GovChime
Notice ID: d295f14fd49d4ae5838c69b4cd01a5b8Solicitation

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ

Archived on August 11, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
July 27, 2022
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ROCK ISLAND
Place of performance
Johnston, 50131
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EK22B0007
Notice ID
d295f14fd49d4ae5838c69b4cd01a5b8

Description

Please see Amendment 0001 and Amendment 0002 attachment for additional information relating to this invitation for bid. Bid opening will be held at 2:00PM on 27 July 2022.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EK22B0007
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationFeb 18, 2022

    Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ

    Notice ff62e72dd7bc4736afe10bbe8af7a965 on SAM.gov

  2. 5×
    SolicitationCurrentMay 26, 2022

    Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ

    Notice d295f14fd49d4ae5838c69b4cd01a5b8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
TITLE OF PROJECT: Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs (W912EK26BA019) The Government anticipates issuing an SDVOSB Invitation for Bids (IFB) with the intent of awarding a Firm-Fixed Price construction contract for the project known as: PL84-99 Flood Repairs. PROJECT DESCRIPTION: The work includes, but is not limited to, excavation of earthen levee, inspection and replacement of existing toe drain piping, backfill of excavation, inspection and repair of existing flap gate, replacement of concrete joint sealants, surveying, and site restoration. This prospective contract action will be conducted using the NAICS Code 237990 (Other Heavy and Civil Engineering Construction), the size standard is $45M, and the Federal Supply Code is Y1PZ Construction of Other Non-Building Facilities. The solicitation will proceed as a Competitive SDVOSB IFB Set-Aside and is estimated to be issued about late October 2026. If applicable, the site visit date, time and location will be identified in the solicitation. BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRESOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) are available via SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check sam.gov frequently for any changes to the interested vendors list and notice.
-Pre-Solicitation10/28/2026
The U.S. Army Corps of Engineers (USACE) Omaha District intends to determine the extent of capable small businesses and other than small business firms that have the availability in providing the requirement described below. USACE is considering issuing a Total Small Business Set-Aside, Two-Step Invitation for Bid (IFB) that will result in one (1) Firm Fixed-Price contract for the Missouri River Levee L594-601 Repair on the Missouri River in Mills and Fremont County, Iowa. The North American Industry Classification System (NAICS) Code is 237990, (Other Heavy and Civil Engineering Construction). Estimated Magnitude of Construction: Between $50,000,000 and $100,000,000. Bid bonds will be required to be submitted with the Step Two bid submission. Payment and Performance Bonds will be required for the full amount (100%) at the time of contract award before the Notice to Proceed (NTP) can be issued. PROJECT SCOPE: Missouri River Levee L594-601 project includes repairing damages of breaches and filling scour holes of various lengths and depths, loss of critical levee sections, crest damage, landside and riverside embankment erosion, berm damage, levee ramp damage, levee surfacing, toe drain, drainage structure damage, relief well damage, pump station damage, other equipment or instrumentation damage, loss of vegetation, seepage boils, and slope failure. The work will be along the left bank of the Missouri River, approximately between the towns of Bartlett, Iowa and Pacific Junction, Iowa. USACE is seeking comments from the construction community for the following: Use of Project Labor Agreements (PLA) for this project; Whether a small business set-aside would be competitive considering the bonding requirements and potential PLA requirements. A PLA is defined as a pre-hire collective bargaining agreement between a Prime contractor and one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S. C. 158(f). ***PLEASE ANSWER THE QUESTIONS VIA THE LINK AT THE BOTTOM OF THIS NOTICE *** Federal Acquisition Regulation (FAR 22.503) Policy provides that: (a) Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. (b) When awarding a contract in connection with a large-scale construction project (see 22.502), agencies shall require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.504(d) applies. (c) An agency may require the use of a project labor agreement on projects where the total cost to the Federal Government is less than that for a large-scale construction project, if appropriate. (1) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will— (i) Advance the Federal Government's interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (ii) Be consistent with law. (2) Agencies may consider the following factors in deciding whether the use of a project labor agreement is appropriate for a construction project where the total cost to the Federal Government is less than that for a large-scale construction project: (i) The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. (ii) There is a shortage of skilled labor in the region in which the construction project will be sited. (iii) Completion of the project will require an extended period of time. (iv) Project labor agreements have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project. (v) A project labor agreement will promote the agency's long term program interests, such as facilitating the training of a skilled workforce to meet the agency's future construction needs. (vi) Any other factors that the agency decides are appropriate Interested prime contractors must have an active System for Award Management (SAM) registration. Firms can register via the SAM website at https://sam.gov/. If an offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one (1) business/firm/entity. The point of contact for all questions/inquiries is Contract Specialist Karen Caskey at email above karen.l.caskey@usace.army.mil. Please incorporate responses to the following questions within your submission: The questions are in the following link: https://forms.osi.apps.mil/r/a1KEhTK5aR?origin=lprLink The link is also available in the link section below.
-Market Research03/19/2026
This is a pre-solicitation notice. This is NOT a solicitation. Do NOT submit proposals or questions in response to this notice. It is anticipated that the solicitation will be posted on Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ by the end of November 2026. The solicitation is anticipated to be posted for 30 calendar days. The U.S. Army Corps of Engineers (USACE) Norfolk District (NAO) intends to issue an Invitation for Bid (IFB) acquisition for the NASA Wallops Shoreline Breakwaters Project in Accomack County, Virginia. This procurement will be conducted in accordance with FAR Part 14, Invitation for Bid (IFB). The Government intends to award a firm-fixed-price (FFP) contract. The requirement will be solicited as a 100% small business set aside. The applicable NAICS code is 237990, Other Heavy and Civil Engineering Construction (Dredging and Surface Cleanup Activities), with a small business standard of $45 million. In accordance with DFARS 236.204 - Disclosure of the Magnitude of Construction Projects, the magnitude of construction is between $10,000,000 and $25,000,000. DESCRIPTION OF WORK The U.S. Army Corps of Engineers – Norfolk District is seeking eligible firms capable of constructing breakwaters along the beach of Wallops Island. The number of proposed breakwaters for this project will be between two to four and placed approximately 200 feet offshore (from Mean High Water elevation). Each breakwater will be constructed of Type II rip rap for armor stone and VDOT Class III stone for core stone. The weight of material for each breakwater is approximately 10,000 tons. Breakwaters are to be placed on 12-inch-thick marine mattress with geotextile fabric. Water depths for breakwater placement range between -9.5 ft and -12.0 ft NAVD88. Each breakwater will be constructed to a crest height of +7 ft NAVD88. Material for breakwaters may be transported to the project site either by land or sea. Construction of breakwaters may occur either by land or sea. Various work restrictions are expected due to active rocket launches within the vicinity of the project site, which will require all construction activities to stop and personnel to vacate the premises for hours to day(s). The construction completion date will be approximately 325 calendar days from the issuance of Notice to Proceed (NTP). Contractors will be required to submit bid bonds documents with the proposal. The successful awardee will be required to provide 100% payment and performance bonds for the project. The effort will be solicited and awarded utilizing the Sealed Bid procedures under FAR Part 14. Anticipated solicitation issuance time frame is on or about the end of November 2026. THIS PROJECT IS A 100% SMALL BUSINESS SET ASIDE PROCUREMENT INVITATION FOR SEALED BID. The Government intends to award a firm fixed price contract using INVITATION FOR BID WITH PRE-AWARD SURVEY and procedures outlined in FAR 36 and FAR 14. Pre-award survey will determine contractor responsibility in accordance with FAR 9.104. Bidders will be evaluated on both pre-award survey and conformance to the solicitation and price. The Government reserves the right to reject any or all Bids; and to award the contract to other than the lowest total price and to award to the bidder submitting the lowest bid determined by the Government to be responsible. Bid bonds will be required with bid submittals. In addition, the awardee must be found responsible in accordance with FAR 9.1. The below Pre-Award Survey Information will be requested of the apparent low offeror. This information is not required to be responsive to the Invitation for Bid. a) Current commitments and expected dates of completion. b) One (1) signed bank reference demonstrating adequate financial resources. If bidder’s firm has a line of credit – provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required). c) The bidder shall provide the latest three (3) complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. Definitive Responsibility Crieteria: This requirement will use Definitive Responsibility Criteria (DRC) which are specific and objective standards established to inform the Contracting Officer. In accordance with FAR 9.104. These criteria will be used to assess whether the apparent low bidder can demonstrate the expertise and specialized facilities needed for adequate contract performance. The inability of a contractor otherwise eligible for award to demonstrate minimally acceptable experience as measured by the DRC may result in the Contracting Officer determining the contractor is not responsible. The Definitive Responsibility Criteria will assess the following work items: 1. The apparent low bidder shall provide one documented experience of underwaterplacing at least 5,000 square yards of geotextile fabric or marine mattresses within the last 7 years. 2. The apparent low bidder shall provide documented experience proving successfully built at least one marine stone structure of at least 15,000 tons within the last 7 years. This notice does not constitute an invitation for bid. The IFB and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ on or about the end of November 2026. Notification of any changes to this pre-solicitation will only be made on this website. Therefore, it is the offerors responsibility to check the website regularly for any posted changes to the pre-solicitation notice, release of the solicitation, specification, drawings, and all subsequent amendments. Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring at https://piee.eb.mil/ to respond to the solicitation and any amendments or other information regarding this acquisition. IT IS THE SOLE RESPONSIBILITY OF THE OFFEROR TO CONTINUALLY VIEW THE WEBSITE FOR CHANGES. No hard copies will be available. Prospective bidders are responsible for monitoring SAM.gov to respond to the solicitation and any amendments or other information regarding this acquisition. Prospective bidders are required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment of any contract. NOTE: Online Representations and Certifications Applications apply to this solicitation. Inquires must be directed to ProjNet in accordance with the forthcoming Solicitation document.
-Pre-Solicitation11/24/2026
The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear.
-Solicitation11/10/2026
TITLE OF PROJECT: Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs (W912EK27BA012) The work includes, but is not limited to, excavation of earthen levee, inspection and replacement of existing toe drain piping, backfill of excavation, inspection and repair of existing flap gate, replacement of concrete joint sealants, surveying, and site restoration. The work is located in the Mississippi River Basin, within the city of Bettendorf, Scott County, Iowa, and as indicated. All solicitation documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK27BA012."
-Solicitation12/17/2026

Additional Details

Solicitation Number

W912EK22B0007

Archive Date

Aug 11, 2022

Office Address

ROCK ISLAND, IL, 61299-5001