Notice ID: 9f8eae3029114e6190f2ed51bed3b837Award NoticeAwarded
DLA-Barstow Disposition Warehouse Project
Awarded on July 11, 2023. Full description on SAM.gov.
Awarded tounder W912DW23C0013 (source: SAM.gov award notice)• $25.5M
Overview
- Posted
- July 13, 2023
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Barstow, CA, 92311
- Last updated
- Dec 4, 2025
- Award date
- Jul 11, 2023
- Award amount (SAM.gov award notice)
- $25.5M
Identifiers
- Solicitation number
- W912DW23R0007
- Notice ID
- 9f8eae3029114e6190f2ed51bed3b837
- Award number (PIID)
- W912DW23C0013
Description
The U.S. Army Corps of Engineers (USACE) Seattle District has a requirement to renovate an existing warehouse used for material disposition for the Department of Defense at Barstow, CA. The project intends to repair, renovate, and install equipment at Warehouse 14 located at Marine Corps Logistics Base Barstow, California. The warehouse was constructed in the 1940s and is a redwood framed structure. The general scope includes installing warehouse support equipment, replacing associated utility infrastructure, and revamping truck receiving/transportation flow. The specific scope includes, but is not limited to:1) Demolish and remove all existing items within the warehouse (lighting, pallet racks, fire alarm, electrical). 2) Repair and diamond polish slabs and concrete joints, interior support structure, and paint walls. 3) Construct warehouse items (i.e., electrical service, lighting, fire alarm, security cameras, warehouse equipment and pallet racking and security cage systems, HVAC, offices, restrooms, loading docks, and roof repair). 4) Traffic control and monitoring systems (traffic lights, proximity sensors and CT intersection camera, powered entry/exit gates, exterior CONEX office, Radiation Detection Monitor, Truck Scale, and over-head canopy structure). 5) Construct 50-foot span single lane vehicle bridge between the truck inspection area to the warehouse facility. Please visit the following: *Visit https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DW23R0007 to obtain more details.* Amendment 0003 -1. 07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFINGChanges: Revised paragraph 1.1, 1.3, 2.1.1. 2. 01 33 00-A SUBMITTAL REGISTERChanges: Added ?Cool Roof? submittal from Thermal Moisture Specification section 07 52 00 Page 28 of 103.3. 12 50 00.13 10-A FURNITURE AND FURNITURE INSTALLATIONChanges: Add Furniture Design and Product Data Attachment 12 50 00.13 10-A. 4. I-604 INTERIOR SCHEDULESChanges: Revised Carpet Tile Manufacture in Revision 2. 5. 00 73 00-A INDEX OF DRAWINGSChanges: Added Revision number 2 to Plate Number I-601 INTERIOR SCHEDULE. 6. RFP change page 24 and 25.
Award Overview
Award Number
W912DW23C0013
Award Amount (SAM.gov award notice)
$25.5M
Award Date
Jul 11, 2023
Awardee
Awardee UEI
WS1FVH27LE48
Awardee CAGE Code
87VM9
Original Solicitation
Notice ID: 9f8eae3029114e6190f2ed51bed3b837
Posted Date: Jul 13, 2023
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $43.0MSigned Jul 23, 2026
- $43.0MSigned Oct 6, 2025
- $43.0MSigned Sep 12, 2025
- $15.2MSigned Jul 31, 2025
- $15.1MSigned Apr 9, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912DW23R0007- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationNov 4, 2022
DLA-Barstow Disposition Warehouse Project, Barstow , CA
- 6×SolicitationDec 16, 2022
DLA-Barstow Disposition Warehouse Project
- AwardedCurrentJul 13, 2023
DLA-Barstow Disposition Warehouse Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE) Europe District is planning a requirement for a firm-fixed-price, design-bid-build construction contract to build a new Deployable Airbase System (DABS) with facilities, vehicles, and equipment (FEV) in Rygge, Norway. The project’s anticipated magnitude of construction is between $50,000,000.00 and $125,000,000.00 with a construction duration of 830 calendar days from issuance of the Notice to Proceed (around March of 2028). This procurement is an unrestricted (full-and-open competition) Request for Proposal (RFP) using Federal Acquisition Regulation (FAR) Part 36 and FAR Part 15 with the Tradeoff source selection process. An official RFP is anticipated to be posted here through the Procurement Integrated Enterprise Environment (PIEE) website on or around February 1, 2027, and a site-visit is tentatively scheduled for the end of February. Interested offerors must be registered in PIEE to submit a proposal. The attached files are draft planning information only and are subject to change. The final solicitation package will control. Any solicitation issued resulting from this notice will be in a separate announcement. A company must be registered and active in SAM to be considered for contract award. Further instructions and information can be found at https://sam.gov/content/entity-registration. | 66% | Pre-Solicitation | 01/29/2027 |
PROJECT TITLE: AK ANG BASE SUPPLY COMPLEX, JBER, ALASKAPROJECT LOCATION: JOINT BASE ELMENDORF RICHARDSON (JBER)ALASKA AIR NATIONAL GUARD SUPPLY COMPLEX, A 52,000 SF HIGH-BAY SUPPLY COMPLEX AND ASSOCIATED 5,600 SF MANAGEMENT SUPPORT ADMINISTRATIVEFACILITY THAT SUPPORTS TRAINING, ADMINISTRATIVE, AND LOGISTICAL REQUIREMENTS FOR THE AKARNG. *********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS: Bethel Contracting, LLC Bristol Design Building Services, LLC GHEMM Solutions, LLC AM-0002 to release Phase 2 of this Solicitation is available ONLY to the Offerors selected to participate in Phase 2. *********************************************************************** | 66% | Solicitation | 04/10/2026 |
Update 0005 is to issue Amendment 0004. // Update 0004 is to issue Amendment 0003. // Update 0003 is to issue Amendment 0002. // Update 0002 is to issue Amendment 0001 // Update 0001 is to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module. | 66% | Solicitation | 07/08/2026 |
**This notice ID: W9126G26RA019 is being issued to correct a clerical error and is replacing notice ID: W912626RA019.** // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. See attached Pre-Solicitation Notice for details. | 66% | Pre-Solicitation | Open |
09-Nov-2026: Posting Amendment 0004. Offer due date extended to 24 Nov 2026, 3:30 PM HST. Updating water and electricity utility charge rates in solicitation. Incorporating Questions and Answers to the plans and specifications. Incorporating project KNMD209085 and KNMD209086, drawings and specifications Addendum A.____26-Oct-2026: Posting Amendment 0003, Questions and partial answers to the plans and specifications. Additional answers once received to questions related to the plans and specifications will be incorporated in a future amendment. ____21-Oct-2026: Posting Amendment 0002. Extending the offer due date to 12 Nov 2026, 10:00 AM HST. Incorporating new wage determination, questions and answers to the solicitation, and questions and partial answers to the plans and specifications. Additional answers once received to questions related to the plans and specifications will be incorporated in a future amendment. ____07-Oct-2026: Posting Amendment 0001, preproposal conference slides and sign-in attendance sheet in PIEE/Solicitation Module. The purpose of Amendment 0001 is to change Questions due NLT 16 Oct 2026, 5:00 PM HST, and the offer due date to 30 Oct 2026, 3:30 PM HST. ____23-Sep-2026: This is a Solicitation Notice, Request for Proposal. Single Project RFP Set-Aside for Small Businesses NAICS Code: 236220 - Commercial and Institutional Building Construction. The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of KNMD209085 Munitions Maintenance and Inspection Facility and KNMD209086 Conventional Munitions Cube Storage Addition located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. These projects will be concurrent. KNMD209085 Munitions Maintenance and Inspection Facility - Construct a new Munitions Maintenance and Inspections facility by utilizing conventional design and construction methods to accommodate the facility mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project - Adjustment of Dollar Limitations for Location pursuant to 10 USC Section 2805. Project square footage is estimated at 2,400 SF. Work covered in this project includes but is not limited to: Micro-pile Foundations: Specialized foundation engineering featuring micro-piles to mitigate challenging soil conditions and ensure seismic structural integrity. Cast-in-Place Concrete: Constructing robust concrete slab-on-grade, concrete walls, capping beams, and associated structural masonry elements. Structural Framing and Enclosure: Utilizing cold-formed metal framing, insulated metal wall panels, and structural steel support systems. Roofing: Installation of high-performance standing seam metal roofing, complete with prefinished gutters, downspouts, and weather barrier wraps. Specialized Systems: Installation of mechanical HVAC systems (including specialized 20-ton air conditioning systems), interior plumbing, lightning/grounding protection, and communication infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler suppression system. In addition to the base work described above, the solicitation will include the following option line items: 1. MAC Pad - Construct 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility maintenance bays. KNMD209086 Conventional Munitions Cube Storage Addition - Construct an addition to the Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project - Adjustment of Dollar Limitations for Location pursuant to 10 USC Section 2805. Project square footage is estimated at 1,320 SF. Work covered in this project includes but is not limited to: Substructure and Enclosure: Micro-pile foundations, concrete wall structures, cast-in-place concrete slabs, and 12 in. thick concrete walls designed for high-hazard storage specifications. Framing and Roofing: Structural steel framing, roof joists, and standing seam metal roofing matching existing facility standards. Exterior Elements: Erection of new asphalt pavement adjacent to the existing facility access to provide adequate logistics and material handling access around the new facility addition. Specialized Protection: Maintenance facility lightning and grounding protection systems, along with integrated fire detection and alarm reporting systems connected back to the base reporting system. APPLICABLE TO BOTH PROJECTS: RAB Lighting exterior wall packs and area lights are sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation). Project Phasing and Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings. Escort Requirements: Escort personnel shall be required when erecting the temporary security fence, performing work occurring outside the temporary security fence, and connecting utilities to the existing system. Secured Zone Access: Once the temporary security fencing is approved and accepted by the Contracting Officers Representative (COR), no escort shall be required within the active secured work zone during construction, allowing the contractor to work within the secured boundary unimpeded. The magnitude of construction is between $10,000,000 and $25,000,000 total. KNMD209085 Munitions Maintenance and Inspection Facility project duration will be 733 calendar days after notice to proceed to include inspection and punch list. KNMD209086 Conventional Munitions Cube Storage Addition project duration will be 456 calendar days after notice to proceed to include inspection and punch list. This action is being solicited as a set-aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000. A pre-proposal conference is scheduled 01 October 2026, 08:00 am local time, location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the preproposal conference. All questions for the pre-bid conference must be submitted by 28 September via email to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil. The solicitation closing date is 28 October 2026. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with the Source Selection Procedures described in FAR 15.2, DFARS 215.2, and AFARS 5115.2. Evaluation factors include Technical Capability, Past Performance and Price. The Government intends to award a contract without conducting discussions. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov. The solicitation and associated information will be posted within Procurement Integrated Enterprise Environment (PIEE) Solicitation Module and subsequently uploaded into the Contract Opportunities page at SAM.gov. Per the solicitation requirements, Offerors are required to submit their proposals through the vendor portal for solicitations within the PIEE platform. A Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module. A PIEE Solicitation Module Vendor Access Instructions is attached. If your company is new to PIEE and has no Account Administrator, the link below provides the general steps in getting started as a vendor to use the PIEE Solicitation Module and other PIEE applications: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. This solicitation is not an invitation for bids and there will not be a formal public bid opening. All inquiries must be in writing, preferably via email to the persons specified in the solicitation. All answers will be provided in writing via posting to SAM.gov. If you have any questions concerning this procurement you are encouraged to email your questions to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states -By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractors 85 percent subcontract amount that cannot be exceeded-. In accordance with RFO FAR 36.101-4, the following information is provided: (a) There are no agency-specific policies or procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. (b) No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. DISCLAIMER: The official plans and specifications are located on the official Government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the documents posted on the referenced web pages. The Government will not issue paper copies. | 59% | Solicitation | 11/24/2026 |
Additional Details
Solicitation Number
W912DW23R0007
Archive Date
Jul 26, 2023
Office Address
SEATTLE, WA, 98134-2329