GovChime
Notice ID: 9e38803caf0f4bce902870753bffdbeeSolicitation

TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

Archived on November 30, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
June 28, 2022
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
Place of performance
Tampa
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EP22B0004
Notice ID
9e38803caf0f4bce902870753bffdbee

Description

A Pre-Bid Conference will be held on Monday, 18 April 2022 from 10:00am – 11:00am, Local Time via web-ex @ https://usace1.webex.com/meet/timothy.g.humphrey. The call-in number is: 1-844-800-2712 Access code: 199 392 9265. It is requested that an email be sent to Timothy.G.Humphrey@usace.army.mil to confirm attendance by your organization. DESCRIPTION OF WORK: The project work consists of a base and two options. The base work includes maintenance dredging the locations shown on the drawings within Egmont Cut-1, Egmont Cut-2, Mullet Key and Cut-A (TB). Option A work includes maintenance dredging the locations shown on the drawings within Egmont Cut-1 from station 122+00 to 368+00. Option B work includes maintenance dredging the locations shown on the drawings within Egmont Cut-1 from station 368+00 to 460+00. All dredging areas will incorporate 2 feet of allowable overdepth. Dredged material will be placed in the designated beach disposal area on Egmont Key. Additional work includes turbidity monitoring, sea turtle trawl sweeping and relocation, environmental, vibration monitoring, species observation, and beach tilling. PROPOSAL REQUIREMENTS: The Invitation for Bid (IFB) will be issued on or about April 4, 2022, and bids will be due on or about May 4, 2022 NAICS Code 237990, size standard $30.0 million. Magnitude of construction is between $10,000,000 and $25,000,000. The contractor shall begin performance within 60 calendar days and complete performance within 185 calendar days after the NTP to include 135 calendar days for the Base (including 60 Calendar Day Commencement), 10 calendar days for Option A and 40 Calendar Days for Option B. The performance period is mandatory. THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. NOTES: FAR Clause 52.219-9 Small Business Subcontracting Plan will be included in the solicitation and resulting contract. To be considered small for the purposes of this Government procurement, a firm must perform/dredge, with its own equipment or equipment owned by another Small Business concern, at least 40 percent of the volume dredged. In accordance with FAR 19.1309(b)(1), FAR Clause 52.219-4, Notice of Price Evaluation for HUBZone Small Business Concerns, will be included in the Solicitation and resulting Contract. Solicitation will be issued in electronic format only and will be posted on the Sam.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EP22B0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 18, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice fc6989c041a74813848a537705390132 on SAM.gov

  2. SolicitationApr 4, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice aced823d70da447f900ecef5e5937f59 on SAM.gov

  3. 2×
    Pre-SolicitationApr 4, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice 0c84d622b39243d89d24e26c80579a16 on SAM.gov

  4. 2×
    SolicitationApr 12, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice 5575627cf0594ca0bc73ec9320cc1d14 on SAM.gov

  5. 2×
    Pre-SolicitationApr 15, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice bd4423e82a9f4934916f294a625ab310 on SAM.gov

  6. 7×
    SolicitationCurrentApr 15, 2022

    TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT PROJECT – MULLET KEY CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY, FLORIDA

    Notice 9e38803caf0f4bce902870753bffdbee on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EP22B0004

Archive Date

Nov 30, 2022

Office Address

JACKSONVILLE, FL, 32207-0019