Notice ID: 7c405a05a2064972a4439f4fc2062020Solicitation
Kissimmee River Restoration Project S-69 Weir Repair, Okeechobee and Highlands Counties, Florida
Archived on December 20, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- October 23, 2023
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST JACKSNVLLE
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912EP23B0021
- Notice ID
- 7c405a05a2064972a4439f4fc2062020
Description
The scope of work for this project is to re-establish a permanent concrete weir to the design elevations shown in the Drawings near the northwest corner of the S-69 Weir. The scope of work within the northwest corner includes demolition of the temporary repair and the existing structure, construction of new cast-in-place concrete works, and placement of existing riprap in the sump. Demolition work includes removal of the entire temporary weir (riprap and non-excavatable CLSM), removal and stockpile of select areas of riprap and gravel in the sump to the limits and elevations shown in the Drawings, complete removal of the concrete cap to the limits shown in the Drawings, select removal of the concrete driving slab to the limits shown in the Drawings, and select cutting of the existing steel sheet pile to the limits and elevations shown in the Drawings. Concrete works include incidental earthwork (excavation, compaction and backfill), and complete construction of a slab-on grade with a turned-down edge, a concrete haunch, and two sections of concrete cap. Concrete construction include placement of steel reinforcing, placement of formwork, placement of steel dowels, placement of expansion joints, placement of ready-mix concrete, finishing and curing of placed concrete. In addition, concrete works include placement of foundation grout beneath the existing concrete driving slab through cored holes within the slab to fill voids that were not entirely filled during the temporary repair. The scope of work also includes placement of the previously excavated and stockpiled riprap and gravel adjacent to the weir. The access to the work area is the existing gravel-surfaced levee and by a temporary access road along the exterior limits of the weir sump as shown in the drawings. The materials for the access road are from the area designated in the drawings. The temporary access road will be removed at the conclusion of construction. The existing gravel-surfaced levee will be maintained throughout the duration of construction.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912EP23B0021- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 5, 2023
KISSIMMEE RIVER RESTORATION PROJECT, CONTRACT 12A S-69 WEIR REPAIR, HIGHLANDS AND OKEECHOBEE COUNTIES, FLORIDA
- 5×SolicitationCurrentSep 20, 2023
Kissimmee River Restoration Project S-69 Weir Repair, Okeechobee and Highlands Counties, Florida
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912EP23B0021
Archive Date
Dec 20, 2023
Office Address
JACKSONVILLE, FL, 32207-0019