GovChime
Notice ID: 0ed069a00e684c2d94431f8e7f758fe7Solicitation

Saylorville Lake Roads, Trails, and Infrastructure Repair

Archived on May 28, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−05:00
Posted
May 14, 2024
Notice type
Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ROCK ISLAND
Place of performance
Johnston, 50131
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EK24B0006
Notice ID
0ed069a00e684c2d94431f8e7f758fe7

Description

UPDATE -- 14 MAY 2024 BID SUMMARY SHEET POSTED. SEE ATTACHMENTS. The U.S. Army Corp of Engineers (USACE) has a requirement for road, trail, and infrastructure repairs at Saylorville Lake that includes, but is not limited to, removal of existing aggregate base, preparation of existing aggregate base, compacted Portland cement or fly ash modified base course, new compacted aggregate base, compacted aggregate shoulders, topsoil placement, fill, excavation/cut, asphalt pavement patching, asphalt cement concrete (ACC) milling, asphalt crack/joint sealing, ACC pavement demolition and removal, saw cut asphalt, trail section replacement, bituminous fog coat, hot mix asphalt (HMA) binder course, HMA surface course, Portland cement concrete (PCC) milling, concrete crack/joint sealing, PCC pavement and curb and gutter demolition and removal, steel reinforcement, concrete curb and gutter, concrete pavements and slabs, PCC sidewalks, synthetic fiber reinforcement, seeding, geotextile, pavement marking, steel-backed timber guardrail installation, detectable warning panels, site restoration, and related incidental work. This is an Unrestricted Invitation for Bids (IFB) (Full and Open Competition) Amendment 0001 was posted 4/29/2024

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EK24B0006
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentApr 10, 2024

    Saylorville Lake Roads, Trails, and Infrastructure Repair

    Notice 0ed069a00e684c2d94431f8e7f758fe7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EK24B0006

Archive Date

May 28, 2024

Office Address

ROCK ISLAND, IL, 61299-5001