GovChime
Notice ID: fe00a8c2cdb049049df107f285fb3e02Solicitation

Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia

Archived on June 20, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
April 18, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST JACKSNVLLE
Place of performance
Saint Marys, 31558
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912EP24B0004
Notice ID
fe00a8c2cdb049049df107f285fb3e02

Description

DESCRIPTION OF WORK: This project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.LOCATION REQUIRED DEPTHRange H to I and Upper Turning 45-foot UTB, 45-foot and 47-footBasin (UTB)Range G to H and Explosive 44-foot and 47-footHandling Basin (EHB)Range E to G and Magnetic 44-footSilencing Facility (MSF) NorthSite Six North (SS-N) 39-footSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footSmall Boat Basin 24-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring Facilityb. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.LOCATION REQUIRED DEPTHSite Six South (SS-S) and Medium Auxiliary 45-footRepair Dock (ARDM) YokeSite Six North (SS-N) 39-footExplosive Handling Wharves (EHW) 47-footRefit Wharves 47-footDry Dock Caisson Gate Sill and Dry Dock 46-footCaisson Gate Mooring FacilityOption C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912EP24B0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationJan 12, 2024

    Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia

    Notice 8b67e46ec9c046018c76972aeec949f9 on SAM.gov

  2. SolicitationFeb 7, 2024

    Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia

    Notice 59b9b0a320754634b500e445809e8d13 on SAM.gov

  3. Pre-SolicitationFeb 7, 2024

    Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia

    Notice 80f1ca21c4264c30b1f39a7ea0f7822f on SAM.gov

  4. 11×
    SolicitationCurrentFeb 21, 2024

    Naval Submarine Base Kings Bay, Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia

    Notice fe00a8c2cdb049049df107f285fb3e02 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
FY26 Brunswick Inner Harbor Dredging Project
-AwardedOpen
Amendment 0001 updates the Bid Opening Link.
-Solicitation07/17/2026
THIS IS A PRE-SOLICITATION: This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The Brunswick Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, and the duration is expected to be 120 days from notice to proceed. Up to 835 thousand cubic yards of maintenance material is expected to be removed from the inner harbor.The work is located in Brunswick Harbor Georgia deep draft navigation project. Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall. The dredging in the Brunswick Inner Harbor primarily takes place in the East River (station 0+000 to 12+000) which includes the East River Turning Basin and the Transition Areas leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (station 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that generally requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 34+000 to 43+000) and Brunswick River (station 22+000 to 26+000) in the Brunswick Inner Harbor are other areas that may require dredging and are primarily dredged when shoaling become problematic to navigation but are constantly monitored monthly. Approximately 550,000 cubic yards of material is anticipated to be removed from the East River, approximately 85,000 cubic yards of material is anticipated to be removed from the South Brunswick River, approximately 50,000 cubic yards of material is anticipated to be removed from the Brunswick River and approximately 10,000 cubic yards of material is anticipated to be removed from the Lower Turtle River this dredging cycle.The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.
-Pre-Solicitation06/15/2026
FY25 Atlantic Intracoastal Waterway Maintenance Dredging - Select Site
-Solicitation01/14/2026
This solicitation is for the Tybee Island Shoreline Protection Project. This acquisition is being offered as an unrestricted full and open competitive solicitation and will result in a single Firm Fixed- Price Contract Award. The construction magnitude for this project is between $10,000,000.00 and $25,000,000.00.
-Solicitation12/10/2026

Additional Details

Solicitation Number

W912EP24B0004

Archive Date

Jun 20, 2024

Office Address

JACKSONVILLE, FL, 32207-0019