GovChime
Notice ID: 9e8a5828c5b29db99d4aa4b6b106a3bdAward NoticeAwarded

PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL

Awarded on September 12, 2019. Full description on SAM.gov.

Awarded tounder W912EP19C0026 (source: SAM.gov award notice)• $8.1M

Overview

Posted
September 12, 2019
Notice type
Award Notice

Notice details

Place of performance
Collier County, FL
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025
Award date
Sep 12, 2019
Award amount (SAM.gov award notice)
$8.1M

Identifiers

Solicitation number
W912EP19B0021
Notice ID
9e8a5828c5b29db99d4aa4b6b106a3bd
Award number (PIID)
W912EP19C0026

Description

The solicitation will consist of a Base and Two Options as follows: Base Work includes the removal and re-grading of all east-west roads to level undisturbed ground logging trams, existing roads, and adjacent ditches, swales, and spoil in the area bounded by Miller Canal to the east, the Tieback Levee to the north, 82nd Avenue SE to the south, and to the ends of the roads on the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Heavy equipment involved in this work will be allowed to travel across and along Miller Boulevard. Additionally, 68th Avenue SE shall not be degraded, but the adjacent spoil and swales shall be leveled. Option 1 work includes the removal and re-grading of all existing logging trams and east-west roads and their adjacent ditches and spoil in the area bounded by 84th Avenue SE to the north, Miller Canal to the east, 100th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Option 2 work includes the removal and re-grading of all existing remaining east-west roads and their adjacent ditches and spoil in the area bounded by 102nd Avenue SE to the north, Miller Canal to the east, the end of Miller Boulevard at the gate below 128th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. The contractor shall begin performance within 90 calendar days and complete performance within 850 calendar days (Base work - 246 calendar days, Option 1 work - 266 calendar days, and Option 2 work - 336 calendar days) after receipt of Notice to Proceed (NTP). The performance period is mandatory. PROPOSAL REQUIREMENTS The Invitation for Bid (IFB) will be issued on or about 15 July 2019 and bids will be due on or about 14 August 2019. NAICS Code 238910, Size Standard $15.0 Million. Magnitude of Construction is between $9,000,000.00 and $14,000,000.00. A Pre-Proposal Conference will be held on a date to be determined later, and will be listed in the solicitation. THIS PROCUREMENT IS A SMALL BUSINESS SET-ASIDE. The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must regsiter as an interested vendor on the Federal Business Opportunities webiste at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be regisitered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov

Full description on SAM.gov

Award Overview

Award Number

W912EP19C0026

Award Amount (SAM.gov award notice)

$8.1M

Award Date

Sep 12, 2019

Awardee

Awardee UEI

KL4CTAB43EG3

Original Solicitation

Notice ID: 9e8a5828c5b29db99d4aa4b6b106a3bd

Posted Date: Sep 12, 2019

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912EP19B0021
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationJun 28, 2019

    PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL

    Notice db088780be0038e783909f40d80d4ebf on SAM.gov

  2. SolicitationAug 16, 2019

    PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL

    Notice 546b970d7fc49a4b408cb9312c875f4f on SAM.gov

  3. AwardedCurrentSep 12, 2019

    PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL

    Notice 9e8a5828c5b29db99d4aa4b6b106a3bd on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP19B0021

Archive Date

Sep 27, 2019

Office Address

JACKSONVILLE, FL, 32207-0019