Notice ID: 3b307262810e4749aba47d0def0f78c0Solicitation
Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs
Archived on September 22, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- September 9, 2022
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ROCK ISLAND
- Place of performance
- Johnston, 50131
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912EK22B0011
- Notice ID
- 3b307262810e4749aba47d0def0f78c0
Description
The purpose of amendment 0003 is to extend the bid due date to 07 September 2022, update the bid due time to 10:00 AM and revise Spec Section 33 05 23 and a Drawing. _____________________________________________________________________________ The purpose of amendment 0002 is to revise the Contract Duration, CLINs, Schedule of Prices, FAR Clauses: 5152.211-9000, 52.211-10 and 5152.211-9001, Spec Sections: 00 73 05, 01 20 00, 01 33 00 Submittal Register, 33 05 23 and Drawings/Plan Set. _____________________________________________________________________________ The purpose of amendment 0001 is to establish a formal site visit on 16 August 2022, extend the bidder inquiry date to 19 August 2022 and extend the proposal due date to 02 September 2022. _____________________________________________________________________________ Base Bid – Bob Shetler Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Directional Drilling, Trenching, Gate Valve Installation, Fire Hydrants, Water Meter Vault, Sanitary Sewer Piping, Sanitary Sewer Manhole, Sanitary Sewer Duplex Lift Station, Concrete Work, Asphalt Work, Granular Surfacing, Flowable Fill and Site Restoration. Option A – Cherry Glen Campground includes Mobilization and Demobilization, Traffic Control, Demolition, Water Meter Vault, Sanitary Sewer Lining, Sanitary Sewer, Sanitary Sewer Manhole Rehab, Lagoon Sludge Removal, Lagoon Piping & Manholes, Lagoon Earthwork, Lagoon Slope Protection Stone, Trail Pavement Replacement and Site Restoration. Option B – Prairie Flower Campground includes Mobilization and Demobilization, Demolition, Direction Drilling, Gate Valves, Fire Hydrants, Water Meter Vaults, Sanitary Sewer, Sanitary Sewer Manhole Repair, Sanitary Sewer Duplex Lift Station and Site Restoration.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912EK22B0011- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 8, 2022
Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs
- 5×SolicitationCurrentAug 1, 2022
Des Moines River Basin, Saylorville Lake, Polk County, IA, Bob Shetler, Cherry Glen and Prairie Flower, Water and Sewer Repairs
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912EK22B0011
Archive Date
Sep 22, 2022
Office Address
ROCK ISLAND, IL, 61299-5001