GovChime
Notice ID: d25906d142354e6c99b8feac07362efaSolicitation

COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

Archived on December 31, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
September 4, 2020
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
Place of performance
FL
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EP20R0031
Notice ID
d25906d142354e6c99b8feac07362efa

Description

PLEASE NOTE: THE DATE FOR THE PREPROPOSAL CONFERENCE HAS BEEN CHANGED FROM WEDNESDAY, AUGUST 26, 2020 @ 10:00 TO 11:00 AM LOCAL TIME TO THURSDAY, AUGUST 27, 2020 @ 10:00 TO 11:00 AM LOCAL TIME. The BBCW Contract 5A covers the construction of Pump Station S-705. The S-705 pump station has a capacity of 100 cfs and is located on the L-31E Canal at the intersection with the C-102. S-705 will pump water into an L-31E Canal segment, south of C-102 and north of Military Canal. The water in this segment will flow, through culverts, into wetlands east of the L-31E Levee. S-705 will also feature a 72-inch culvert with a slide gate to pass flows for internal drainage. The pump station will have manatee protective barriers, trash racks, and dewatering features, complete with stop logs. The slide gate at S-705 will be operated by an electric-motor actuator. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps and gate will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, an HDPE culvert, a slide gate, precast, concrete, control buildings, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. In-water construction utilizing divers will be necessary, because of dewatering difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EP20R0031
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationJul 15, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATIONS S-703 AND S-705; RECREATIONAL SITES; MIAMI-DADE COUNTY, FLORIDA

    Notice f4f8e012589944efb74e291ad67cf24f on SAM.gov

  2. SolicitationAug 14, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

    Notice 05c5ab35da444721a8df5db22c93d0a1 on SAM.gov

  3. Pre-SolicitationAug 14, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

    Notice 9d20b37676844ec7bb9eaab8cb16a584 on SAM.gov

  4. SolicitationAug 21, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

    Notice 8ac1b5fb6c00480e807ee788c69b97a4 on SAM.gov

  5. Pre-SolicitationAug 21, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

    Notice aff1a408309b4cb29c7e031ed22e6b8f on SAM.gov

  6. 4×
    SolicitationCurrentAug 28, 2020

    COMPREHENSIVE EVERGLADES RESTORATION PLAN; BISCAYNE BAY COASTAL WETLANDS; L-31E FLOW-WAY; CONTRACT 5A (A PHASE I PROJECT): PUMP STATION S-705; MIAMI-DADE COUNTY, FLORIDA

    Notice d25906d142354e6c99b8feac07362efa on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP20R0031

Archive Date

Dec 31, 2020

Office Address

JACKSONVILLE, FL, 32207-0019