Notice ID: a1e4c940bc9e2aee2cf79ce046687f80Award NoticeAwarded
Elk Chutes Set-Back Levee
Awarded on August 9, 2019. Full description on SAM.gov.
Awarded tounder W912EQ19C0008 (source: SAM.gov award notice)• $14.5M
Overview
- Posted
- August 16, 2019
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of War
Notice details
- Place of performance
- 167 North Main St , Memphis, TN, 38103
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Aug 9, 2019
- Award amount (SAM.gov award notice)
- $14.5M
Identifiers
- Solicitation number
- W912EQ19B0006
- Notice ID
- a1e4c940bc9e2aee2cf79ce046687f80
- Award number (PIID)
- W912EQ19C0008
Description
Project Description: The work consists of furnishing all plant, labor and materials for construction of approximately 5 miles of degrading an existing levee on the north bank of Belle Fountain Ditch and the construction of the corresponding 5 miles of Elk Chute Levee with associated berms and ditches. Construction also includes the construction of four single, double and triple barrel cast in place reinforced concrete box culverts and two 42-inch precast reinforced concrete pipe culverts with associated gates and any incidental related work according to the specifications and plans. This project shall include: St Francis Basin Maintenance, Elk Chute Levee Setback, Elk Chute Drainage District and Dunklin County, CO. Location: The work shall be located at a the segment beginning at the intersection of MO-TT and Belle Fountain Ditch and extends to the west to the north-south reach of Elk Chute Levee adjacent to Little River floodway north of Gosnell, Arkansas, approximately as indicated. The exact location will be indicated on future contract drawings. North American Industry Classification System: 237990 Other Heavy and Civil Engineering Construction Small Business Size Standard: $36.5M. Acquisition Strategy: This procurement will be advertised as an IFB (Invitation for Bid) Contract Duration: 840 calendar days Magnitude of Work: Between $10 Million and $20 Million Invitation for Bid: 03 Jul 2019 Bid Due Date: 06 Aug 2019 The Solicitation Number will be W912EQ19B0006. Bidders must be registered with the System for Award Management (SAM), including the NAICS code they are bidding under, in order to receive a Government contract award. To register, the SAM Internet address is: http://www.sam.gov. Potential bidders are responsible for monitoring this site for the release of the solicitation package and any other pertinent information and for downloading their own copy of the solicitation package. This notice does not obligate the Government to award a contract nor does it obligate the Government to pay for bid preparation costs. If you have any additional questions, contact Kimberly Daniel-Ray at email kimberly.s.danielray@usace.army.mil.
Award Overview
Award Number
W912EQ19C0008
Award Amount (SAM.gov award notice)
$14.5M
Award Date
Aug 9, 2019
Awardee
Awardee UEI
DBH5WCHCSDK8
Original Solicitation
Notice ID: a1e4c940bc9e2aee2cf79ce046687f80
Posted Date: Aug 16, 2019
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- —Signed Jul 24, 2026
- $2.5KSigned Mar 9, 2026
- —Signed Nov 26, 2025
- $17.1MSigned Feb 12, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912EQ19B0006- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationJun 12, 2019
Elk Chutes Set-Back Levee
- AwardedCurrentAug 16, 2019
Elk Chutes Set-Back Levee
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources Sought for St Francis Town Levee Renovation, St Francis, AR SEE ATTACHMENTS FOR MORE INFORMATON | - | Market Research | 11/23/2026 |
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted. Amendment 0002 has been posted. | - | Solicitation | 11/03/2026 |
Sources Sought for Bayou Meto Canal 1000, Phase 4.1, Check Structure, Lonoke County, AR SEE ATTACHMENTS FOR MORE INFORMATION | - | Market Research | 11/05/2026 |
Bayou Meto Canal 1000 Phase 4.2 Please see the attached three (3) documents: Sources Sought document, Market Research PLANS document, Market Research SPECIFICATIONS document. | - | Market Research | 10/30/2026 |
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. | - | Pre-Solicitation | 09/17/2026 |
Additional Details
Solicitation Number
W912EQ19B0006
Archive Date
Aug 30, 2019
Office Address
MEMPHIS, TN, 38103-1894