GovChime
Notice ID: baab6a376db341d3ab73bbb35185ae58Solicitation

Southwest Coastal Louisiana Nonstructural Coastal Storm Risk Management Project

Archived on April 30, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
April 5, 2024
Notice type
Solicitation
Set-aside
8(a) Set-Aside (FAR 19.8)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST NEW ORLEANS
Place of performance
Cameron
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EK24R0001
Notice ID
baab6a376db341d3ab73bbb35185ae58

Description

Southwest Coastal Louisiana Nonstructural Coastal Storm Risk Management Project Summary of Work: This project is a two-phase design-build to provide design and construction activities to elevate twenty-one (21) designated residential structures in southwestern coastal Louisiana (LA). Residential structures will be elevated to the 100-year base flood elevation based on year 2075 hydrology in two (2) parishes: Vermilion and Calcasieu. Two-Phase Design-Build - Competitive 8(a) Best Value with trade-offs Request for Proposal NAICS: 237990 - Other Heavy and Civil Engineering Construction Estimated Range: Between $1,000,000.00 - $5,000,000.00 __________________________________________________________________________ The reason for RFP Amendment 0001 is due to the Government inadvertently posting a draft version of Attachment J-3 Section L and Attachment J-4 Section M. The correct (at that time) documents were dated 21 December 2023 (List of Attachments Section at the end of the RFP). Revised Attachments J-3 Section L and J-4 Section M are provided in RFP Amendment 0001 (Revision dates of 12 January 2024). These two revised attachments incorporate the intended language from 21 December 2023 (that should have been originally posted) and changes based on the Government's response to questions received via ProjNet. Wage rates have also been updated in the list of attachments. AMENDMENT 0002 Note – This amendment revises documents that are applicable to Phase II of this Design-Build solicitation and addresses some of the pending Projnet Q&A responses from the Government regarding Phase II. No action is required of any Offeror who submitted a proposal for Phase I evaluation and no proposal revisions are being accepted. Phase I evaluations are currently ongoing. The release of this amendment is to facilitate a smooth transition into Phase II proposal generation following completion of the evaluation of Phase I proposals, up to a maximum of five most highly qualified offerors will be selected to participate in Phase II. RFP Amendment 0003: Only those offerors who have been selected to continue to Phase II of this project are hereby invited to submit Phase II proposals. The due date and time for Phase II proposal submission is 2:00 P.M. Central Time on 15 April 2024. AMENDMENT 0004 Note – This amendment revises two Section J attachments (J-5 and J-26) and adds a new Section J attachment J-27 (which is provided via DOD SAFE only to Phase II invitees). Projnet Q&A responses from the Government regarding Phase II that were received by the cutoff date/time have been addressed. Phase II proposal submission due date/time remains unchanged. AMENDMENT 0005 Note – This amendment is due to the Government providing additional responses to questions received after the due date/time via Projnet on 5 April 2024 and Attachment J-3 is revised to address a minor administrative oversight.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EK24R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationNov 29, 2023

    Southwest Coastal Louisiana Nonstructural Coastal Storm Risk Management Project

    Notice 42703c5098074bfeaa54f7f66c4db2c7 on SAM.gov

  2. 10×
    SolicitationCurrentDec 21, 2023

    Southwest Coastal Louisiana Nonstructural Coastal Storm Risk Management Project

    Notice baab6a376db341d3ab73bbb35185ae58 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.
65%
Market Research09/02/2026
This update provides the following: 1. Program slidedeck presented at general session. 2. Industry Day Attendance Sheet 10/28/2026. The U.S. Army Corps of Engineers, Mobile District, extends its appreciation to all industry partners who attended the recent Selma AL Flood Management Risk and Bank Industry Day. The Industry Day briefing charts and attendee list contain Controlled Unclassified Information (CUI).Access is restricted to verified U.S. DoD contractors. New interested parties wishing to obtain the briefing materials must contact the Contracting Office directly to verify eligibility and fulfill CUI access requirements.
62%
Special Notice12/11/2026
Amendment 0006: An amendment has been made to Solicitation W9123626BA0008. Please see attachment SF30, Solicitation Amendment W9123626BA008_0006, extending the bid due date and bid opening date. The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management Area (FEDMMA), located at JBLE - Eustis with provisions to include Regrading/raising the disposal site berms to an elevation of 36 ft. The berms are currently at elevation 34 ft and have settled in a few places to below 34 ft. The work will also include the relocation of two existing spill boxes 50 - 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation.
57%
Solicitation12/01/2026
PROJECT DESCRIPTION: The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the Design-Bid-Build construction of maintenance requirements at the Fort Eustis Dredge Material Management Area, located at JBLE – Eustis with provisions to include: Regrading/raising the disposal site berms to an elevation of 36 ft. The berms are currently at elevation 34 ft and have settled in a few places to below 34 ft. The work will also include the relocation of two existing spill boxes 50 – 60 feet into the disposal site. The existing access dirt and stone access ramp will need to be regraded, as well, to meet the new top-of-berm elevation. Magnitude of Construction cost is between $5,000,000 - $10,000,000 THIS SOURCES SOUGHT ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. It is a market research tool being used to determine the availability and adequacy of potential sources prior to determining the acquisition strategy. The Government is not obligated to and will not pay for any information received from potential sources as a result of this announcement. It is requested that interested sources submit to the contracting office a brief capabilities statement package demonstrating ability to perform the requested services identified in this survey. Submittal should be no more than 3 pages in length, single-spaced, 12 point font minimum. RESPONSE REQUIREMENTS: 1. Offeror's name, addresses, points of contact, telephone numbers, CAGE code, UEI, and e-mail addresses. 2. Offeror's business size to include each designation as Certified Small Businesses, 8(a) contractors, HUBZone Certified Small Business Concerns, Service-Disabled Veteran Owned Small Businesses and Woman Owned Businesses. For 8(a) Contractors, please include proposed graduation date from the 8(a) Program. 3. Offeror’s bonding capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars). 4. Provide a narrative indicating the primary nature of your business. Narratives shall demonstrate experience in a similar type of work as described, at a similar contract value, and in a similar location. 5. Description of Experience – Provide two (2) to three (3) examples of successful projects similar to requirements described in the project description above, within the past five (5) years. If a specialty sub-contractor is used, the sub-contractor shall also provide work examples and experience. Based on definitions above, for each project submitted include: a. Current percentage of construction complete and the date when it was or will be completed. b. Scope of the project c. Size of the project d. Dollar value of the project e. The portion and percentage of work that was self-performed DISCLAIMER: Since this is a Sources Sought Announcement only, no evaluation letters and/or results will be issued to the respondents. No solicitation exists and solicitation requests will not be acknowledged. USACE Norfolk District is not seeking or accepting unsolicited proposals and will not accept telephone inquiries. This Sources Sought should not be construed in any manner to be an obligation of the U.S. Army Corps of Engineers, Norfolk District to issue a contract, or result in any claim for reimbursement of costs for any effort you expend responding to this request. RESPONSE: All responses to this announcement may be sent electronically to Damian C. Patterson at damian.c.patterson@usace.army.mil and copy to Michael.Hagerty@usace.army.mil All mailed (hard copy) responses will not be considered.
56%
Market Research12/01/2026
Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011) The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approximately 2.25 million cubic yards of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approximately 2.25 million cubic yards of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The magnitude of construction is between $10,000,000 and $20,000,000. This requirement is Unrestricted. The solicitation will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF} files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the abovereferenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Bidders must check the website periodically for any amendments to the solicitation. Bidders shall maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov to be eligible for a Government contract award. If a bidder is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective bidder. Bidders are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration's Subnet, at http://web.sba.gov/subnet. Bid date will be established via amendment.
51%
Solicitation07/16/2027

Additional Details

Solicitation Number

W912EK24R0001

Archive Date

Apr 30, 2024

Office Address

NEW ORLEANS, LA, 70118-3651