GovChime
Notice ID: 2e29fdd7accfcc793fd7f892c4eae7dfAward NoticeAwarded

Mississippi River Basin, Keithsburg, Illinois, Mercer County, Illinois, Keithsburg Division Habitat Rehabilitation and Enhancement Project (HREP) Stage I

Awarded on August 23, 2019. Full description on SAM.gov.

Awarded tounder W912EK19C0032 (source: SAM.gov award notice)• $4.0M

Overview

Posted
August 25, 2019
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of War

Notice details

Place of performance
POOL 18-UPPER MISSISSIPPI RIVER (UMR) - NORTH OF THE CITY OF KEITHSBURG, IL, MERCER COUNTY
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 6, 2025
Award date
Aug 23, 2019
Award amount (SAM.gov award notice)
$4.0M

Identifiers

Solicitation number
W912EK19B0003
Notice ID
2e29fdd7accfcc793fd7f892c4eae7df
Award number (PIID)
W912EK19C0032

Description

The U.S. Army Corps of Engineers, Rock Island District, has a requirement at in regards to the Keithsburg Division Habitat Rehabilitation and Enhancement Project Stage I. The Project is located in Pool 18 along the left descending bank of the Upper Mississippi River (UMR), immediately north of the City of Keithsburg in Mercer County, Illinois, between river miles 428.0 and 431.0. The Project is bordered by the Edwards River to the north, Pope Creek to the south, and the Mississippi River to the west. It is separated from the Mississippi River by a 3-mile-long berm. The Project area is a backwater complex of interconnected backwaters, wetlands, and floodplain habitat that is managed by the U.S. Fish and Wildlife Service (USFWS) as part of the Port Louisa National Wildlife Refuge (NWR). The Project is funded by the Upper Mississippi River Restoration program. The purpose of the Project is to restore and protect off-channel aquatic, wetland, and floodplain forest habitats. • Work will be within or adjacent to the river, subject to water fluctuations. Limited land access may be available across an unimproved berm. Work may require river access. Some work may be in the water. • Spillways will require construction along a berm located adjacent to the Mississippi River. Work will include tree clearing, excavation, and placement of drainage stone, geotextile fabric, riprap, and articulated concrete mats. NAICS Code: 237990 Size Standard: $36,500,000 Estimated Range: $1,000,000 - $5,000,000 100% Small Business Set Aside- Invitation for Bid It is anticipated the plans and specifications for this project will be available to request from www.fbo.gov on or about 19 July 2019. Any contractor wanting information pertaining to any small business concerns shall request assistance from the Rock Island District's Small Business Representative. Beth M. White Deputy, Small Business Programs US Army Corps of Engineers, Rock Island District Elizabeth.M.White@usace.army.mil Desk: 309-794-5205 Cell: 309-422-6595

Full description on SAM.gov

Award Overview

Award Number

W912EK19C0032

Award Amount (SAM.gov award notice)

$4.0M

Award Date

Aug 23, 2019

Awardee

Awardee UEI

Y7XGK8ARPMR6

Awardee CAGE Code

54CW0

Original Solicitation

Notice ID: 2e29fdd7accfcc793fd7f892c4eae7df

Posted Date: Aug 25, 2019

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W912ES24C0017
    LEGACY CORPORATION OF IL
    Department of DefenseNAICS 237990
    $11.6MSigned Jul 20, 2026
  • W912ES26FA058
    LEGACY CORPORATION OF IL
    Department of DefenseNAICS 237990
    $920.5KSigned Jul 15, 2026
  • W912ES26DA004
    LEGACY CORPORATION OF IL
    Department of DefenseNAICS 237990
    —Signed Jul 1, 2026
  • W912ES24C0017
    LEGACY CORPORATION OF IL
    Department of DefenseNAICS 237990
    $11.6MSigned Jul 1, 2026
  • W912ES26FA058
    LEGACY CORPORATION OF IL
    Department of DefenseNAICS 237990
    $920.5KSigned Jun 30, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912EK19B0003
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 7×
    Pre-SolicitationApr 30, 2019

    Mississippi River Basin, Keithsburg, Illinois, Mercer County, Illinois, Keithsburg Division Habitat Rehabilitation and Enhancement Project (HREP) Stage I

    Notice 8c43a398bd6f184535020c17bc5cc905 on SAM.gov

  2. SolicitationAug 20, 2019

    Mississippi River Basin, Keithsburg, Illinois, Mercer County, Illinois, Keithsburg Division Habitat Rehabilitation and Enhancement Project (HREP) Stage I

    Notice 6512d9d1652e28b028200dd92474e653 on SAM.gov

  3. AwardedCurrentAug 25, 2019

    Mississippi River Basin, Keithsburg, Illinois, Mercer County, Illinois, Keithsburg Division Habitat Rehabilitation and Enhancement Project (HREP) Stage I

    Notice 2e29fdd7accfcc793fd7f892c4eae7df on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EK19B0003

Archive Date

Sep 23, 2019