Notice ID: 9329aca0737f4f0fb02bc98c8ae6ce92Solicitation
RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project
Archived on January 31, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- December 9, 2021
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ST PAUL
- Place of performance
- Fargo, ND
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912ES22R0001
- Notice ID
- 9329aca0737f4f0fb02bc98c8ae6ce92
Description
Amendment 0006 removes DFARS 252.223-7999 COVID-19 Clause (1 attachment). Amendment 0005 updates the Price Schedule, MN WD, Spec Section 31 62 14.01 12, and 3 plan sheets (4 attachments). Amendment 0004 updates the ND WD, Specs and Plans (3 attachments). Amendment 0003 updates Offers Due Date, Specs, Plans, Technical Factor Worksheet (5 attachments). For Informational Purposes Only - the Red River Structure Site Visit Attendees List is attached (1 attachment). Vendors are experiencing difficulties viewing and accessing the Interested Vendors List within this annoucement. Amendment 0002 updates ND Wage Determination, Specs and Plans (3 attachments). Amendment 0001 updates RRS Site Visit information (1 attachment). Updated Announcement to include RRS Plans. The U.S. Army Corps of Engineers, St. Paul District, has a requirement for construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Area Flood Risk Management Project per Plans and Specifications (attached). The Red River Structure includes, but is not limited to, a gated structure, dam walls, vehicle service bridge, mechanical platform bridge, stilling basin, dentated end sill, downstream retaining walls, approach apron, slope protection slab and approach walls. The North American Industry Classification System (NAICS) Code is 237990 Other Heavy and Civil Engineering Construction with a size standard of $39.5M. The estimated magnitude of this construction project is between $100,000,000 and $250,000,000. This is a full and open (unrestricted) competition under FAR Part 36, using FAR Part 15 Selection Processes. Payment and Performance Protection is required in accordance with FAR Part 28.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912ES22R0001- Market Research
- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Market ResearchNov 17, 2020
Red River Structure - FMM Area Flood Risk Management Project
- Pre-SolicitationSep 27, 2021
RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project
- 9×SolicitationCurrentOct 12, 2021
RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912ES22R0001
Archive Date
Jan 31, 2022
Office Address
SAINT PAUL, MN, 55101-1323