GovChime
Notice ID: 007f8527c54568f564c2029f4745db60Solicitation

Y--Revision to increase period of performance and to include one (1) Optional Bid Item for Herbert Hoover Dike Rehabilitation Structure Replacements, S-274 (C-12A) and S-278 (C-2), Reconstruction, Palm Beach and Hendry Counties, Florida

Archived on September 25, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
July 2, 2014
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
Place of performance
USACE District, Jacksonville P.O. Box 4970, Jacksonville FL 32232-0019 US
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912EP14R0017
Notice ID
007f8527c54568f564c2029f4745db60

Description

The Herbert Hoover Dike Rehabilitation Structure Replacements project includes a Base Bid and one (1) Optional Bid Item. The work includes demolition and removal of the existing Herbert Hoover Dike Culverts 12A and 2 and the construction of new water control Structures S-274 and S-278 at the respective existing locations of Culverts 12A and 2. The demolition and reconstruction efforts will require the installation of a cofferdam around each structure site consisting of earth and steel sheet pile within Lake Okeechobee and steel sheet pile at the landside in order to dewater each construction site. These structures will include cast-in-place reinforced concrete foundations, headwalls, endwalls, culvert barrels with steel liners, and sheetpile scour cutoff walls under all headwalls and endwalls. Combination flap/slide gates will be installed at the lakeside headwall of each structure. S-274 will consist of one (1) 8-foot diameter culvert approximately 180 feet long. S-278 will consist of three (3) 10-foot diameter culverts approximately 170 feet long. A cutoff wall will also be installed in the centerline of the embankment at each site. The embankments will be reconstructed to match the existing crest elevation of the dike. Restoration riprap will be installed along the lakeside embankment faces and control buildings will be installed at the landside work platform at each structure. Work also includes placement of surcharge fill (S-278 only), by-pass pumping (S-274 only), grassing and turbidity monitoring. Option A is for the Removal of petroleum contaminated soil at the S-274 (C-12A) Site. PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government. Proposals will be evaluated on Technical Merit, Past Performance, Small Business Participation and Price. The performance period is approximately 1,800 calendar days after Notice to Proceed (NTP), plus 90 calendar days for grass establishment. Magnitude of construction is between $25,000,000.00 and $100,000,000.00. THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. The solicitation will be issued on or about 04 June 2014 with proposals due on or about 08 July 2014. Solicitation will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/. NAICS Code 237990, size standard $33.5 million.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Timothy G. Humphrey, 904-232-1072 USACE District, Jacksonville

Documents

No documents available.

Lifecycle

Solicitation:W912EP14R0017
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationJun 16, 2014

    Y--Revision to increase period of performance and to include one (1) Optional Bid Item for Herbert Hoover Dike Rehabilitation Structure Replacements, S-274 (C-12A) and S-278 (C-2), Reconstruction, Palm Beach and Hendry Counties, Florida

    Notice 6e7b00352abed6b70a88d386ff6db829 on SAM.gov

  2. SolicitationCurrentJul 2, 2014

    Y--Revision to increase period of performance and to include one (1) Optional Bid Item for Herbert Hoover Dike Rehabilitation Structure Replacements, S-274 (C-12A) and S-278 (C-2), Reconstruction, Palm Beach and Hendry Counties, Florida

    Notice 007f8527c54568f564c2029f4745db60 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP14R0017

Archive Date

Sep 25, 2014