representing company(s) on the Site Visit attachment and email to: edwin.nunez.3@us.af.mil and conor.riley.2@us.af.mil no later than 1030 AM EST, Tuesday, 03 NOV 2026.Requests for Information (RFIs): Submit all RFIs via email to SARA_MARGARET.LUNA.1@US.AF.MIL and ANTHONY.KIRINCIC@US.AF.MIL with subject line RFIs - Solicitation W50S8E27QA001 - no later than 1030 AM EST, Thursday, 05 NOV 2026.Amendment is to update the dates/times. * There is only amendment 1*Solicitation extended due to late response to RFI.
53%
Solicitation11/10/2026
THIS IS A NEW ACQUISITION FOR AN INTAKE STRUCTURE AND DAM REHAB AT FISHTRAP LAKE IN SHELBIANA, KENTUCKY AS SET FORTH IN THE PLANS AND SPECIFICATIONS TO BE INCLUDED IN THE SCOPE OF WORK.
47%
Solicitation11/20/2026

Additional Details

Solicitation Number

W912DW21R0033

Archive Date

Dec 8, 2020

Office Address

SEATTLE, WA, 98134-2329