GovChime
Notice ID: 9329aca0737f4f0fb02bc98c8ae6ce92Solicitation

RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project

Archived on January 31, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
December 9, 2021
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ST PAUL
Place of performance
Fargo, ND
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912ES22R0001
Notice ID
9329aca0737f4f0fb02bc98c8ae6ce92

Description

Amendment 0006 removes DFARS 252.223-7999 COVID-19 Clause (1 attachment). Amendment 0005 updates the Price Schedule, MN WD, Spec Section 31 62 14.01 12, and 3 plan sheets (4 attachments). Amendment 0004 updates the ND WD, Specs and Plans (3 attachments). Amendment 0003 updates Offers Due Date, Specs, Plans, Technical Factor Worksheet (5 attachments). For Informational Purposes Only - the Red River Structure Site Visit Attendees List is attached (1 attachment). Vendors are experiencing difficulties viewing and accessing the Interested Vendors List within this annoucement. Amendment 0002 updates ND Wage Determination, Specs and Plans (3 attachments). Amendment 0001 updates RRS Site Visit information (1 attachment). Updated Announcement to include RRS Plans. The U.S. Army Corps of Engineers, St. Paul District, has a requirement for construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Area Flood Risk Management Project per Plans and Specifications (attached). The Red River Structure includes, but is not limited to, a gated structure, dam walls, vehicle service bridge, mechanical platform bridge, stilling basin, dentated end sill, downstream retaining walls, approach apron, slope protection slab and approach walls. The North American Industry Classification System (NAICS) Code is 237990 Other Heavy and Civil Engineering Construction with a size standard of $39.5M. The estimated magnitude of this construction project is between $100,000,000 and $250,000,000. This is a full and open (unrestricted) competition under FAR Part 36, using FAR Part 15 Selection Processes. Payment and Performance Protection is required in accordance with FAR Part 28.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912ES22R0001
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Market ResearchNov 17, 2020

    Red River Structure - FMM Area Flood Risk Management Project

    Notice ff08c09eb163486eb5163e8ea7ab99c5 on SAM.gov

  2. Pre-SolicitationSep 27, 2021

    RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project

    Notice 6c5f4c1afd724a009dae01552e8dd374 on SAM.gov

  3. 9×
    SolicitationCurrentOct 12, 2021

    RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project

    Notice 9329aca0737f4f0fb02bc98c8ae6ce92 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912ES22R0001

Archive Date

Jan 31, 2022

Office Address

SAINT PAUL, MN, 55101-1323