Notice ID: fe3db16469ac44b9823f497ea0485958Award NoticeAwarded
NESP Central Mooring Facilities/Cells Lock and Dam 14 & 15
Awarded on September 24, 2024. Full description on SAM.gov.
Awarded tounder W912EK24C0040 (source: SAM.gov award notice)• $9.1M
Overview
- Posted
- September 24, 2024
- Notice type
- Award Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ROCK ISLAND
- Place of performance
- i-Wireless Center, Rock Island, IA, 52767
- Last updated
- Oct 7, 2026
- Award date
- Sep 24, 2024
- Award amount (SAM.gov award notice)
- $9.1M
Identifiers
- Solicitation number
- W912EK
- Notice ID
- fe3db16469ac44b9823f497ea0485958
- Award number (PIID)
- W912EK24C0040
Description
The procurment was a total Small Business Set-Aside, was awarded competitively using a firm-fixed prices.
Award Overview
Award Number
W912EK24C0040
Award Amount (SAM.gov award notice)
$9.1M
Award Date
Sep 24, 2024
Awardee
Awardee UEI
GQNPLL9NKHA5
Awardee CAGE Code
7NXL3
Original Solicitation
Notice ID: fe3db16469ac44b9823f497ea0485958
Posted Date: Sep 24, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $2.9MSigned Jul 16, 2025
- $2.9MSigned May 13, 2025
- $2.9MSigned Apr 29, 2025
- $2.9MSigned Mar 6, 2025
- $2.9MSigned Feb 6, 2025
Contacts
Contracting Officer
Primary Contact
Bobbi Boeh
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912EK- Awarded
This opportunity has been awarded.
- 2×Special NoticeMar 22, 2011
Small Business Event - 2011 Midwest Small Business Government Contracting Symposium and Society of American Military Engineers Commanders Briefing
- 15×AwardedCurrentJan 22, 2020
NESP Central Mooring Facilities/Cells Lock and Dam 14 & 15
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details..-------------------- AMENDMENT 0006 provides updates in accordance with the final set of ProjNet Bidder Inquiries and Government Responses. See all attachments for full details. | 86% | Solicitation | 12/09/2026 |
W912P926RA004 - NESP LD25 1200 ft Lock --------- The U.S. Army Corps of Engineers (USACE), St. Louis District, has an upcoming solicitation for constructing a new 1,200 ft Lock for Lock and Dam 25. Lock and Dam 25 is located approximately 61.5 river miles upstream from St. Louis and 241.5 miles above the mouth of the Ohio River. SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. | 86% | Pre-Solicitation | 07/14/2026 |
DRAFT SOLICITATION FOR PUBLIC FEEDBACK -------- Feedback shall be provided via email to NESPLock25Project@usace.army.mil with the subject line: DRAFT Solicitation Feedback - W912P926RA004 - NESP LD25 1200 ft Lock --------- The U.S. Army Corps of Engineers (USACE), St. Louis District, has an upcoming solicitation for constructing a new 1,200 ft Lock for Lock and Dam 25. Lock and Dam 25 is located approximately 61.5 river miles upstream from St. Louis and 241.5 miles above the mouth of the Ohio River. USACE is requesting review and feedback from interested vendors by the response date and time of this notice to be considered prior to the actual solicitation. (NOTE: The instruction to request the Plans is within the Solicitation at the top of the List of Drawing Sheets on page 4.) | 81% | Special Notice | 05/01/2026 |
***Amendment 0006 The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged. ***Amendment 0005 The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets GI002 and CG203. All other terms and conditions remain unchanged. ***Amendment 0004 This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004. ***Amendment 0003 This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003. ***Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026: ***Amendment 0001 This amendment is issued to make administrative updates to the solicitation. ***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. | 80% | Solicitation | 04/24/2026 |
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information. | 80% | Pre-Solicitation | 04/24/2026 |
Additional Details
Solicitation Number
W912EK
Archive Date
Oct 9, 2024
Office Address
ROCK ISLAND, IL, 61299-5001