GovChime
Notice ID: 0f015bfddae6490fac051737150d591aSolicitation

Chief Joseph Dam Spillway Sump Pump and Controls

Archived on January 23, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−07:00
Posted
January 23, 2023
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W071 ENDIST SEATTLE
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912DW22R0009
Notice ID
0f015bfddae6490fac051737150d591a

Description

Chief Joseph Dam Spillway Sump Pumps and Controls The proposed project will be a competitive, firm-fixed price construction project.Magnitude of Construction is between $1 to $5 millionThe North American Industrial Classification System code is 237990, which has a size standard of $39.5 million.The contract is anticipated to be awarded in First Quarter of 2023.The Seattle District, U.S. Army Corps of Engineers has a requirement to increase the spillway sump pump capacity to keep up with current spillway water intrusion at Chief Joseph Dam, Bridgeport, Washington. To increase the spillway dam sump pump capacity the existing pumps and controls will be removed and replaced along with associated piping and valves. Inflows from previous years indicate that August, September, and October are the optimal months to perform this work as those are generally the lowest inflow periods of the year. The implementation of the proposed project would need to be phased to ensure continuity of drainage. The sump pump system is an important safety system at the CJD as it removes water intrusion from the horizontal and vertical concrete joints in the spillway. Dam structural failure is possible if water intrudes into the monolith concrete joints.The proposed work includes removal and replacement of the following: 1) Two existing Vertical Line-Shaft Vertical Pumps, 2) Six Existing Submersible Pumps, 3) Associated Piping and Valves, 4) Existing Control Equipment with a redundant sensor system and 5) Electrical System components, such as circuit breakers and conductors to serve the new equipment power needs. Additional features of work include: 1) Structural and Concrete Work to include core drilling up to 14 inches and grated walkway replacement, 2) Sump Shaft debris removal and 3) Installation of an Electric Hoist System.The expected construction duration is 18 months. Work restrictions will be in place for this requirement with the intent of ensuring the sump pump capacity is available for continuity of drainage. Construction will need to be staged and scheduled so that USACE dam operations are not impacted.After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://sam.gov/ and https://piee.eb.mil/.In order to download the solicitations and amendments in PIEE, there are 10 general steps a vendor must follow. A complete list can be viewed at the following site:https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5For instructions on how to post an offer, please refer to the Posting Offer demo:https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.It is the Offerors responsibility to monitor the https://sam.gov/ and PIEE at https://piee.eb.mil web sites for amendments to the solicitation. You must be registered with the System Award for Management (SAM) and PIEE, to receive a government contract award. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DW22R0009
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentDec 15, 2022

    Chief Joseph Dam Spillway Sump Pump and Controls

    Notice 0f015bfddae6490fac051737150d591a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912DW22R0009

Archive Date

Jan 23, 2024

Office Address

SEATTLE, WA, 98134-2329