GovChime
Notice ID: ae3695a7f9ad42168a34ef6dd8862c23Solicitation

Central Everglades Planning Project (CEPP) Contract 1 L-67a Structures (S-631, S-632, and S-633), Spoil Pile Removal and L-67C Gap, Miami-Dade County, Florida

Archived on September 16, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
August 26, 2020
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
Place of performance
FL
Last updated
Apr 29, 2026

Identifiers

Solicitation number
W912EP20R0021
Notice ID
ae3695a7f9ad42168a34ef6dd8862c23

Description

Amendment 0002 has been posted. See attachments Amendment 0001 has been posted. See attachments The site visit summary and sign in sheet has been included in this posting. This notice has been amended to include an extension to the ProjNet due date. The due date for inquiries has been extended to close of business 13 August 2020. This change will be included in a future amendment. Please refer to the attached solicitation documents for the following project description: The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41). The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6 x 6 gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000 gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000 gap and spoil islands are other sources of backfill material. Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912EP20R0021
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentJul 28, 2020

    Central Everglades Planning Project (CEPP) Contract 1 L-67a Structures (S-631, S-632, and S-633), Spoil Pile Removal and L-67C Gap, Miami-Dade County, Florida

    Notice ae3695a7f9ad42168a34ef6dd8862c23 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP20R0021

Archive Date

Sep 16, 2020

Office Address

JACKSONVILLE, FL, 32207-0019