Notice ID: 9e8a5828c5b29db99d4aa4b6b106a3bdAward NoticeAwarded
PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL
Awarded on September 12, 2019. Full description on SAM.gov.
Awarded tounder W912EP19C0026 (source: SAM.gov award notice)• $8.1M
Overview
- Posted
- September 12, 2019
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Collier County, FL
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Sep 12, 2019
- Award amount (SAM.gov award notice)
- $8.1M
Identifiers
- Solicitation number
- W912EP19B0021
- Notice ID
- 9e8a5828c5b29db99d4aa4b6b106a3bd
- Award number (PIID)
- W912EP19C0026
Description
The solicitation will consist of a Base and Two Options as follows: Base Work includes the removal and re-grading of all east-west roads to level undisturbed ground logging trams, existing roads, and adjacent ditches, swales, and spoil in the area bounded by Miller Canal to the east, the Tieback Levee to the north, 82nd Avenue SE to the south, and to the ends of the roads on the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Heavy equipment involved in this work will be allowed to travel across and along Miller Boulevard. Additionally, 68th Avenue SE shall not be degraded, but the adjacent spoil and swales shall be leveled. Option 1 work includes the removal and re-grading of all existing logging trams and east-west roads and their adjacent ditches and spoil in the area bounded by 84th Avenue SE to the north, Miller Canal to the east, 100th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Option 2 work includes the removal and re-grading of all existing remaining east-west roads and their adjacent ditches and spoil in the area bounded by 102nd Avenue SE to the north, Miller Canal to the east, the end of Miller Boulevard at the gate below 128th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. The contractor shall begin performance within 90 calendar days and complete performance within 850 calendar days (Base work - 246 calendar days, Option 1 work - 266 calendar days, and Option 2 work - 336 calendar days) after receipt of Notice to Proceed (NTP). The performance period is mandatory. PROPOSAL REQUIREMENTS The Invitation for Bid (IFB) will be issued on or about 15 July 2019 and bids will be due on or about 14 August 2019. NAICS Code 238910, Size Standard $15.0 Million. Magnitude of Construction is between $9,000,000.00 and $14,000,000.00. A Pre-Proposal Conference will be held on a date to be determined later, and will be listed in the solicitation. THIS PROCUREMENT IS A SMALL BUSINESS SET-ASIDE. The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must regsiter as an interested vendor on the Federal Business Opportunities webiste at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be regisitered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov
Award Overview
Award Number
W912EP19C0026
Award Amount (SAM.gov award notice)
$8.1M
Award Date
Sep 12, 2019
Awardee
Awardee UEI
KL4CTAB43EG3
Original Solicitation
Notice ID: 9e8a5828c5b29db99d4aa4b6b106a3bd
Posted Date: Sep 12, 2019
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912EP19B0021- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 5×Pre-SolicitationJun 28, 2019
PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL
- SolicitationAug 16, 2019
PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL
- AwardedCurrentSep 12, 2019
PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912EP19B0021
Archive Date
Sep 27, 2019
Office Address
JACKSONVILLE, FL, 32207-0019