Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
Archived on June 20, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- April 18, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST JACKSNVLLE
- Place of performance
- Saint Marys, 31558
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912EP24B0004
- Notice ID
- fe00a8c2cdb049049df107f285fb3e02
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
W912EP24B0004- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationJan 12, 2024
Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
- SolicitationFeb 7, 2024
Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
- Pre-SolicitationFeb 7, 2024
Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
- 11×SolicitationCurrentFeb 21, 2024
Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FY26 Brunswick Inner Harbor Dredging Project | - | Awarded | Open |
Amendment 0001 updates the Bid Opening Link. | - | Solicitation | 07/17/2026 |
THIS IS A PRE-SOLICITATION: This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The Brunswick Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, and the duration is expected to be 120 days from notice to proceed. Up to 835 thousand cubic yards of maintenance material is expected to be removed from the inner harbor.The work is located in Brunswick Harbor Georgia deep draft navigation project. Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall. The dredging in the Brunswick Inner Harbor primarily takes place in the East River (station 0+000 to 12+000) which includes the East River Turning Basin and the Transition Areas leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (station 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that generally requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 34+000 to 43+000) and Brunswick River (station 22+000 to 26+000) in the Brunswick Inner Harbor are other areas that may require dredging and are primarily dredged when shoaling become problematic to navigation but are constantly monitored monthly. Approximately 550,000 cubic yards of material is anticipated to be removed from the East River, approximately 85,000 cubic yards of material is anticipated to be removed from the South Brunswick River, approximately 50,000 cubic yards of material is anticipated to be removed from the Brunswick River and approximately 10,000 cubic yards of material is anticipated to be removed from the Lower Turtle River this dredging cycle.The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor. | - | Pre-Solicitation | 06/15/2026 |
FY25 Atlantic Intracoastal Waterway Maintenance Dredging - Select Site | - | Solicitation | 01/14/2026 |
This solicitation is for the Tybee Island Shoreline Protection Project. This acquisition is being offered as an unrestricted full and open competitive solicitation and will result in a single Firm Fixed- Price Contract Award. The construction magnitude for this project is between $10,000,000.00 and $25,000,000.00. | - | Solicitation | 12/10/2026 |
Additional Details
Solicitation Number
W912EP24B0004
Archive Date
Jun 20, 2024
Office Address
JACKSONVILLE, FL, 32207-0019