Notice ID: 99240b932f9341bdb6ab64d5e15fd50cSolicitation
Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, Palm Beach County, FL.
Archived on March 29, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- March 29, 2024
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST JACKSNVLLE
- Place of performance
- Palm Beach, FL
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912EP24R0002
- Notice ID
- 99240b932f9341bdb6ab64d5e15fd50c
Description
The Jacksonville District has a new requirement for Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, located in Palm Beach County, FL. The Scope of Work for this project includes the following features: Clearing, grubbing, de-mucking/removal of overburden, blasting, excavation, and processing of several million cubic yards of earthen material for the construction of a 17.75 miles-long D-623 embankment dam. Embankment height will be 38.0 ft above average natural grade in the north, east, and west: and 34.0 ft above average natural grade in the south. Work will also include construction of four multi-barrel, gated outlet-work structures (S-624, S-625, S-626, and S-628), one un-gated overflow spillway section (S-627), as well as one multi-bay, gated inline-spillway (S-629).In addition, the work will include rock foundation preparation, installation of a seepage cutoff wall, canal filling, and all incidental related work to prepare approximately 2 miles of foundation for the 17.75 miles-long D-623 embankment dam. Rock foundation preparation and cutoff wall installation for the remaining 15.75 miles will be completed by others prior to this contracts conclusion. The approximate toe to toe width of the foundation is 260 feet in the north, east, and west; and 235 feet in the south. Lastly, the work will include construction of approximately one mile of parallel open channels (canals) as well as a maintenance road with benches between the canals. The northern most canal (C-636 seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The southernmost canal (C-623 Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and a depth of 16.5 feet below average natural ground surface. The maintenance road and benches will separate C-623 and C-636 by approximately 65 feet and will have a minimum crest width of 14 feet 4.5 feet above average natural ground surface. Surface and subsurface water management will be required to control surface and groundwater levels and conduct work in the dry at various locations within the construction limits in accordance with applicable contract specifications. All lands for this project are owned by the South Florida Water Management District (SFWMD) and will be provided to the USACE for construction of these project features. Pursuant to DFARS Clause 252.232-7007- Limitation of Governments Obligation, to be included in the solicitation, the awarded contract will be incrementally funded. The estimated period of performance is 3,652 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government. ***Pre-proposal conference information is provided via amendment 0001*** ***Amendment 0002 posted in PIEE 22 March 2024*** ***Amendment 0003 posted in PIEE 29 March 2024***
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912EP24R0002- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationDec 15, 2023
Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, Palm Beach County, Florida
- 7×SolicitationCurrentFeb 23, 2024
Central Everglades Planning Project (CEPP) Contract 11B, Everglades Agricultural Area (EAA) A-2 Reservoir Embankment and Structures, Palm Beach County, FL.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources Sought for Bayou Meto Canal 1000, Phase 4.1, Check Structure, Lonoke County, AR SEE ATTACHMENTS FOR MORE INFORMATION | 74% | Market Research | 11/05/2026 |
Please see attachment for Sources Sought information. | 73% | Market Research | 12/14/2026 |
CORPUS CHRISTI SHIP CHANNEL PLACEMENT AREA INNER HARBOR IMPROVEMENTS | 73% | Solicitation | 07/13/2026 |
This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers ? Chicago District to inform interested vendors of the district?s intent to issue a solicitation for Lake George East Phase II Dredging, East Chicago, Lake County, Illinois. PROJECT INFORMATION: The Lake George East Phase II Dredging project includes removal of contaminated sediments in the Lake George Canal (LGC) section of the Indiana Harbor Canal (IHC) via mechanical dredging with appropriate environmental monitoring and controls to improve sediment quality, water quality, and habitat within the LGC. Sediment within the LGC contains elevated concentrations of metals, volatile and semi-volatile organic compounds, and polychlorinated biphenyls (PCBs) due to legacy contamination from adjacent and upstream sources. Dredged material will be hydraulically placed into the IHC confined disposal facility (CDF) adjacent to the LGC. The project may include sediment sampling at the dredged surface to determine if further remediation is required to achieve project remediation goals. Further remediation, if needed, will be performed under a separate project. ACQUISITION INFORMATION: Competition for this acquisition is RESTRICTED to SMALL BUSINESS CONCERNS. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $37 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000.00. The requirement is for 545 calendar days: one (1) year and six (6) months. The solicitation package is planned for advertisement Second Quarter Fiscal Year 2026 and bids are planned to be opened in the Second Quarter of Fiscal Year 2026. The solicitation will be downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website, interested bidders may download the full package, which includes- specification and drawing files. IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. The Point of Contract for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil. Please include Solicitation number W912P626BA015 on all correspondence. | 72% | Pre-Solicitation | Open |
Update - BID OPEING LOG IN INSTRUCTIONS for August 19, 2026 **AM03 - Updates Section 00 70 00 to include Clause 52.217-5. Nothing else is changed by way of this amendment* AM02 - Updates to Sections 00 07 00, 00 73 46, 01 57 19 and revised plan drawings. AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are 76 ft MLLW, and LARE channel depths are as deep as 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labeled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only. | 70% | Solicitation | 08/19/2026 |
Additional Details
Solicitation Number
W912EP24R0002
Archive Date
Mar 29, 2025
Office Address
JACKSONVILLE, FL, 32207-0019