Notice ID: 8f2a466c04c5361a7f2dfcbed722891dSolicitation
Z--ILLINOIS RIVER BASIN; LOCKPORT POOL; LOCKPORT, IL; LOCKPORT POOL MAJOR REHABILITATION; STAGE IC; FOREBAY WALL
Archived on October 11, 2014. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- July 14, 2014
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Lockport Pool Illinois Waterway - Lockport IL 60441 US
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 3, 2025
Identifiers
- Solicitation number
- W912EK14R0010
- Notice ID
- 8f2a466c04c5361a7f2dfcbed722891d
Description
The work for the ILLINOIS RIVER BASIN; LOCKPORT POOL; LOCKPORT, IL; LOCKPORT POOL MAJOR REHABILITATION; STAGE IC; FOREBAY WALL includes, but may not be limited to, the following: Mobilization and demobilization; clearing and grubbing of trees and miscellaneous vegetation; installation of new temporary communication cable in conduit; removal of existing communication cable and conduit; installation of a temporary and permanent communication cable conduits; AT&T communication cable installation coordination; removal and temporary storage of existing chain-link fencing; removal and temporary storage of existing flagpole, turbine and stone wall appurtenances; removal of existing guardrail; construction of temporary construction access road; removal and disposal of existing asphalt road surfacing; removal, processing and stockpiling of the existing stone retaining wall; excavation, processing and stockpiling of existing rock fill embankment; excavation, processing and stockpiling of existing bedrock; installation of seepage control drainage system including perforated PVC pipe and solid steel pipe and rock fill; placement of roller-compacted concrete (RCC) for construction of RCC wall and ramp; placement of processed rock fill; construction of two secant pile cutoff walls;; placement of base course and asphalt cement concrete (ACC) pavement; installation of new guardrail; installation of observation wells; reinstallation of chain-link fencing; installation of new guardrail; removal of existing and installation of new electrical and associated items; removal of existing onsite structures including a concrete tower, maintenance garage, testing station and light tower; and reinstallation of existing flagpole, turbine, and stone wall appurtenances; demolition of an existing canal wall and handrail; fabrication and installation of a new pedestrian access bridge; construction of two new rock dikes; placement of new riprap; and construction of a new PCC sidewalk. NAICS Code: 237990 Small Business Size Standard: $33.5 million Completion Days: 740 consecutive calendar days Estimated Range: $10,000,000 - $25,000,000 Unrestricted procurement The construction contract will be awarded using competitive negotiations procedures for achieving the best value to the Government through the Source Selection Process. The source selection will conducted in accordance with procedures prescribed in FAR Part 15. The criteria used to determine best value to the Government in the form of a Technical Proposal and Price Proposal will be outlined in the solicitation. It is anticipated that the plans and specifications for this project will be available on www.fbo.gov on or about 03 June 2014. PRE-PROSAL MEETING NOTICE A pre-posal meeting will be held on Monday, June 23rd, 2014, beginning at 10:00 A.M. at: Country Inn & Suites 1265 Lakeview Drive Romeoville, IL 60446 Telephone No.: 630-378-1052 The meeting is to provide an opportunity for offerors to discuss the Lockport Pool Major Rehabilitation, Stage IC, Forebay Wall project, Solicitation No. W912EK-14-R-0010. Offerors are highly encouraged to attend this Pre-Proposal Meeting and to make arrangements at least 24 hours in advance with: Mr. Jeff Scukanec, P.E. Area Engineer Eastern Area Office U.S. Army Corps of Engineers 926 SW Adams Street Suite 110 Peoria, IL 61602 Telephone No.: 309-637-1321, Ext. 6802 (Collect calls not accepted.) Preposal meeting powerpoint presentation and attendees are attached.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Scott Harris, 309-794-5443 USACE District, Rock Island
Documents
No documents available.
Lifecycle
Solicitation:
W912EK14R0010- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×Special NoticeJan 16, 2014
Z--CONSTRUCTION INDUSTRY DAY - LOCKPORT MAJOR REHABILITATION FOREBAY WALL PROJECT List of Attendees
- 3×Pre-SolicitationJun 24, 2014
Z--ILLINOIS RIVER BASIN; LOCKPORT POOL; LOCKPORT, IL; LOCKPORT POOL MAJOR REHABILITATION; STAGE IC; FOREBAY WALL
- SolicitationCurrentJul 14, 2014
Z--ILLINOIS RIVER BASIN; LOCKPORT POOL; LOCKPORT, IL; LOCKPORT POOL MAJOR REHABILITATION; STAGE IC; FOREBAY WALL