GovChime
Notice ID: 17aeec226a88a3cca12150f9c395ed45Solicitation

Z--Lock and Dam Number 5 Concrete I-Wall Repairs

Archived on December 29, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:59 AM UTC+01:00
Posted
November 9, 2009
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238110: Poured Concrete Foundation and Structure Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ST PAUL
Place of performance
US Army Engineer District, St. Paul Contracting Division CEMVP-CT, 190 East Fifth Street St. Paul MN 55101-1638 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912ES09B0024
Notice ID
17aeec226a88a3cca12150f9c395ed45

Description

Pre-Solicitation Synopsis Lock and Dam 5 I-Wall Repairs Lock and Dam No. 5 is located approximately 18 miles north of Winona, MN, on US 61. The contractor will be responsibly for the demolition and repair of the concrete wall sections. The Government shall dewater the lock chamber so that the awarded party can conduct the repair. The repair schedule consists of repairing the initial four to six inches of surface concrete on several monoliths throughout the intermediate wall (I-wall). The estimated surface area is 2000 ft2 with an estimated volume of 1000 ft3. The awarded party shall have from Dec. 1, 2009 to March 1, 2009 to complete the work. Please contact the following with questions. This acquisition is a total small business set-aside. The point of contact is Mr. Lee L. Wright,Contracting Officer, email lee.l.wright@usace.army.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912ES09B0024
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 6×
    Pre-SolicitationSep 30, 2009

    Z--Lock and Dam Number 5 Concrete I-Wall Repairs

    Notice 0082a7ce1b024520cddd87c06a0ae803 on SAM.gov

  2. SolicitationCurrentNov 9, 2009

    Z--Lock and Dam Number 5 Concrete I-Wall Repairs

    Notice 17aeec226a88a3cca12150f9c395ed45 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
***A pre-construction site visit is scheduled at 10:00 AM Central Time, 10 November 2026 at the Rock Island Arsenal – Joint Manufacturing and Technology Center (RIA-JMTC). Attendees will park in the South side of the JMTC building complex in lot B212 then meet Government representatives at the turnstile. All attendees will be required to wear steel-toed safety shoes and safety glasses. Reservations for this site visit are mandatory for all attendees at least one business day prior to the site visit. If you currently have badge access, you still must make a reservation for the site visit in order for the Government to control the number of attendees at any given time. You will not be allowed to attend without a reservation regardless of installation access. Vendors who do not have an access badge to RIA must request access via following: The Visitor Access Form, instructions, and “How Do I Get on Post?” flowchart can be found at https://home.army.mil/ria/about/visitor-information. Click on Pass Request Information (middle right), to Visitor Access Form and follow all instructions contained therein. POC for this action is Contract Specialist, Leigh Weeks, leigh.a.weeks2.civ@army.mil. The solicitation for this requirement will be posted on 04 November 2026. This pre-solicitation synopsis is to notify the public that a solicitation will be forthcoming for Concrete Pads in building 220 and 299. This solicitation will result in a Firm Fixed Price contract at the Rock Island Arsenal, Joint Manufacturing and Technology Center (RIA-JMTC). All details will be in the solicitation itself. Estimated issue date for the solicitation is on or around 04 November 2026. This solicitation will be issued electronically in accordance with FAR 4.502 and 5.102, therefore, hard copies will not be provided, although may be downloaded on or after the issue date by accessing SAM.gov. CAUTION: This solicitation will be issued electronically as will any amendments thereto. Because of this, the Government is under no obligation and is in fact unable to maintain an interested party list, therefore, it is recommended that any interested parties periodically access the above internet address in order to obtain amendments which may be issued. Failure to obtain any said amendments and respond to them prior to the date and time set may render your quote nonresponsive and result in the rejection of the same. All responsible sources may submit a quote which will be considered by the Government. **Please note, this is a notice that a solicitation is anticipated to be forth coming and will be posted on or around 04 November 2026 that will have all the necessary specifications.
-Solicitation11/20/2026
The U.S. Army Corps of Engineers, Wilmington District is requesting all labor, materials, and equipment necessary to install a 24ft-10in x 34ft-4in concrete pad with column foundations for a prefabricated shelter at the B. Everett Jordan Dam Tailrace Park. The Contractor shall provide all labor, quality control, equipment, fuel, supplies, and transportation necessary for the performance of the concrete pad installation in strict accordance with the Statement of Work. The resulting award issued from this request will result in one award.
-Solicitation11/10/2026
Requesting a company to fill craters with concrete.Reason for Amendment is to add Secondary Contacts and select Total Small Business Set-Aside
-Combined Synopsis05/20/2026
Notice ID: W911S226U2273Primary Solicitation Manager: Nfamory ToupouSubject: Description: 593D CSC needs 57 cubic yards of concrete poured over 2 days. The concrete must have a 5 inch slump and have a 4000 psi capability. The vendor does not need to provide labor. Soldiers will provide the labor. The vendor only needs to provide the concrete and a mixer to deliver/pour it. The concrete shall meet the following specifications. Concrete will be at 3,500 psi when fully cured. The slump of the concrete will be no more than 3 inch. Specified compressive strength FC is MPA 3,000 psi at 28 days. Air content must be between 4.5 and 7.5 percent-Maximum water-cementitious material ratio is 0.50 surfaces permanently exposed to view shall be so that the final color when cured is the same as adjacent concrete.
-Combined Synopsis12/12/2025
-AwardedOpen

Additional Details

Solicitation Number

W912ES09B0024

Archive Date

Dec 29, 2009