GovChime
Notice ID: 6dd823c8a0d340f39060e6a890887411Solicitation

W912DY26RA032

Archived on March 5, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
9:00 AM UTC−06:00
Posted
February 17, 2026
Notice type
Solicitation
Set-aside
Women-Owned Small Business
NAICS
541330: Engineering Services
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
Place of performance
94304
PSC
F999: OTHER ENVIRONMENTAL SERVICES
Last updated
Aug 21, 2026

Identifiers

Solicitation number
W912DY26RA032
Notice ID
6dd823c8a0d340f39060e6a890887411

Description

The Veteran?s Administration has tasked the US Army Corps of Engineers Engineering and Support Center, Huntsville to initiate a Facility Reduction requirement at their Veteran?s Medical Center facility in Palo Alto, California. One building is considered excess to the center?s needs. The purpose of this contract is to procure Pre-demolition surveys according to the requirements set forth in this Performance Work Statement (PWS).The objective is to plan and complete the environmental sampling of a facility at the installation. The structure of concern is Building 54. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within 35 workdays following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within 15 workdays following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.Refer to the PWS and attached documents for requirement specifics.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912DY26RA032
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    SolicitationCurrentJan 28, 2026

    W912DY26RA032

    Notice 6dd823c8a0d340f39060e6a890887411 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912DY26RA032

Archive Date

Mar 5, 2026

Office Address

REDSTONE ARSENAL, AL, 35898-0000