Notice ID: 96d0caa2a8114ea0bc65c7733a77cf26Solicitation
Multi-Mission Surface Combatant (MMSC) Facility and Infrastructure, Kingdom of Saudi Arabia. Previously identified as W912ER22R0033.
Archived on February 13, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- February 8, 2023
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W31R ENDIS MIDDLE EAST
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912ER23R0005
- Notice ID
- 96d0caa2a8114ea0bc65c7733a77cf26
Description
Multi-Mission Surface Combatant (MMSC) Facility and Infrastructure, Kingdom of Saudi Arabia. Previously identified as W912ER22R0033.19DEC22: Final Solicitation Specifications and Drawings posted 19DEC22. Final Solicitation package and Cost Breakdown Sheet posted 13FEB23.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912ER23R0005- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeDec 19, 2022
Multi-Mission Surface Combatant (MMSC) Facility and Infrastructure, Kingdom of Saudi Arabia. Previously identified as W912ER22R0033.
- 2×SolicitationCurrentJan 13, 2023
Multi-Mission Surface Combatant (MMSC) Facility and Infrastructure, Kingdom of Saudi Arabia. Previously identified as W912ER22R0033.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
CUSTOMS AND BORDER PROTECTION BROWN FIELD BORDER PATROL STATION VEHICLE MAINTENANCE FACILITY SAN DIEGO COUNTY, CA | 65% | Pre-Solicitation | 11/11/2026 |
Project Labor Agreement Survey - Construction of Pavement and Maintenance Facility at Grand Forks Air Force Base, North Dakota. | 65% | Special Notice | 04/10/2026 |
This solicitation pertains to a Full and Open Firm Fixed-Price Contract for design-bid-build construction services in support of the U.S. Army Corps of Engineers (USACE) Southwestern Middle East District (SWM) Apache Alert Mission Complex for the Kuwait Air Force (KAF) at Ali Al Salem Airbase, Kuwait. | 63% | Solicitation | 01/08/2027 |
Pre-Solicitation Notice for Apache Alert Mission Complex Anticipated Solicitation Issue Date: November 2026 Anticipated Solicitation Response Date: December 2026 Set Aside: As the work will be performed outside of the continental United States, no set asides to small business or socioeconomic preference for this solicitation. NAICS: 236220 -- Commercial and Industrial Building Construction, and the Small Business Size Standard is $45,000,000. Contracting Office Address: US Army Corps of Engineers – Middle East District, 201 Prince Frederick Drive, Winchester, VA, 22602 SYNOPSIS: SWM is anticipating a Design-Bid-Build (DBB) award for the Construction of facilities to support and enhance the Apache Alert Mission at Ali Al Salem Air Base in the country of Kuwait. PROJECT SCOPE: The facilities to be constructed include: Four Alert Shelters with Aprons Logistics Readiness Center Maintenance Supply Warehouse with Exterior Storage Shade Guard House Pilot Readiness Facility Petroleum Oil Lubricant (POL) Shed Fire Water Pump House with Water Tank Alert Magazine (option) Forward Arming and Refueling Point (FARP) Parking Sunshades Bunkers Three Electrical Substations All site utilities, incl. Stormwater, Domestic Water, Fire Water, Sanitary Sewer with Lift Station and Leach Field, and Site Electrical and Communications Site Development, incl. Taxiway, Vehicular Pavement, and Parking Lot Helipad and Taxiway Rehabilitation (option) Hardened Aircraft Shelter (HAS) Demolition (option) FARP Expansion (option) Paved Access to Practice Runway (option) The project includes all utilities, site improvements, new concrete aprons, airfield and vehicular pavements, detection and protection features, security enhancements, and other supporting work necessary to construct complete and useable facilities. The project is phased to maintain uninterrupted airfield and squadron alert and training operations during construction. The Period of Performance is anticipated to be 1,355 calendar days from issuance of Notice to Proceed. PROPOSAL PROCEDURES: The Request for Proposal (RFP) will be issued on SAM.GOV. It is anticipated that the Best Value Trade-Off (BVTO) contracting method will be used to evaluate proposals. Evaluation criteria will be stated in the RFP. RESPONSE PERIOD: This is a pre-solicitation notice and is not a request for proposal (RFP) nor does it restrict the Government as to the ultimate acquisition approach. A response to this notice is not required. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. Questions can be sent to Maria Martin, e-mail: Maria.L.Martin@usace.army.mil and Tracy Gusukuma, e-mail: tracy.m.gusukuma@usace.army.mil. | 63% | Pre-Solicitation | Open |
The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover. Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission. The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement. | 61% | Solicitation | 11/24/2026 |
Additional Details
Solicitation Number
W912ER23R0005
Archive Date
Feb 13, 2023
Office Address
WINCHESTER, VA, 22604-1450