GovChime
Notice ID: e356ca2b0429a5d24e5ed54578d4c621Award NoticeAwarded

Z--Saylorville Lake; Big Creek, Diversion Dam, Polk County, Iowa - Diversion Dam Control Structure Replacement

Awarded on May 7, 2014. Full description on SAM.gov.

Awarded tounder W912EK-14-C-0057 (source: SAM.gov award notice)• $9.3M

Overview

Posted
May 7, 2014
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

Place of performance
Saylorville Lake NW 78th Ave Johnston IA 50131 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 3, 2025
Award date
May 7, 2014
Award amount (SAM.gov award notice)
$9.3M

Identifiers

Solicitation number
W912EK14R0005
Notice ID
e356ca2b0429a5d24e5ed54578d4c621
Award number (PIID)
W912EK-14-C-0057

Description

AWARD: This is a firm fixed price construction contract. The solicitation was competed as unrestricted. The work shall include, but is not limited to, boring through a section of a concrete filled corrugated metal pipe under water, construction of a sheet pile cofferdam and dew atering, removal of existing gate structure, sluice gate with manual and electrically operated gate operator, bulkhead gate, gratings, construction of a new reinforced concrete control structure which houses a sluice gate and bulkhead gate,construction of a three-girder concrete deck bridge, installation of riprap, removal and replacement of asphalt bike path and all associated incidental work.

Full description on SAM.gov

Award Overview

Award Number

W912EK-14-C-0057

Award Amount (SAM.gov award notice)

$9.3M

Award Date

May 7, 2014

Awardee

Original Solicitation

Notice ID: e356ca2b0429a5d24e5ed54578d4c621

Posted Date: May 7, 2014

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Justine Womboldt, 309-794-5488 USACE District, Rock Island

Documents

No documents available.

Lifecycle

Solicitation:W912EK14R0005
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 6×
    Pre-SolicitationDec 9, 2013

    Z--Saylorville Lake; Big Creek, Diversion Dam, Polk County, Iowa - Diversion Dam Control Structure Replacement

    Notice 7d47b2702abb5ea45fb5c494f2491fbc on SAM.gov

  2. SolicitationMar 12, 2014

    Z--Saylorville Lake; Big Creek, Diversion Dam, Polk County, Iowa - Diversion Dam Control Structure Replacement

    Notice b63b2f52c35f1470ededb9cb03499907 on SAM.gov

  3. AwardedCurrentMay 7, 2014

    Z--Saylorville Lake; Big Creek, Diversion Dam, Polk County, Iowa - Diversion Dam Control Structure Replacement

    Notice e356ca2b0429a5d24e5ed54578d4c621 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EK14R0005

Archive Date

Jun 6, 2014