GovChime
Notice ID: 30522043c0918a0876d897510ca4fa0cAward NoticeAwarded

Z--Aquatic Ecosystem Restoration Stevenson Creek - Section 206, Clearwater, Pinellas County, Florida

Awarded on August 17, 2009. Full description on SAM.gov.

Awarded tounder W912EP-09-C-0036 (source: SAM.gov award notice)• $4.7M

Overview

Posted
September 25, 2009
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026
Award date
Aug 17, 2009
Award amount (SAM.gov award notice)
$4.7M

Identifiers

Solicitation number
W912EP08R0022
Notice ID
30522043c0918a0876d897510ca4fa0c
Award number (PIID)
W912EP-09-C-0036

Description

Project work is being conducted under Section 206 Authorization, Aquatic Ecosystem Restoration, for Stevenson Creek, Clearwater, Florida. Major elements of work include dredging, material separation, dewatering of muck material, transportation, upland disposal, and construction of mangrove creation areas. Dredge element includes dredging approximately 61,000 cubic yards of material from Stevenson Creek Estuary Reach 1 to a depth limit of -4.3 feet NAVD plus 0.5 foot allowable over depth, and dredge approximately 33,000 cubic yards of material from Estuary Reach 2 to a depth limit of -3.3 feet NAVD plus 0.5 foot allowable over depth. Material separation and dewatering element includes construction of dewatering site, and execution of operational process to separate sand and muck, and to dewater muck. Develop, maintain and restore 2 acre process and storage area. Transportation and Upland Disposal Element includes storage and transportation operations to handle sand, and haul dewatered muck to upland site located approximately 20 miles northeast of project site in Hillsborough County, Florida. Place material uniformly over approximated 25-acres of pastureland. Mangrove Creation area element includes construction of three, mangrove areas totaling 15,488 square yards of plantable surface utilizing clean sand from separation process. Transport excess sand to City of Clearwater Maintenance Yard located 5 miles from project site. Work also includes turbidity monitoring, Elutriate Toxicity Testing, Vibration Control Monitoring, and incidental related work. Performance Period is 270 calendar days.

Full description on SAM.gov

Award Overview

Award Number

W912EP-09-C-0036

Award Amount (SAM.gov award notice)

$4.7M

Award Date

Aug 17, 2009

Awardee

Original Solicitation

Notice ID: 30522043c0918a0876d897510ca4fa0c

Posted Date: Sep 25, 2009

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Willie Ann Mays, 904-232-3535 US Army Engineer District, Jacksonville

Documents

No documents available.

Lifecycle

Solicitation:W912EP08R0022
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentSep 25, 2009

    Z--Aquatic Ecosystem Restoration Stevenson Creek - Section 206, Clearwater, Pinellas County, Florida

    Notice 30522043c0918a0876d897510ca4fa0c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP08R0022

Archive Date

Oct 25, 2009

Office Address

JACKSONVILLE, FL, 32207-0019