Notice ID: 6dd823c8a0d340f39060e6a890887411Solicitation
W912DY26RA032
Archived on March 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM UTC−06:00
- Posted
- February 17, 2026
- Notice type
- Solicitation
- Set-aside
- Women-Owned Small Business
- NAICS
- 541330: Engineering Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
- Place of performance
- 94304
- PSC
- F999: OTHER ENVIRONMENTAL SERVICES
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- W912DY26RA032
- Notice ID
- 6dd823c8a0d340f39060e6a890887411
Description
The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912DY26RA032- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×
Similar Opportunities
Additional Details
Solicitation Number
W912DY26RA032
Archive Date
Mar 5, 2026
Office Address
REDSTONE ARSENAL, AL, 35898-0000