GovChime
Notice ID: 650ffbbdfd6842d2af7d1f5a1e68c5d0Presolicitation

ILWW New Carport

Archived on June 12, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
May 13, 2024
Notice type
Presolicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ROCK ISLAND
Place of performance
Peoria, 61603
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EK24Q0032
Notice ID
650ffbbdfd6842d2af7d1f5a1e68c5d0

Description

The US Army Corps of Engineers, Rock Island District, Illinois Waterway Project (ILWW) has the requirement for the entire supply and installation of one carport. The carport will provide protection for machinery and cranes. SPECIFICATIONS: 30’ x 45’ x 12’ Vertical Roof Carport with 3-Closed Sides - Vertical Roof Base Width 30’ Base Length 45’ Sidewalls Height 12’ (12’ horizontal clearance or greater on open/entrance end.) Left and right sidewalls completely enclosed. Completely enclosed back. Gable only front, open/entrance end. Installed location will be on gravel (CA6) that has approximately 0” to 1/8” per foot slope. The grade is comprised of approximately 18” deep compacted CA6 and below the CA6 is sand. Engineer Certified (Building Permit not required): Completed installation shall be engineer certified for up to 130mph winds, or greater, and a snow load rating of 40 lbs. per square foot, or greater. Carport shall require anchoring to meet the above requirement. The contractor shall provide all materials, tools, personnel, equipment, installation, and documents to complete the requirement. After receipt of order (ARO), the Contractor shall complete within 8-weeks. 1-year, or greater, warranty on product and installation defects, which starts after installation is complete by the Contractor. Quote for standard paint colors. One and no more than two colors will be provided for panels after notice to proceed is authorized.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EK24Q0032
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentMay 13, 2024

    ILWW New Carport

    Notice 650ffbbdfd6842d2af7d1f5a1e68c5d0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EK24Q0032

Archive Date

Jun 12, 2024

Office Address

ROCK ISLAND, IL, 61299-5001