Notice ID: 9bca004ae36d42bd979bf1c9e752b3f7Award NoticeAwarded
Lower Snake River Navigation Lock Tainter Valve System Upgrades
Awarded on September 23, 2024. Full description on SAM.gov.
Awarded tounder W912EF24C0012 (source: SAM.gov award notice)• $56.8M
Overview
- Posted
- October 1, 2024
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY ENGINEER DISTRICT WALLA WAL
- Place of performance
- Walla Walla, WA, 99362
- Last updated
- Dec 4, 2025
- Award date
- Sep 23, 2024
- Award amount (SAM.gov award notice)
- $56.8M
Identifiers
- Solicitation number
- W912EF24R0010
- Notice ID
- 9bca004ae36d42bd979bf1c9e752b3f7
- Award number (PIID)
- W912EF24C0012
Description
The US Army corps of Engineers, Walla Walla District is planning to award a Hybrid Construction with Supply project entitled Lower Snake River Navigation Lock Tainter Valve System Upgrades. The work is located at the Ice Harbor Project (HLD) in Burbank Washington; Lower Monumental Project (LMA) in Kahlotus, Washington; Little Goose Project (LGA) in Starbuck, Washington; and Lower Granite Project (LLA) in Pomeroy, Washington. The North American Industry Classification System (NAICS) code for this project is 237990-Other Heavy and Civil Engineering Construction with $45,00,000 in annual receipts. The scope of work includes replacing four culvert valve bodies with new valves (four at each site, sixteen total) at HLD, LMA, LGA and LLA. This will be a firm-fixed-price hybrid construction with supply contract. The construction portion has an estimated magnitude of the construction between $10,000,000 and $25,000,000. Performance and payment bonds will be required for the construction portion of the contract only. The tainter valves are located in the navigation lock at the referenced projects, inside the fill/drain culverts, at varying depths below the spillway deck. The main access is down the valve shaft via crane and basket. The tainter valves have an approximate size of 15 feet tall, 12 feet wide, and 19.5 foot in radius. The weight of each tainter valve is approximately 54,000 lbs. This project also includes the replacement of the associated mechanical equipment, including linkages, hydraulic cylinders, and hydraulic power units. The trunnion yokes, pins, bushing, and keeper plates shall also be replaced. The electrical systems will also be updated, which includes power and control for each of the valves. The work described herein involves the repair of four tainter valves and associated operating assemblies at each of the above referenced locks and dams. The contractor or their subcontractor who will be responsible for fabrication shall be certified under American Institute Steel Construction (AISC) quality certification program with one of the following certifications: Major Bridge Fabricator (CBR), Certified Bridge Fabricator Advanced (ABR), Certified Bridge Fabricator Intermediate (IBR), or Certified Hydraulic Fabricator (HYD). In addition to the above required certifications, the fabricator shall be certified with the Fracture Critical Endorsement (F). There are three major actions included in this contract scope of work: 1. Fabrication of the replacement parts 2. Removal of the existing equipment 3. Installation of the replacement equipment Only one pair of the tainter valves will be replaced at a time at each project, such that the other pair of valves on the project will remain fully operational to allow normal navigation movement through the lock. HLD-LMA-LGA-LLA Tainter Valves Combined Requirements Summary Scope of Work: Replace tainter valve trunnions for each replaced valve, including the bases, pins, bushings, anchor bolts and epoxy backing Rehabilitate the stainless-steel sealing surfaces in the culverts by performing weld repair and machining. Replace the lifting eyes for each tainter valve. Replace the entire linage assembly that connects each valve with its hydraulic operating cylinder. This includes the connecting rod and pin assemblies, crosshead assemblies, push rods and push rod guides. Replace both hydraulic operating cylinders. Replace the hydraulic power unit (HPU) for each tainter valve. This includes the motor, pump, tank and associated piping connections to the operating cylinder and electrical controls. Replace electrical components including the motor cables, thermal overloads, motor starter and circuit breaker, transformer, auxiliary relay, pressure and temperature switch, and time delay relays. Provide commissioning services to test the entire tainter valve system to verify satisfactory installation and operation. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) The contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the contractor will be required to develop and submit for Government acceptance, and Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that complies with EM 385-1-1. A site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor 385-1-1s on-site operations. The SSHO shall possess a minimum of 5-years experience in construction safety on similar projects, shall have completed the 30-hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years. A qualified Fall Protection Competent Person shall be provided by the contractor for each shift of the contractors on-site operations that involves work that exposes workers to fall hazards. This contract will require the contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. The contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractors operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled Construction Quality Management for Contractors within the last 5-years. The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award. The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of Record Drawings to the customer. ATTACHED IS AMENDMENT 0001 ATTACHED IS AMENDMENT 0002 ATTACHED IS AMENDMENT 0003 ATTACHED IS AMENDMENT 0004 ATTACHED IS AMENDMENT 0005 ATTACHED IS AMENDMENT 0006 ATTACHED IS AMENDMENT 0007
Award Overview
Award Number
W912EF24C0012
Award Amount (SAM.gov award notice)
$56.8M
Award Date
Sep 23, 2024
Awardee
Awardee UEI
S6HKH3KV35N3
Original Solicitation
Notice ID: 9bca004ae36d42bd979bf1c9e752b3f7
Posted Date: Oct 1, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $83.2MSigned Jul 8, 2026
- $83.2MSigned Jun 4, 2026
- $83.2MSigned May 14, 2026
- $83.2MSigned Apr 9, 2026
- $83.0MSigned Mar 19, 2026
Contacts
Documents
Select documents to download
Showing 10 of 46 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - | |||
| Solicitation | DEPT OF THE ARMY | Oct 1, 2024 | - |
Showing 1 to 10 of 46 results
Lifecycle
Solicitation:
W912EF24R0010- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 2×Pre-SolicitationJul 17, 2024
Lower Snake River Navigation Lock Tainter Valve System Upgrades
- 12×SolicitationJul 31, 2024
Lower Snake River Navigation Lock Tainter Valve System Upgrades
- AwardedCurrentOct 1, 2024
Lower Snake River Navigation Lock Tainter Valve System Upgrades
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0002 - See attached Amendment 0002 - The purpose of this amendment is to incorporate clauses that were unintentionally removed by the Army Contract Writing System and to extend the bid submission date by 11 days from 11:00 A.M. Pacific on 19-NOV-2026 to 11:00 A.M. Pacific on 30-NOV-2026; the bid opening will occur at 1:00 P.M. on the date bids are due. Amendment 0001 - See attached Amendment 0001 and updated solicitation notice below for all details regarding the site visit date and link up location changes: The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This solicitation announcement is for the repair and rehabilitation of two Tainter Valves (TV3 and TV4) at the John Day Lock and Dam (JDA). See the attached Solicitation, which includes the Specifications, and the attached Planset for all details. Because a similar requirement at The Dalles Lock and Dam will be solicited after this solicitation, the Government will host the following two site visits on Tuesday, 03 November 2026: 1. 9:00 A.M. @ John Day Dam (Oregon side), Exit 109 from I-84, John Day Dam Rd, Rufus, OR 97050. Check in with security at the front gate and then proceed to the parking lot across the road from the construction trailer; see the link up location map in the solicitation amendment notice. 2. 2:00 P.M. @ The Dalles Dam (Washington side), Lyle, WA 98635. Take US-197N and exit towards The Dalles Dam Boat Launch and park on the left hand side of the road immediately after turning left 90 degrees towards the Boat Launch; see the link up location map in the solicitation amendment notice. Contractors will be able to see a removed Tainter Valve at The Dalles Dam. Send an email to Andrew Sprys and Justin Figueredo by 11:00 A.M. on Wednesday, 28 October 2026, with the following information to register for the site visits: Solicitation Number: W9127N27BA009, Project Title: JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4, Name(s) of individual(s) attending site visit, Name of Company, Phone Number, Email Address, Are all individuals U.S. Citizens? Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, Personal Protective and Safety Equipment. It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. Site visit attendees must be U.S. citizens and possess a REAL ID to access the sites. Any subsequent visits will require prearrangement with the Contracting Division personnel listed above and may not be guaranteed/approved. Acceptable forms of proof of citizenship for anyone born outside the USA is: 1. US Birth Certificate: Must be certified and issued by either a US State or the US State Department. 2. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. 3. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. 4. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. 5. Consular Report of Birth Abroad: Issued by the US State Department. 6. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. 7. Enhanced Drivers License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: 1. Real ID drivers license. 2. Enhanced drivers license. 3. Federal Identification Cards PIC/CAC/PIV/Etc. 4. Transportation Worker Identification Card (TWIC). 5. United States Passport or United States Passport Card. 6. Drivers license issued by the Department of State. Magnitude of Construction: The estimated cost of the project is between $1,000,000 to $5,000,000. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE RESPONSE DATE AND TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS. | 92% | Solicitation | 11/30/2026 |
The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This solicitation announcement is for the repair and rehabilitation of one Tainter Valve (TV1) at The Dalles Lock and Dam (TDA). See the attached Solicitation, which includes the Specifications, and the attached Plan set for all details. The following site visit on Tuesday, 03 November 2026: 2:00 P.M. @ The Dalles Dam (Washington side), Lyle, WA 98635. Take US-197N and exit towards The Dalles Dam Boat Launch and park on the left hand side of the road immediately after turning left 90 degrees towards the Boat Launch; see the attached link up location map. Contractors will be able to see a removed Tainter Valve at The Dalles Dam. Send an email to Andrew Sprys and Justin Figueredo by 11:00 A.M. on Thursday, 29 October 2026, with the following information to register for the site visit: Solicitation Number: W9127N27BA010, Project Title: THE DALLES DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV1, Name(s) of individual(s) attending site visit, Name of Company, Phone Number, Email Address, Are all individuals U.S. Citizens? Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, Personal Protective and Safety Equipment. It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. Site visit attendees must be U.S. citizens and possess a REAL ID to access the sites. Any subsequent visits will require prearrangement with the Contracting Division personnel listed above and may not be guaranteed/approved. Acceptable forms of proof of citizenship for anyone born outside the USA is: 1. US Birth Certificate: Must be certified and issued by either a US State or the US State Department. 2. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. 3. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. 4. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. 5. Consular Report of Birth Abroad: Issued by the US State Department. 6. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. 7. Enhanced Drivers License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: 1. Real ID drivers license. 2. Enhanced drivers license. 3. Federal Identification Cards PIC/CAC/PIV/Etc. 4. Transportation Worker Identification Card (TWIC). 5. United States Passport or United States Passport Card. 6. Drivers license issued by the Department of State. Magnitude of Construction: The estimated cost of the project is between $1,000,000 to $5,000,000. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE RESPONSE DATE AND TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS. | 92% | Solicitation | 11/30/2026 |
Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles must be installed inside three existing and one new 1-story control shelter at locations specified in the contract drawings. The control shelter must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contractdrawings.New buckets and supporting equipment must be installed inside existing motor control centers (MCCs). New hardware and power and control cabling must be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe. A geotechnical and civil site analysis must be completed to confirm the structural integrity of all foundations for all new project components and to confirm proper drainage. Minimal new steel grating must be required for placement over top new concrete utility trenches. All new hydraulic and controls equipment must be tested and commissioned prior to project handoff. This project is to be completed at a locks and dam site along the Ohio River and thus requires the use of a floating work plant and work boat(s) for construction. Also, all as-built drawings must be stamped by a registered PE.The work shall be completed within 730 after written Notice to Proceed.The acquisition will be procured as 100% Set-Aside for Small Business. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Offerors are encouraged to participate. The Request for Proposal (RFP) will be issued on or about 18 June 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored.The North American Industrial Classification System (NAICS) Code for this acquisition is 237990 - 0ther Heavy and Civil Engineering Construction.The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit an Offer on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) RegistrationRegistering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select Get Started button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance. 30 June 2026 - Amendment 0001 issued. 23 July 2026 - Amendment 0002 Issued 31 July 2026 - Amendment 0003 issued. 13 August 2026 - Amendment 0004 issued. | 91% | Solicitation | 08/20/2026 |
Northwest Division Powerhouse Life Safety Upgrades Stage 1 The U.S. Army Corps of Engineers (USACE), Walla Walla District, intends to issue a single-phase solicitation on or about 30 November 2026 for a Construction Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple-Award Task Order Contract (MATOC). The anticipated MATOC will provide construction services for renovation and upgrade projects at hydroelectric powerhouses located at large, remote civil works projects within the Northwestern Division. The primary area of performance is anticipated to include USACE Walla Walla District projects at McNary, Ice Harbor, Lower Monumental, Little Goose, Lower Granite, and Dworshak. Task orders may also include work at other USACE projects within the Pacific Northwest, including locations within the Seattle and Portland Districts in Washington, Oregon, Idaho, and Montana. The U.S. Army Corps of Engineers, Walla Walla District, anticipates awarding up to four (4) IDIQ MATOCs. At least one, and up to two, MATOCs will be reserved for award to qualified small business concerns. Task orders issued under the MATOCs will be firm-fixed-price. The aggregate shared contract capacity for all awarded MATOCs is anticipated to be $99 million. Each contract is anticipated to include a 36-month base period and two (2) 24-month option periods, exercisable at the Governments discretion. The Government may issue individual task orders with values up to $25,000,000. The Government reserves the right to issue additional solicitations and award additional contracts for the same or similar work within the geographic area covered by the MATOCs. The applicable North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction. This notice is for informational purposes only and is not a solicitation. The solicitation is anticipated to be issued on or about 30 November 2026. Summary Scope of Work: The purpose of this IDIQ MATOC is to provide construction services to renovate and upgrade life-safety systems at large hydroelectric powerhouses located at large, remote civil works projects. These powerhouses may range in size from 75,000 square feet to 420,000 square feet and from 5 stories to 11 stories. The work may consist of the following major industrial construction elements for installation and/or modification: 1. Fire detection and mass notification alarm systems 2. Wet pipe, fine water mist, and clean agent sprinkler fire suppression system(s) 3. Smoke control system, including stair pressurization fans, smoke exhaust fans, motorized fire-smoke dampers, and complex logic and programming matrix digital controls 4. HVAC direct digital controls 5. HVAC ventilation and conditioning equipment, dampers, and ductwork 6. Fabricated steel stairs and guardrails 7. Architectural fire barrier walls, fire doors, safety glazing and finishes 8. Firestopping 9. Emergency and exit lighting systems 10. Electrical power supply and distribution 11. Precast concrete 12. Low-slope roofing 13. Specific aspects of this project that may be especially challenging include: a. Robust industrial safety protocols with rigorous lockout tagout procedures b. Construction in a continuously operating industrial environment c. Proximity to high voltage equipment and transmission lines d. Multiple underground levels with limited access e. Fire alarm designers and installers must be NICET Level III or IV certified f. Work in ceilings up to 60 feet high The project will involve the development and management of Contractor furnished submittals for items such as shop drawings, product data, commissioning plans, and contract close-out documentation as required by technical specifications of the task orders. Miscellaneous work within the project includes the delivery of Record Drawings. Placement of Task Orders. The actual amount of work to be performed and the time of such performance will be determined by a Contracting Officer who will issue written task orders. Prices will be requested and evaluated for each task order in accordance with FAR 16.505. The Government will evaluate price and past performance at a minimum but may include additional non-price factors. Each RFP will state the method of selection and any additional non-price factors. Whenever possible, award will be made without discussions. If discussions are required, each contractor included in the competitive range will be requested to provide a final proposal revision, unless eliminated from discussions. Important Note: The sam.gov response date listed elsewhere in this synopsis is for the sam.gov archive purposes only. It has no relationship to the actual proposal submission date. The proposal submission date will be contained in the solicitation and any solicitation amendments that are issued. When issued, the solicitation documents for this project will be available via sam.gov. No CDs OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the reference page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to sam.gov and add the solicitation to your watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on sam.gov. | 75% | Pre-Solicitation | 01/08/2027 |
Webbers Falls Excitation System Replacements, Webbers Falls, Oklahoma. *AM0001 - This Amendment provides pre-proposal site visit information, please review the attachment for details. *AM0002 - This Amendment provides specification, plans, and drawings updates resulting from answered Bidder Inquiries. A proposal due date extension has also been granted. Please review all attachments for full details. *AM0003 - This Amendment is to provide a revised specification sections and changes the Wage Determinations for this project. Please review all the attachments for full details. | 74% | Solicitation | 11/05/2026 |
Additional Details
Solicitation Number
W912EF24R0010
Archive Date
Oct 15, 2024
Office Address
WALLA WALLA, WA, 99362-1876